Manager Electrical
Larsen & Toubro - United Arab Emirates
مجموع سنوات الخبرة :19 years, 5 أشهر
Abu dhabi Airport - Midfiled Terminal Construction Airside 22/ 0.415 KV substation, Speical Airport Systems ( AGL, GPU, VDGS, HML), Tunnel ELV system installation testing and commissioning, site planning, claim management, stakeholder management, Deaign coordination, Work Permit for Airside works, Safety and Quality compliance, Team management
Key Task and Responsibilities
•Responsible for erection and commissioning of 6.6 KV switchgear panels, battery charger and associated cabling works in Bhilai Steel plant-power plant division India.
•Responsible for client certification for completed works.
•Site Management.
•Contractual correspondence with client.
•Handing over of completed works to client and preparation of handing over documentation.
2. 400 KV/765 KV Sub-station at Bina, Power Grid. (From Sept’11 to Dec’11)
Key Tasks & Responsibilities in execution at DIAL Project
•Responsible for testing & commissioning of Airfield ground lighting and 4 Nos of 2MVA, 11/0.440KV AGL substation in IGI Airport DIAL project.
•Managing, Monitoring & Controlling of the project for completing it on time by ensuring quality within acceptable cost
•Identifying, establishing, reconciling and advising the
Grip Engineers Pvt Ltd is an ISO Certified company and is a prestigious name in the field of material handling equipments.
Key Tasks & Responsibilities:
•Responsible for Equipment sizing calculation-involving Transformers, Switchgears, Control & Protection equipments, Shrouded Bus Bar, AC Variable Frequency Drives, Cables.
•Handling the design for LV Control panel Circuit to operate the cranes safely in all motion & protect motors in case of an electrical fault in the electrical network.
•Preparing Cable Schedules, Lighting, Earthing & Cable layout.
•Selecting Induction motors for crane application.
•Testing & Maintenance of Crane Electrical Equipment’s function before & after installation of Cranes.
1. Delhi International Airport T3 Constructions Project 2. 765KV Switchyard Bina india 3. SAIL Projects for 6.6.KV Switchgear ETC 4. Abu Dhabi Airport -Mid field Terminal Construction Project Activities Handled : Terminal building Electrification, Airport systems like AGL,VDGS,GPU, Apron High Mast Lighting ,Jet fuel, Planning, Work order management , client meeting , Progress reporting , Milestone Certification , Client Inspections , Works certification , Management approval for ACE (Accepted Cost Estimate), Variation claim negotiation with client and finalization , Design coordination , Interface control documents, system commissioning, Project closeout and handing over documentation like O&M manuals , As built , Spares , Training .