RAJESH T K KUMARESAN, Senior Engineer- Electrical

RAJESH T K KUMARESAN

Senior Engineer- Electrical

Mott MacDonald

البلد
الإمارات العربية المتحدة
التعليم
بكالوريوس, Engineering
الخبرات
16 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 0 أشهر

Senior Engineer- Electrical في Mott MacDonald
  • الهند
  • أشغل هذه الوظيفة منذ سبتمبر 2014

• Accountable for the efficient delivery of the project within schedule, cost, and quality standards.
• Lead the evaluation for pre-qualifications reports submitted by Vendors for Various MEP packages.
• Prepare the Tender plan.
• Lead technical evaluation of EPC bids & Lead development Bid Check Estimate.
• Co-ordinate with architects / consultants to finalize layouts and statutory drawings.
• Review of service drawings, tender & BOQ and provide information to design consultants on short falls or value engineering.
• Review and ensure availability of correct, consistent and comprehensive drawings and specification with the contractor.
• Monitor the delivery and work quality of contractor. Drive efficiency, review periodically, escalate issues and ensure corrective actions.
• Responsible for day to day site work of engineering as per plan.
• Review and approve the measurement sheets & payments.
• Ensure implementation of construction QA/ QC processes.
• Assist in quality & safety audits at sites.
• Monitor/review the project schedules and the budget for all MEP activities.
• Preparation of techno-commercial bid and vendor competency score card.
• Attending techno-commercial negotiation meeting with Vendors.
• Attend technical coordination & progress meetings to discuss the contractor’s submissions, shop drawings, material submittal documents and design related issues.
• Review the contractor’s inspection test plan and review all QA/QC documents.

Electrical Engineer في Nabs Integrated Technical Services
  • أشغل هذه الوظيفة منذ أبريل 2016

• Responsible for MEP works in the data center.
• Design, implement and lifecycle manage data center power and cooling infrastructure.
• Involved in site surveys and solution designing for the MEP works in the data center.
• Lead data center engineering projects.
• Develop project documentation and provide advice as a technical authority.
• Preparing detail reports on the design of data center.
• Provide technical advice on managing problems within M&E for the data centre.
• Carry out testing and commissioning activities as per project requirements & specifications.
• Co-ordinate with architects/consultants to finalize layout.
• Responsible for structured cabling works.
• Monitor/review the project schedules and the budget for all MEP activities for the data center.
• Ensure that activities are within budgeted costs.

Senior Project Engineer في AECOM
  • الهند
  • سبتمبر 2012 إلى سبتمبر 2014

• Manage MEP issues and ensure adherence to all policies, procedures and standards using specified drawings, within budget and on program.
• Reviewing and approving the contractor’s method statement and technical submittals for the execution of work.
• Carry out final inspection for certification of final completion and handing over of the works.
• Attend technical coordination meetings to discuss the contractor’s submissions, shop drawings, material submittal documents and design related issues.
• Inspect the work done by the contractor to ascertain that work is executed in accordance with contract document and accepted practice.
• Review the contractor’s inspection test plan and review all QA/QC documents.
• Witness all test carried by the contractor on site and off site.
• Conduct regular site visit and verify the installations of the MEP works, ensuring compliance with the contract documents and design drawings.

Senior Engineer في Sobha Developers ltd.
  • الهند - بنغالورو
  • أبريل 2011 إلى سبتمبر 2012

• Designing of HV and LV distribution for various Commercial Complexes, Residential, and High Rise Buildings.
• Designing 11KV and 400V electrical systems, lighting design, fire detection and alarm, BMS systems, PA systems, access control and CCTV.
• Designing of Substation Layout, Transformers yards, Transformer & DG sizing, Panel & DG room sizing etc., complete with necessary protection.
• Designing of lighting and power distribution system complete with necessary protection for classified areas.
• Cable engineering for HV and LV cables Voltage drop calculation, Designing of Cable tray Sizing, Routing of Cable Trays, Raceways and Trunking layouts.
• Designing of Earthing system, sizing of earthing conductors, calculations for earth pits, etc.
• Preparing Working drawing, Scheme drawing & Co-ordination Drawings for the Project sites.
• Experienced in Site Quality checking as part of QA team.
• Electrical calculation with Load & Design parameters.
• Designing the Lighting calculations with DiaLux for commercial and high rise buildings.
• Attending the Site meeting & Regular Site visits to get the complete idea of the project.
• Co-ordinating & Follow up with Architects and (Plumbing, HVAC & Fire) MEP in case of any technical issues clarification.
• Preparing detail report on selection of transformer, DG and cables.
• Efficiently handling a team of 4 draughtsmen.

Project Engineer في Sumanam Engineering Services Ltd
  • الهند
  • يونيو 2008 إلى أبريل 2011

• Designing Electrical project works of high rise & commercial buildings (11KV and 400V).
• Preparing working drawing, Scheme drawing for the Projects.
• Preparing estimation, boq and tender documents for different projects.
• Preparing Electrical calculations with load and design parameters.
• Designing of Substation Layout, Transformers yards, Transformer & DG sizing, Panel & DG room sizing etc., complete with necessary protection.
• Cable engineering for HV and LV cables Voltage drop calculation, Designing of Cable tray Sizing, Routing of Cable Trays, Raceways and Trunking layouts.
• Designing of lightning arrestor and earthing network.
• Drawings preparing for the approval from chief electrical inspector, Kerala.
• Making specifications for the equipments to be used by the contractor.
• Negotiating, finalizing & fixing of the contractor (with labour / materials).
• Co-ordinating with client and architect for design development.
• Review of vendor drawings and specifications.
• Quality assurance (QA)-Inspecting quality along course of work.

الخلفية التعليمية

بكالوريوس, Engineering
  • في Cochin University of Science and Technology
  • يناير 2008

B.Tech at Cochin University of Science and Technology School of Engineering, Thrikakkara 2004 - 2008

الثانوية العامة أو ما يعادلها, Public
  • في Sacred Hearts Higher Secondary School
  • يناير 2004

H.S.E. at Board of Public Examination, Kerala Sacred Hearts Higher Secondary School, Thevara

الثانوية العامة أو ما يعادلها, Public
  • في Sri Cochin gujarathi vidyalaya
  • يناير 2002

S.S.L.C. Board of Public Examination, Kerala Sri Cochin Gujarathi Vidyalaya, Mattanchery 2002

Specialties & Skills

Electrical Engineering
Budilding Design
Auto Cad
MS office

اللغات

الهندية
متمرّس
الملايام
اللغة الأم
الانجليزية
متمرّس

العضويات

Membership in Institute of Engineering Technology
  • MIET
  • October 2015

الهوايات

  • Playing Football
    Was captain in University team