Mechanical consultant engineer
LINE ENGINEERING CONSULTATIONS OFFICE
Total years of experience :13 years, 3 Months
Played a key role as a mechanical consultant engineer at two Mega Project north of Iraq (KRG), high rise building and evaluation of all the mechanical drawings along with followed with the contractor.
Efficiently checked all the work implementation for piping network according to ASME codes, managed and handled firefighting activities and appraised and audit technical specs of firefighting.
CIRCUIT RIDER PROGRAM MANAGER
Successfully managed, sustained and supervised all work activities for north and north central regions in Iraq under this project.
Evaluation and assessment of all the mechanical drawings and checked all the designs for the sites under this program
Proficiently managed, maintained & administered the construction activities for two of big projects in Iraq "Baghdad Police College & 8th Battalion at Najaf".
Successfully managed & controlled the work for Water policy project for MMPW in Iraq.
Played a key role as an auditor, successfully competed Preventive Maintenance Program for all the mechanical maintenance reports for all 11 WSIS sites in Iraq.
Established and inspected all the mechanical check list and sheets for PM program and successfully completed many training for about these sheet of this program.
Professionally worked on quality assurance and quality control, inspected all the mechanical test results for Shark Dijlah WTP (water Treatment Plant) Site and reviewed all the mechanical designs.
Functioned on warranty for all Water Sector Projects and efficaciously handled and completed additional task such as Close Out of all documentation for Kerkh WWTP.
Competently controlled the operation and maintenance books for Water Department Project and led / Senior Engineer over the closeout documentation for all of the Water Department Projects.
Led as a mechanical engineer at one of the largest treatment plan in Iraq Kerkh WWTP and the production of the plant is 280, 280 cubic meter per day, enough to supply treatment of waste water to serve 1, 800, 000 people.
Spearheaded rehabilitation of Inlet Reception Chamber, Air Blowers, and Grease Chamber and monitored all the procurements that purchased from Bechtel to the Site.
Liable for all maintenances during and after startup, and professionally sustained all the screw gearboxes and settled tanks gearboxes in train three at Kerkh WWTP.
Effectively achieved, conserved and administered settled tanks scrapers installation, and gate valves installation (included civil work also) in Kerkh WWTP Site.
Administered and inspected fixed and drifted aerators installation as per requirement and all the painting activities to get high quality of painting at Kerkh WWTP site and Rusti North WWTP.
Drove and maintained consolidation tanks at Kerkh WWTP Site that include (valves, floaters, and pipes).