Sr. Draughtsman
M/s China State Construction Engr. Corp. – Middle East, Dubai, U.A.E
Total des années d'expérience :21 years, 4 Mois
Preparation for NOC Drawings for all Service, Profile and Alignment for Rail Track, Profile for Access Roads with grading plan, M.S Wall Works, Milling Works for Road, Utilities Works, sign board, Pipe line works, 11kv Electrical cable works, street Lighting works, sewerage works, road pavement works, Kerb stone works, and interlocking tile work with other misc. works, Traffic Management Plan for Road Diversion, Fence Works, As-Built Submission for Road and Bridges Using GIS Software & Road Cross section for quantity Calculation using Latest software like Civil3D, Micro station.
R881-3C2
Comprehensive
Improvements of the
Parallel Roads - Phase
C2
Sr.
R1041 - Dubai Parks
Access from Sheikh
R1041- Dubai ParksAccessfrom Sheikh Zayed Road: Preparationfor NOCDwg, Profile for InternalRoadswithgrading plan, M.S.E Wall
Works, milling works, road marking, Utilities Works, sign board, Pipe line works, 11kvElectricalcableworks, streetLightingworks, sewerage
works, roadpavementworks, Kerbstoneworks, andinterlockingtileworkwithothermisc.works, safetyplan fordiversionofroad, fenceworks
& Road Cross section for quantity using Latest software like civil3D, Micro station (
Maintenance of Abu Dhabi
Al Ain Highway To (E22) &
Truck Road (E30/E40)
Infrastructure Project in
International City Phase 2
& 3 -Stage 1
International City Phase 2 & 3
Maintenance of
infrastructure facilities for
sila & surrounding Area.
AREAS OF EXPERTISE
Design & Layout
Approvals
Engineering
Support &
Relationship
Management Civil
& Drafting and
Detail Engineering Detailing Team
Management
Si
Improvement, Upgrading, Development & Maintenance of infrastructurefacilities for Al sila & surrounding Area, infrastructure with
maintenance of entire sila area with internal road,
Jumeirah Village South-III (Circle), infrastructure project is around 50 km of internal road, 50 Km of Principle Road. Services utilities like
Potable water works, District Cooling lines, 11kv Electrical works, street Lighting works, sewerage works, road pavement works (road
marking, Kerbstoneworks, andinterlockingtilework withothermisc. works. (Consultant- M/SMouchelPark, Client- M/sNakheel)
Jumeirah Village South
Circle. Infrastructure project
Six Laning of NH-7 Hyderabad -
Bangalore 2008 Section. (25
km)
Worked for varies Building projects
for Villas & 3 Storey Building
Preparation of Plan, Section, working dwg for site, 3D views of building, villas, renovation of old building, interior Designingandmisc.works
Preparation of cross section & longitudinal section of bund, canal, road for infrastructure development and convertingthe surveydata using
the land development & auto civil software for preparation of layout drawing for client
Preparationofsite layoutaspersurveyorreport&locatethetower, shelter&DGSettogivensiteareawith checklist for the given site address
and site visit to take actual location of tower shelter & Dg set after completion of civil works and Preparationof final drawingfor each site as
per surveyorreport forimplementationofelectricalworks, EquipmentRoom&Towernetworks.(Consultant- M/sErricson).
M/s Desert Line Projects L.L.C in Sultanate of Oman. Cad Draftsman for Road Project from Harad to Sa’ada Road (200 Km Project)
& Al Mahweet to Al Qanawas (110Km Project
Worked for GSM Project like Foundation
for Towers & Tower Erection, Genset
Location & Equipment Room
8
M/s Desert Line Projects L.L.C.
in Sultanate of Oman
Draftsman
Preparation of road design as per the survey detail given by surveyor and get the approval for execution in site, shop drawing for pipe, box
culvert&protectionworks, gettingapprovalfromconsultantandfinalasbuiltdrawingtobesubmittedtoclient.(
Harad to Sa’ada Road (200 Km project)
& Al Mahweet to Al Qanawas (110Km
project) in Republicof Yemen
Birkat Al Mouz to Sayq (18 Km) Network
Expansion projects
Preparation of cross section for whole project, shop drawing for pipe, box culvert & protection works to get approval from consultant for
execution in site and final as built drawing to submitted to client. (
Digitalizing the manual Drawing
for Telecommunication, (Contract
No.97107)
Preparation of primary, secondary Schematic, Conduit drawing as per site condition & details of ducts, concrete works & preparation of
final as built drawing and approval of the same from the client, (using latest Autocad Software) - (Consultant - M/s Erricson)
PROVEN JOBROLE
AS
3Ds Max Ver - 20 (3d Modeling in Architecture Building, Character Modeling, Animation