قاسم آل نصر, Field Service Engineer | Surface Pressure Control (Wellhead)

قاسم آل نصر

Field Service Engineer | Surface Pressure Control (Wellhead)

Baker Hughes - Saudi Arabia

البلد
المملكة العربية السعودية - الشرقية
التعليم
بكالوريوس, Electrical and Electronics Engineering
الخبرة
6 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :6 years, 1 أشهر

Field Service Engineer | Surface Pressure Control (Wellhead) في Baker Hughes - Saudi Arabia
  • المملكة العربية السعودية - الدمام
  • أشغل هذه الوظيفة منذ ديسمبر 2019
Graduate Management Program | One Year Rotational Program في General Electric GE Oil & Gas
  • المملكة العربية السعودية - الدمام
  • ديسمبر 2018 إلى ديسمبر 2019
Solar PV Installer في Grid Alternatives
  • الولايات المتحدة - كولورادو - Denver
  • أكتوبر 2017 إلى فبراير 2018

● Cooperated in Installing more than 600 solar panels on a farm located East Denver Intl Airport. ● Installed solar panels systems for low income residential homes. ● Tested each panel on the site before installation.

Electrical Engineering Department Assistant في University of Colorado Denver
  • الولايات المتحدة - كولورادو - Denver
  • سبتمبر 2017 إلى فبراير 2018

● Assisted Instructors with (Ongoing) Project/Research.” Active X-Ray Dosimetry System”
● Assisted Instructors in class/laboratory preparation.
● Maintained of Five Electrical Engineering laboratories.

Project Engineer ( Internship ) في Saudi Aramco
  • المملكة العربية السعودية - الحصينية
  • يوليو 2016 إلى سبتمبر 2016

● Reviewed contracts and understood the associated scope of work (SOW), terms and conditions and related standards. ● Reviewed Electrical Design for Primary Roads & Major Utilities Project and followed up with Submittal letters/ RFI. ● Attended meetings with contractors & suppliers and prepared reports about work progress. ● Reviewed Procurement’s plan and kept track of delivery schedule. ● Followed up with contractors to address pending design/construction issues and worked on solving them.
● Followed up with manpower to address MV 13.8 kv cables issues and worked on splicing points.
● Followed up with construction Foundation in the pre engineering building (PEB) to install the diesel tank, generator tank etc.
● Followed up with installing the MV cables thru Duct Bank & Direct Burial and the Ring Main Unit (RMU) Foundation.
● Followed up with installing the Foundations for the Transformers, and the excavations for the Switchgear in Grid Station.
● Reviewed Electrical Design drawing for Transmission Lines, Substations and Bulk Supply Point (BSP) Station.

الخلفية التعليمية

بكالوريوس, Electrical and Electronics Engineering
  • في University of Colorado Denver
  • مايو 2017

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس