قصي موسى, Deployment Engineer

قصي موسى

Deployment Engineer

nahjtech

البلد
الأردن - عمان
التعليم
بكالوريوس, Communication Engineer
الخبرات
16 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 7 أشهر

Deployment Engineer في nahjtech
  • الأردن - عمان
  • أشغل هذه الوظيفة منذ ديسمبر 2013

• Installation, commissioning, and traffic configuration using Ciena 6500 product
• Testing fiber cores, troubleshooting alarms
• Drawing sites layouts
• Day to day management plan
• Weekly and monthly network reports

Sr.Transmission Network Engineer في Mada Telecommunication Company
  • الأردن - عمان
  • أغسطس 2010 إلى نوفمبر 2013

• Transmission Site Survey: check out the new or existing sites for installation of new equipment, check out the installed equipment, and specify the available positions on the tower, the tower height, and the site coordinates using the GPS.
• Line of site calculations: (using the PATHLOSS program), determine the LOS between the sites in the print profile module, the equipment needed for the link to accomplish the fade margin value, and calculate the acceptable values of the performance parameters for G.826, G828 in the worksheet module, find out the reflection, diffraction, interference calculations, create a complete transmission network in the network module, and create a comprehensive reports of the network.
• Frequency Planning (8, 13, 23, 38 GHz).
• Connectivity Planning.
• Traffic Planning for TDM and Ethernet solutions.
• Equipment Planning.
• Interference Analysis.
• Handle the reports to the project coordinator.
• Preparing periodical network quality KPI’s reports
• Traffic measurements analysis.
• Set the relevant capacity KPI of the network.
• Request for Proposal handling, determine technical specification for the microwave equipment, and determine the required solution for the network, Vendors evaluation.
• Create and Ordering Purchase Requests to logistic and finance team.
• Troubleshooting problems with BSS team and Radio team.
•Operation and maintenance for huawei OSN 3500.
•Monitoring SDH network using T2000 Network Management System.
•Calculate SDH KPI’s performance parameters: Availability, SESR, ESR, MTTR, and MTBF.
•Configure SDH and Ethernet services.
•Follow up and repair fiber cuts, temporary and permanent solution.

Transmission and Planning Systems Engineer في United Telecom Services.CO (UNITEL)
  • الأردن - عمان
  • أكتوبر 2007 إلى مارس 2010

•Transmission Site Survey
•Line of site calculations: (using the PATHLOSS program and Mini-link Performance program),
•Team leader outdoors rescue
•Team Leader in Installation and Configuration of transmission systems in charge of Ericsson Mini-Links:
•Mini-Link E, Mini-Link High Capacity, Mini-Link Traffic Node
•Responsible for installation of outdoor units and indoor units.
•Responsible for system configurations using Ericsson Software Products
-Mini-Link Service Manager MSM.
-Mini-Link High Capacity.
-Mini-Link Craft, Traffic Node.
-Mini-Link Performance.
-Path Loss program.
-Mini-Link Manager 7.1.
-AXX 9820 R6 (OMS 870).
Moreover, Antenna Alignment, System Commissioning and Acceptance
•Mini Link HC systems: MMU’s, TRU’s, using internet browser and Mini-link Network Manager Software. Moreover, Antenna Alignment, System Commissioning and Acceptance
•Mini Link Traffic Node: MMU’s, NPU’s and LTU’s using Mini-Link Craft and Network Manager Software. Moreover, Antenna Alignment, System Commissioning and Acceptance.
•Create and Adapt Mini-link Sites in Mini-link Manager 7.1.
•Testing the transmission media using E1 tester (Sunlite E1)
•Responsible for installation of OMS 870 equipment:

Marconi Optical Multi Service: Installation of: Rack, OMS 870 installation of service modules:
4×STM-4 SFP Module,
High Density 63 E1 Module-LFH,
8×E1-RJ 45 Module
32×E1-LFH-RJ 45 Panel,
8 FE-16 SMAP-RJ 45 Module
Responsible for system configurations:
- Low order configuration using hyper terminal:
- High order configuration using AXX 9820 R6
- Configuration of SDH ports and PDH ports
- Configuration of LAN ports and WAN ports
- Configuration of Ethernet LAN ports in layer one and layer two, Ethernet over SDH
•Testing the transmission media STM-4, E1, and Time slot using ANT-5 SDH/PDH Access Tester

-Responsible for Installation and Configuration of E-Band Product

Mobile maintenance engineer level 1 في Golden Mobile
  • الأردن - عمان
  • يونيو 2007 إلى أكتوبر 2007

Mobile maintenace
handle reports

الخلفية التعليمية

بكالوريوس, Communication Engineer
  • في Mu'tah University
  • فبراير 2007

•Bachelor of Engineering in Electrical / Communication, Mutah University with GPA good •Secondary Education Alryaddiah high school, Amman-Jordan

Specialties & Skills

Installation
Commissioning
Pathloss
MS Word-Excel-Power point-Visio
OMS870 Training Course in Itally

اللغات

العربية
متمرّس
الانجليزية
متوسط

العضويات

Jordan Engineer Association
  • Member
  • February 2007