Work Experience

Total years of experience :20 years, 0 Months

Piping Designer at Global Engineering Consultant
  • India - Kamareddi
  • May 2019 to January 2022

• Review Project Piping Specification, piping standards, piping standard drawings, Piping class, Line List, P&ID’s, PFDs, Overall Plot plan, Unit Plot plans, Equipment vendor drawings, and Instrumentation vendor drawings during design.

• Performed piping routing, cross-check routing with piping spec., P&ID, Supports Check, Bill of Materials and Standards.

Piping Designer at Técnicas Reunidas, S.A.
  • Saudi Arabia - Khobar
  • September 2005 to April 2019

Worked with Técnicas Reunidas on different EPC projects in different locations in Saudi Arabia.

TR Projects which I worked are as follow:-
1. Diesel Hydrotreater (DHT) Project constructing for the client SAUDI ARABIAN Oil Co. (SAUDI ARAMCO) in Yanbu Al-Sinaiyah, Kingdom of Saudi Arabia. (Sept 2005 - Feb 2007)

2. Rabigh Development Project of PetroRabigh Co. (Joint venture of SAUDI ARAMCO & SUMOTUMO Co.) in Rabigh, Kingdom of Saudi Arabia. (Mar 2007 - Mar 2009)

3. Phenolics Facilities Project of Saudi Kayan Petrochemical Complex of SABIC in Jubail, Kingdom of Saudi Arabia. (Mar 2009 - Nov 2010)

4. Jubail Export Refinery Project of Saudi Aramco Total Refining and Petrochemical (SATORP) co. in Jubail, Kingdom of Saudi Arabia. (Dec 2010 - Oct 2012)

5. Yanbu Export Refinery Project of Yanbu Aramco Sinopec Refinery (YASREF) co. in Yanbu, Kingdom of Saudi Arabia. (Nov 2012 - Jul 2014)

6. CHEM III (POD, EO & EOD) Project of Saudi Aramco & Dow Chemicals (SADARA) Co. in Jubail Industrial City, Kingdom of Saudi Arabia. (Nov 2014 - Oct 2015)

7. Jazan Refinery & Terminal Project-(EPC 10&11) of Saudi Aramco Co. in Jazan Economic City, Kingdom of Saudi Arabia. (Nov 2015 to Present)

• Review Project Piping Specification, piping standards, piping standard drawings, Piping class, Line List, P&ID’s, PFDs, Overall Plot plan, Unit Plot plans, Equipment vendor drawings, and Instrumentation vendor drawings during design.
• Performed piping routing, cross-check routing with piping spec., P&ID, Supports Check, Bill of Materials and Standards.
• Performed Piping Design duties with the site design engineering team at the construction site, during construction we have to solve the technical site issues which we received through TQs, RFI's and LBEs. We shall have to perform the changes in Pipe routing, Piping plans, Plot plans & etc. as required
• Incorporate all changes in SP3D/PDS; extract Isometrics and piping drawings to issue for construction as a revised revision by including clouds to highlight changes with Smart Sketch/Microstation.
• Shall have to visit construction sites to solve the site issues; to obtain actual site conditions or check clashes if any, site measurements and other physical data such as execution of work to make changes as per site condition to avoid extra changes if not required; same time discuss with other discipline engineers to solve issues efficiently and economically.
• Involved in 3D Model review with SPR 3D Model with Client and our Engineering team to list out Punch items and LBE points to discuss and to close items which rectified and rise new items for corrections.
• Incorporated piping comments in the Master P&IDs.
• Receives hydro test packages for any mismatching between Isometrics and P&ID if there is any mismatch, update and attached it in packages with update revision. Always incorporate all changes directly in SP3D/PDS and P&ID’s change, update manually in field office Master copy and package copy as a redline mark-up and later on update changes in soft copy to minimize revisions.
• Involved in handover stage to the client in preparing and updating deliverable drawings like As-built drawings & diagrams such as P&ID, Isometrics with Index, Equipment Layouts, Underground Layouts and Piping General Arrangement Drawings.
• Familiar with deliverable items at fabrication & erection.
• Coordinates with Madrid’s Main office design engineering team members for any additional information if required.
• Coordinate with supervisor and Field engineers for the actual field work status.

Designer at Saudi Aramco
  • Saudi Arabia - Yanbu
  • July 2003 to August 2005

Worked with Technical Support Group, YC&OS Division, Yanbu Refinery.

Job Responsibility:

• I’ve to perform existing Facilities rectification and modification so we have to do actual surveys of facilities to obtain physical conditions to prepare Schematics and drawings of Civil, Mechanical and Electrical for the execution of work.
• Coordinate with client engineers during the demolition of existing facilities and to execution of work and have to take permissions from Loss Prevention and other Departments as required.
• HVAC ducting and underground piping utilities modifications and upgrade works for different scales of buildings within the community facilities.
• Assist the Landscape Architects in all their undertakings. Digitizing of maps and contours for landscaping layout, editing, gathering of data and status reports scrutinizing drawings for comments, preparing transmittal documents and safe keeping of classified restricted drawings and documents.
• Prepare architectural and structural working drawings, studies and carpentry details of balconies, card holders, interior paneling, ceiling design and details.
• Prepare complete and accurate working drawings using the (SAUDI ARAMCO) engineering standards. Requirements are specified and performed.
• Attend company-sponsored seminars for personal enhancement programs.

Design Draughtsman at V. V. Associate Architects, Engineers & Executors
  • India - Hyderabad
  • January 2002 to May 2003

• Responsible for all kinds of drafting related to Civil, Structural, Electrical, & Mechanical disciplines.
• Performed actual survey of project sites to obtain measurements and to check dimensions and other data such as the physical condition of execution of existing Facilities in preparation of the Mechanical and piping plans.
• Facilitate the correction of working drawings with area engineers for the drafting of facilities like structural details, architecture, water layout and drainage system.
• Prepare complete and accurate working drawings using engineering standards. Requirements are specified and performed.
• Coordination with engineers and proponents during the progress of work.

Education

Diploma, Civil Draftsmanship
  • at Indo-British Academy
  • April 2012
Diploma, Course in Computer Aided Design Drafting 2002 & Microstation
  • at Engineering CADD Center (P) Limited
  • January 2010
Diploma, Computer Application (DCA)
  • at Intel Computer Training Center
  • January 2009
Diploma, Plant design system (PDS)
  • at TR
  • March 2008

Specialties & Skills

Microsoft Word
Microsoft Access
International Standards
Prevention
AutoCad
Micro Station
Smart Plant Review
INTools
Intergraph PDS
SP3D Piping
Navis work

Languages

English
Expert
Urdu
Expert

Memberships

Saudi council of Engineering
  • Piping Designer
  • July 2017

Training and Certifications

CPR (Training)
Training Institute:
Saudi Aramco
Date Attended:
June 2004
Duration:
3 hours
MS Office enhance program (Training)
Training Institute:
Saudi Aramco
Date Attended:
August 2004
Duration:
10 hours