ASAB Full field development Project في Petrofac International
  • الإمارات العربية المتحدة
  • يونيو 2012 إلى أغسطس 2013

Petrofac International, Abu Dhabi
Through Osmak Engineering from 16.06.2012 to 08.01.2013)
Client ADCO
Project Name: ASAB Full field development Project.
Position Piping Engineer

Nature of job: ❖ Manages test pack documentation flow from Contractor to client for review and approval and back to Contractor for execution.
❖ Tracks, monitors, and statuses progress of piping test packs.
❖ Assists with review of piping test packs as time permits.
❖ Manages test pack documentation flow from Contractor to client for all 3 Fabrication groups
❖ Creates test pack database to record all test packs from Contractor.
❖ Follows test pack documentation flow from multiple internal parties for review and ensures timely review and return to Contractor.
❖ Tracks, monitors and statuses progress of piping test packs for all 3 fabrication groups
Registers pipe test pack document status in database.
❖ Tracks and reports progress to test pack completion to Project Controls department for weekly reporting input.
❖ Supplements Piping Test Pack Engineers with review of test packs as time permits
Safety is paramount and will not be compromised.
❖ Training in the company Incident and Injury Free Safety Process will be provided

❖ Line walk as per P&ID and generation of punch list.
❖ Correction of valve direction as per line flow.
❖ Replacement of gasket and bolts as per drawing
❖ Water flushing of underground lines.
❖ Air blowing and blasting of lines.
❖ Commissioning of Fire fighting, Wash Water, Potable water system.
❖ Commissioning and operation of Air Compressor and Nitrogen package and chemical injection system.
❖ Lube oil flushing.
❖ Re instatement of lines after blowing and blasting.
❖ Leak test of lines and Nitrogen purging (Filing)
❖ Chemical handling, loading in vessel.
❖ To ensure that the work permit for entire job is available and job is being carried out as per procedure.
❖ Subcontractor coordination with regards to their daily activities: mechanical completion, commissioning and start up.
❖ Attend the hydro tests performed on site, test packages mechanical check and advise the technical punches before reinstatement.
❖ Monitor Equipment/Materials availability at the Warehouse
❖ Attend meetings and advise Subcontractor the priorities to be taken into consideration.
Monitor work progress in accordance with their submitted work schedule
Attend the production meetings
❖ Keep daily activity progress record and log any problems that may exist for immediate action
❖ Ensure safety practices on site, report in routine observation reports cases of good or bad practices which might affect the safety on site.
❖ Inform Group leader about any technical problems that may arise at site to avoid delaying of working schedule.

Piping Engineer في Petrofac International
  • الإمارات العربية المتحدة
  • يونيو 2012 إلى يناير 2013

 Manages test pack documentation flow from Contractor to client for review and approval and back to Contractor for execution.
 Tracks, monitors, and statuses progress of piping test packs.
 Assists with review of piping test packs as time permits.
 Manages test pack documentation flow from Contractor to client for all 3 Fabrication groups
 Creates test pack database to record all test packs from Contractor.
 Follows test pack documentation flow from multiple internal parties for review and ensures timely review and return to Contractor.
 Tracks, monitors and statuses progress of piping test packs for all 3 fabrication groups
Registers pipe test pack document status in database.
 Tracks and reports progress to test pack completion to Project Controls department for weekly reporting input.
 Supplements Piping Test Pack Engineers with review of test packs as time permits
Safety is paramount and will not be compromised.
 Training in the company Incident and Injury Free Safety Process will be provided

 Line walk as per P&ID and generation of punch list.
 Correction of valve direction as per line flow.
 Replacement of gasket and bolts as per drawing
 Water flushing of underground lines.
 Air blowing and blasting of lines.
 Commissioning of Fire fighting, Wash Water, Potable water system.
 Commissioning and operation of Air Compressor and Nitrogen package and chemical injection system.
 Lube oil flushing.
 Re instatement of lines after blowing and blasting.
 Leak test of lines and Nitrogen purging (Filing).
 Chemical handling, loading in vessel.
 To ensure that the work permit for entire job is available and job is being carried out as per procedure.
 Subcontractor coordination with regards to their daily activities: mechanical completion, commissioning and start up.
 Attend the hydro tests performed on site, test packages mechanical check and advise the technical punches before reinstatement.

في Cairn Energy Jamnagar
  • الهند
  • سبتمبر 2010 إلى يونيو 2012

5 Cairn Energy Jamnagar 06.09.2010 15.06.2012

Position Field Engineer في Cairn Energy Pty. Limited
  • الهند
  • سبتمبر 2010 إلى يونيو 2012

Cairn Energy Pty. Limited Jamnagar
Through Brunel Energy From 06.09.2010 to 15.06.2012)
Project: Construction of Crude Oil / Flush oil storage tanks and associated facility.

Position Field Engineer
Current professional experience is as follows:-
Management of installation, testing of total underground & above ground Piping network which includes Crude lines, Flush oil lines, Fire Water System, Hazardous and Non-Hazardous Open Drain and Closed drain system.

➢ The responsibilities include but not limited to be Engineering, Installation, testing and commissioning.
➢ Carry out inspection, site survey and dimensional check to ensure piping installation are as design drawing and specifications and comply with project.
➢ Confirm that work complies with quality, safety, health and environment requirements.
➢ Supervision of fabrication and installation of piping spools work.

➢ Coordinate inspections with consultant and authorities as required by the contract.
➢ Ensure construction work complies with all engineering standards, codes, specifications and design instructions.
➢ Resolve contractor raised queries in conjunction with technical support group.
➢ Overseeing the installation of all the mechanical equipment' including organization and monitoring of vendor representative at site
➢ Ensuring that the contractor generates the required as built drawings as required by the project procedure.
➢ Compliance of punch list in conjunction with the contractor.
➢ Coordinate piping fabrication activities for shut down activities.
➢ Coordinate piping spools pressure tests.
➢ Submit the work permit in a daily safety meeting.
➢ Coordinate piping installation according to the refurbishment schedule
➢ Check the piping NDT status as per needs.
➢ Check the piping painting and insulation status as per schedule

في Punj Lloyd Qatar
  • فبراير 2009 إلى أغسطس 2010

4 Punj Lloyd Qatar 13.02.2009 12.08.2010

Position Field Engineer Piping/Pipeline في PUNJ LLOYD LTD
  • الهند
  • فبراير 2009 إلى أغسطس 2010

PUNJ LLOYD LTD, QATAR
From 13.02.2009 12.08.2010
Project: laying of 36" X 211 Km pipeline and development of station v and station s
Position Field Engineer Piping/Pipeline
Major Job Done


➢ Coordinate subcontractor's piping fabrication activities
➢ Coordinate piping installation activities inside the Rig according to the planning schedule
Coordinate the piping fabrication activities in QGM workshop
➢ Coordinate the Systems Flushing, Test and Turn over to the client according approved procedures
➢ Keep an evidence of the progress and report to the manager.
➢ Submit the work to the supervisors.
➢ Attend the production meetings
➢ To ensure that before starting of activity permit for the said job is taken.
➢ Raised the FCN and FCR
➢ Painting Clearance
➢ Review of PFD's and P&Id's drawings.
➢ Preparation of Study piping.
➢ Line placing and inter-distances on rack / sleeper.
➢ Preparation & checking of Isometrics
➢ Preparation of Equipment layout & line routing
➢ Monitor all quality related activities on the project
➢ Prepare weekly quality report for client / contractor meeting.

في DODSAL LIMITED
  • الهند
  • فبراير 2002 إلى فبراير 2009

3 DODSAL LIMITED MUMBAI 15.02.2002 13.02.2009

Position Senior Piping في Dodsal limited
  • الهند
  • فبراير 2002 إلى فبراير 2009

Dodsal limited Mumbai
From: - 15.02.2002 to 13.02.2009
Project: ONGC Ethane Propane recovery. (Client Oil and Natural Gas)
Laying of Natural Gas pipeline 24" X 154 Km (Client Gas Authority of India)
Laying of Natural Gas pipeline 18" X 54 Km (Client Gas Authority of India)
Durgapur Steel Plant Modernization

Position Senior Piping/ Pipeline Engineer
➢ Monitoring and supervisions of following activities.
➢ ROW (Right of way)
➢ Stringing
➢ Trenching
➢ Welding
➢ Lowering
➢ Hydro test
➢ Back filling, Marker Installation, CP Installation, Restoration and miscellaneous activities.
➢ Preparation of Study piping.
➢ Preparation of Piping Material Specification
➢ Line placing and inter-distances on rack / sleeper.
➢ Preparation & checking of Isometrics
➢ Pre - Commissioning work i.e. Air blowing, reinstatement of spools.
➢ Nitrogen purging of system.
➢ Preparation of test pack
➢ Punch list work.
➢ Inspection of piping fabrication & installation, punch listing, hydro test inspection -
➢ Monitoring and supervisions of following activities.
➢ Installation of B31.3 process and B31.8 above ground carbon and stainless steel high pressure piping in Gas Terminal for ONGC C2-C3 Recovery project.
➢ Worked in the capacity of Sr. Engineer piping on the owner side monitoring, inspection, testing the piping/equipment installation for quality as per project specification, codes, standards and safety aspects. Reporting progress to the construction manager.
➢ Distributed and controlled the tasks for the engineers and piping supervisors.
Monitored piping materials take off, pre-fabrication and piping erection activities.
Evaluated and approved the construction of a new petrochemical plant.
Coordinated with client engineers on pipeline engineering issues.
➢ Involved in pre commissioning of process piping, utility piping, fire system piping

في Dolphin off Shore Mumbai
  • الهند
  • فبراير 1997 إلى فبراير 2002

2 Dolphin off Shore Mumbai 15.02.1997 13.02.2002

Position Engineer Piping في Client Oil and Natural Gas Corporation Ltd
  • الهند
  • فبراير 1997 إلى فبراير 2002

Dolphin offshore Mumbai
From 15.02.1997 to 13.02.2002
Client Oil and Natural Gas Corporation Ltd.

Position Engineer Piping
➢ Over -see onshore/offshore fabrication of spooling /installation/ testing / Hand over.
➢ Coordinate to resolve engineering / shipping/ materials/ issues etc.
➢ Prepare and issue of Site instructions & job cards for offshore.
➢ Control local supervisors and labour during fabrication and installation of B31.3 stainless steel process piping. Duties also included hydro testing, SLT testing and pre-commissioning.
➢ Follow-up on/Monitor on Spool Fabrication & Installation
➢ Follow-up on/Monitor on Pipe Support Installation
➢ Technical Support for Piping Foreman / Supervisor
➢ Ensure that safety & hazard requirement is being implemented on site.
➢ Ensure that Pipe supports are installed in accordance with the Isometric drawing.
➢ Prepare Mechanical Completion documents and does Pipe line check
follow up on hand over documentation.

Career Profile - A Piping/Mechanical Engineer في CHAMBAL FERTILISERS & CHEMICALS LIMITED
  • الهند
  • أكتوبر 1992 إلى فبراير 1997

1 CHAMBAL FERTILISERS & CHEMICALS LIMITED. GADEPAN, KOTA 12.10.1992 13.02.1997


Career Profile - A Piping/Mechanical Engineer with 18 yrs experience in the refinery, petrochemical & construction industries in India and Middle East Offshore & Onshore Project.Proven leadership skills involving managing, developing and motivating team to achieve their objectives. First-class analytical, design and problem solving skills. Good team
player and able to use own initiative to achieve company objectives.
excellent computer skills. Dedicated to maintain high quality standards.
Fully conversant in all aspects of discipline at managerial and safety level,

SUMMARY OF PROFFESSIONAL EXPERIENCE
Available for job Immediate

Position Supervisor Piping في CHAMBAL FERTILIZER & CHEMICAL LTD
  • أكتوبر 1992 إلى فبراير 1997

CHAMBAL FERTILIZER & CHEMICAL LTD.
Project: Construction of Ammonia & Urea Plant
From12.10.1992 to 13.02.1997
Position Supervisor Piping
Posted at their project site and assigned as Engineer in charge of Ammonia, Urea Plant and Utilities and Boiler area. Where my main responsibilities were as follows:-
➢ Coordinate subcontractor's activities
➢ Record Engineering Department's solutions: Site Disposition and Nonconformance Report.
➢ Observe and resolve Safety problems.
➢ Report specific activities in daily and weekly reports.
➢ Estimate quantities of piping which have to be installed.
➢ Interface with other departments: Engineering, QS, Civil Construction, El C&I Construction, Support Services Construction.
➢ Record equipment installation (pumps, compressors, heaters, and tanks)
➢ Management and Supervision of fabrication and erection of steam, hydrocarbon and ➢ Utilities piping, pipe supports and valves.
➢ Follow up of materials such as pipes, piping spools, pipe fittings and field material with ➢ Engineering and material deptt.
➢ Interaction with EPC Engineering deptt regarding any technical problem encountered at Site or in drawing.
➢ Generating technical queries along with the proposal for the engineering problems.

الخلفية التعليمية

بكالوريوس, Industrial
  • يناير 2006

2. Diploma In Industrial Safety 2006 National institute of labour education and Management Chennai

دبلوم, Project Management
  • في Rajasthan Techanical Board, Jodhpur
  • يوليو 1997

Diploma in Mechnical Engineering - 1997. Diploma In Project Management 2007 National institute of labour education and Management Chennai

بكالوريوس, Mechanical Engineering
  • في Rajasthan Tech. Board
  • يناير 1997

S.No. EXAMINATION PASSED Year of passing University/ collage/ Board 1. Diploma In Mechanical Engineering 1997 Rajasthan Tech. Board, JODHPUR

Specialties & Skills

Preparation
Installation
Commissioning
DRAWING
ENGINEER
FABRICATION
PETROCHEMICAL
PROCESS PIPING
REFINERY
STAINLESS STEEL
TESTING
TIG WELDING

اللغات

الهندية
مبتدئ
الانجليزية
مبتدئ