Quality Control Inspector
شركة المعدات المكملة للطائرات المحدودة
مجموع سنوات الخبرة :11 years, 10 أشهر
• Inspection of works related aircraft components.
• Conducting inspection based on Technical Manual.
• Prepare the shop finding report for all components.
• Knowledge for release components and return to service.
• Authorization card for:
1. Receiving & Detail &Final Inspection.
2. Assembly inspection.
3. Scrapping Authority.
4. Bearing Inspection.
5. Hardness Testing Inspection.
6. Borescope Inspection.
7. Spring Test Inspection.
8. Inspection of component testing.
• My Qualified Components are:
1. Hydraulic F.15 Stabilator “S” and “CD”.
2. Hydraulic F.15 PC and Utility Reservoir.
3. Hydraulic F.15 First Ramp Actuator.
4. Hydraulic F.15 Diffuser Ramp Servo Cylinder.
5. Hydraulic F.15 PC Accessory Manifold.
6. Hydraulic F.15 Utility Accessory Manifold.
7. Mechanical Tornado Screw Jacks.
8. Gaseous Tornado/Hawk Fire extinguisher.
o weekly & Monthly Quality Reports preparation and submission.
o Carried out inspection of materials to make sure it meets the requirements of project specification.
o To ensure that all inspection and test records are properly documented by subcontractor.
o Check corrected punch list items.
o Responsible for the over-all implementation of Quality Assurance and Quality Control related to electrical works to accordance with SABIC Engineering Standards.
o Responsible for the preparation of Quality Assurance and Quality control Plan As per Field Quality Control Plan and Issued construction drawings and Specification.
o Verify the equipment and devices used in the project meets the required Specifications per SABIC Standard and have been tested in accordance with The Standard procedures.
o Perform and supervise the testing of all electrical devices grounding systems, Cable Insulation test and make sure it is acceptable to the proponent. And all walk downs like RFC, PSSR, and RFSU.
o Testing of motors (LV, MV), Solo Run test, Vibration test, Rotation test.
o Testing of generator (1250KVA), Vibration test, Function test, Load test.
o Monitoring control panel wiring, Termination, cable routing & cable tray Installation.
o Testing of circuit Breaker, SSOLR.
o Review construction drawings for compliance of project requirements & Specifications and monitor contractors compliance on site with the project approved construction drawing & specifications.
o Installation of complete Substation Equipment, HV/LV Transformers, LV Switchgears, and Motor control Centers, LV Panel Boards, and UPS & Battery system. LV Motors. Cable Ladder/Trays, PVC, EMT, RGS, PVC Coated RGS Conducting, MV/LV Cabling & Termination, Plant Grounding, Duct Bank, Lighting, Plant Area Lighting, Task Lighting. Switch Racks, Fire Alarm System.
o Conduct instrument installation inspection as per ITP.
o Do the cable tray installation inspection as per NEMA VE1 and NEMA
weekly & Monthly Quality Reports preparation and submission.
o Carried out inspection of materials to make sure it meets the requirements of project specification.
o To ensure that all inspection and test records are properly documented by subcontractor.
o Check corrected punch list items.
o Responsible for the over-all implementation of Quality Assurance and Quality Control related to electrical works to accordance with SABIC Engineering Standards.
o Responsible for the preparation of Quality Assurance and Quality control Plan As per Field Quality Control Plan and Issued construction drawings and Specification.
o Verify the equipment and devices used in the project meets the required Specifications per SABIC Standard and have been tested in accordance with The Standard procedures.
o Perform and supervise the testing of all electrical devices grounding systems, Cable Insulation test and make sure it is acceptable to the proponent. And all walk downs like RFC, PSSR, and RFSU.
o Testing of motors (LV, MV), Solo Run test, Vibration test, Rotation test.
o Testing of generator (1250KVA), Vibration test, Function test, Load test.
o Monitoring control panel wiring, Termination, cable routing & cable tray Installation.
o Testing of circuit Breaker, SSOLR.
o Review construction drawings for compliance of project requirements & Specifications and monitor contractors compliance on site with the project approved construction drawing & specifications.
o Installation of complete Substation Equipment, HV/LV Transformers, LV Switchgears, and Motor control Centers, LV Panel Boards, and UPS & Battery system. LV Motors. Cable Ladder/Trays, PVC, EMT, RGS, PVC Coated RGS Conducting, MV/LV Cabling & Termination, Plant Grounding, Duct Bank, Lighting, Plant Area Lighting, Task Lighting. Switch Racks, Fire Alarm System.
o Conduct instrument installation inspection as per ITP.
o Do the cable tray installation inspection as per NEMA VE1 and NEMA
install all electrical panels & motors
cable laying
install all switches, plugs and light fixture
testing all electrical equipments
Electrical technology