راجيف بوبو, Civil Engineer

راجيف بوبو

Civil Engineer

Abu Dhabi Company for Onshore Oil Operations

البلد
الإمارات العربية المتحدة - أبو ظبي
التعليم
الثانوية العامة أو ما يعادلها, year
الخبرات
5 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :5 years, 11 أشهر

Civil Engineer في Abu Dhabi Company for Onshore Oil Operations
  • الإمارات العربية المتحدة
  • مارس 2013 إلى فبراير 2014

➢ WORK EXPERIENCE:-

1. Organization: Punj Lloyd Ltd.
Project: EPC for Tie In works of Sahil Asab & Shah Oil & Gas Areas Field Development (ADCO) Abu Dhabi
(UAE)
Client: Abu Dhabi Company for Onshore Oil Operations (ADCO)
Designation: Civil Engineer
Period: From Mar 2013 to Till Date
Job Profile Civil Structural Work for Wellhead Compound & IsolationValvesCompound, Earth Work piping work &Pipe Supports, solar painal precast foundation installation & water proofing / Pipe Lines and Facilities, trenching, finishing and barm making as per drawing civil all activity Etc.

2. Organization: Punj Lloyd Ltd.
Project: epc of new water treatment plant and central
Processing Facilities upgrade For Oil /Gas Field

Civil Engineer في Mukhaizna Muscat (Oman)
  • أبريل 2011 إلى مارس 2013

Mukhaizna Muscat (Oman)
Client: ( OXY) Occidental Mukhaizna LLC.
Designation: Civil Engineer
Period: From Apr 2011 to Mar 2013
Job Profile Civil Structural Work, Under ground Utilities and Facilities, earth work, Bar binding schedule as per drawing shape code, concreting work, shuttering work, Tank Foundations and around making a dike wall, Pump Stations and foundation. pipe reak foundation. Pipe support, pawing slab, leveling &grading work. cable trench, Piping &pipe line Works finishing and water proofing etc.

A.E (Assistant Engineer) في Punj Lloyd Ltd
  • الهند
  • مايو 2009 إلى مايو 2010
J.E. (Junior Engineer) في Vedanta Alluminium Ltd
  • الهند
  • يونيو 2007 إلى مايو 2009

Project: Vedanta Alluminium Ltd. Smelter-II Project,
Jharsuguda (Orissa)
Client: Vedanta Alluminium Ltd.
Designation: J.E. (Junior Engineer)
Period: From Jun 2007 to may 2009
Job Profile: SEMELTER &POWER PLANT PROJECT
Pot room foundation and super structure; 6.6kv
building Foundation, preparation of Bar binding schedule as per drawing shape code, concreting work masonry for brick, plastering work & finishing work
Contractors & Subcontractor bill. Rectifier transformer foundation


➢ PROFFESSIONAL QULIFICATION:-

Completed my diploma in CIVIL ENGG. From Govt.K.L Polytechnic Roorkee, under Board of Technical Education Uttarakhanda, with aggregate percentage of 59.81% in the year 2007.

Administrative Buildings في Underground Utilities and Facilities
  • إلى

-

Total Experience of 7+ years in different organization construction project.

➢ WORK EXPERIENCE:-

1. Organization: Punj Lloyd Ltd.

Civil Engineer في Gannon Dunkerley & co. Ltd
  • الإمارات العربية المتحدة
  • إلى

Project: EPC for Tie In works of Sahil Asab & Shah Oil & Gas Areas Field Development (ADCO) Abu Dhabi
(UAE)
Client: Abu Dhabi Company for Onshore Oil Operations (ADCO)
Designation: Civil Engineer
Period: From Mar 2013 to Till Date
Job Profile Civil Structural Work for Wellhead Compound & IsolationValvesCompound, Earth Work piping work &Pipe Supports, solar painal precast foundation installation & water proofing / Pipe Lines and Facilities, trenching, finishing and barm making as per drawing civil all activity Etc.

2. Organization: Punj Lloyd Ltd.
Project: epc of new water treatment plant and central
Processing Facilities upgrade For Oil /Gas Field
Mukhaizna Muscat (Oman)
Client: ( OXY) Occidental Mukhaizna LLC.
Designation: Civil Engineer
Period: From Apr 2011 to Mar 2013
Job Profile Civil Structural Work, Under ground Utilities and Facilities, earth work, Bar binding schedule as per drawing shape code, concreting work, shuttering work, Tank Foundations and around making a dike wall, Pump Stations and foundation. pipe reak foundation. Pipe support, pawing slab, leveling &grading work. cable trench, Piping &pipe line Works finishing and water proofing etc.
3. Organization: Punj Lloyd Ltd
Project: New Doha International Airport, Doha, Qatar
Client: Overseas Bechtel Incorporation
Designation: A.E (Assistant Engineer)
Period: From May2009 to may2010
Job Profile Underground Utilities and Facilities, earth work bar binding schedule as per drawing shape code, shuttering work, concreting works Tank Foundations, Administrative Buildings, Pump Stations, and Generator Room. Pipe support, cable tranche, valve pit, cable duct laying, valve chamber, road galli and sokway leaner sokway and Works finishing and water proofing etc.
4. Organization: Gannon Dunkerley & co. Ltd.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, year
  • في M.S.D Inter College Dewaria
  • يناير 2003

Completed HS from M.S.D Inter College Dewaria from U.P Board with aggregate percentage of 52.65% in the year 2003.

Specialties & Skills

AUTO BODY
CIVIL ENGINEER
CIVIL STRUCTURAL
DRAWING
EARTH WORK
ENGINEER
FINISHING
MASONRY
PUMP STATIONS

اللغات

الهندية
مبتدئ
الانجليزية
مبتدئ