Rajmohon Rajkumar سينغ, MEP Manager

Rajmohon Rajkumar سينغ

MEP Manager

Classical Palace

البلد
قطر - الدوحة
التعليم
ماجستير, Energy and Resource Policy
الخبرات
26 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :26 years, 4 أشهر

MEP Manager في Classical Palace
  • قطر - الدوحة
  • ديسمبر 2016 إلى سبتمبر 2017

December 2016 to Till Date Classical Palace,
Doha, Qatar.
MEP Manager, Directly Reporting to MD

 Review project documents (specs and manuals), MEP systems design in relation to ID fit out job for technical feasibility and provide feedback to project team and client regarding construct ability issues,
value engineering, filling the gaps for scope of works.

 Generation of MEP drawings review report / comments that indicate construct ability issues, value engineering, incomplete scope of work and dimensional problems to ensure timely correction and early detection of any potential issues.

 Provide advice and insight into estimating budgets ensuring all MEP components are included and price estimates are accurate and realistic to the estimation team quoting new jobs.

 Perform timely site inspections and quality tests, suggest improvements, and immediately inform construction team of problems in order to correct/repair site deficiencies without impacting cost/schedule and ensure MEP systems are operating as intended prior to occupancy by Owner/Client.

 Coordinate directly with MEP sub-contractors for successful completion of project fulfilling project requirements and scheduling of functional performance testing of equipment and systems. (integrating testing procedure into the project schedule).

 Liaise with the consultant for Approval of DC1 & DC2 new and changes in the existing project for local authorities ( Municipality/Kahramaa/QCDD/ASGHAL etc.) and also getting approval from local authority for completed projects.

 Looking after the Company MEP maintenance team of about 22 Nos, engineers, supervisors and technicians for the maintenance of Hotel & resorts, Marble factory, Furniture Factory, Ware Houses ( 2 Nos.) Staffs Accommodation ( 10 Nos) and Labour Camps ( 8 Nos.) owned by Classical Palace.

MEP Design Manager في ETA Star Engineering & Contracting WLL
  • قطر - الدوحة
  • أغسطس 2011 إلى نوفمبر 2016

August 2011 to December 2016
ETA Star Electrical and Mechanical Contracting WLL
Post Box-23773, Qatar Doha
MEP Design Manager
Job Profile:

 Ensure management of the MEP design process in accordance with company policy, procedures and the Design Management Plan

 Develop the MEP Project design brief (concept) and maintain by regular review, update and sign-off with the Client.

 Ensure that the Project is adequately resourced to meet all performance criteria. Advise on company Design Management resource requirements in organising and assisting in their selection.

 Manage the MEP design including all inputs, coordination and deliverable to achieve the time, cost, and quality objectives.

 Achieve progressive approval from relevant authorities at appropriate stages including close liaison with the appropriate consultant.

 Set-up, monitor & manage the design program including integration with the Project construction and Procurement main program.

 Support the Contract Manager (D&C) to ensure that the design intent and design performance criteria are maintained through the design development and construction process.

 Ensure a traceable record is maintained of all key design decisions including justification and approvals.

 Identify and promptly initiate corrective actions necessary to ensure that the Project objectives will be met.

 Ensure compliance of Local & International design codes in MEP design work - NFPA, ASHRAE, IPC, KAHRAMAA, BS, EN, IEC, ASGHAL, QCDD & QCS.

MEP Manger في Lunar Electro,
  • الإمارات العربية المتحدة - دبي
  • مارس 2006 إلى يوليو 2011

March 2006 to July 2011

Lunar Electro, Dubai, U.A.E
MEP Division of Al Ahmadiah Cont. & Trad. Co. MEP Manager

Job Profile:

 Generation of MEP drawings review report / comments that indicate construct ability issues, value engineering, incomplete scope of work and dimensional problems to ensure timely correction and early detection of any potential issues.

 Provide advice and insight into estimating budgets ensuring all MEP components are included and price estimates are accurate and realistic.

 Review project documents to become familiar with MEP and overall requirements, review project documents (specs and manuals), MEP systems and designs for technical feasibility and provide feedback to project team and client regarding construct ability issues, value engineering, filling the gap in scope of work.

 Perform timely site inspections and quality tests, suggest improvements, and immediately inform construction team of problems in order to correct/repair site deficiencies without impacting cost/schedule and ensure MEP systems are operating as intended prior to occupancy by Owner/Client.

 Coordinate directly with MEP sub-contractors for successful completion of project requirements and scheduling of functional performance testing of equipment and systems. (integrating testing procedure into the project schedule).

 Develop & maintain mutually beneficial relationships with all core vendors and suppliers to ensure competitive pricing, priority delivery and top service and clear understanding of expectations regarding quality, timeliness.

 Leading main role in the tendering department in the preparation MEP quotation for the tender works of the building quoted by Al Alhamadiah Trading & Co.

Sr. Mechanical Engineer في BK Gulf
  • الإمارات العربية المتحدة - دبي
  • يوليو 2004 إلى مارس 2006

July 2004 to March 2006

BK Gulf L.L.C., Dubai, UAE
Senior Mechanical Engineer

Job profile:

 Being a hard core design engineer, directly report to Engineering Manager and coordinated with consultant to resolve many MEP related design issues to prepare shop drawings for 2 Nos. Dubai Airport projects - AX -151, Hanger and AX-101 Cargo.

 Selection of MEP equipment complying to project specification by close coordination with consultant and client to obtain their approval for successful completion of 2 Nos. Dubai Airport projects.

 Handled project procurement with close association with purchased manager as per project requirement and prepare subcontract agreements in accordance with company procedures.

 Provided full support to the Construction Manager for execution of MEP installation as per design, conforming to project requirement.

 Prepare O & M manuals and as-built drawings; Participate as instructor in the training given on the MEP systems to client.

MEP Projects Handled in UAE :-

 Construction of Dubai Airport Expansion Project - Project No. - AX -101, Cargo Mega Terminal & Multi Story Car Park, HVAC Job Value - ADE 35.4 Millions; M & E Consultants - Dar Al Handasah; Main Contractor - Group Five & Al Naboodah Joint Venture.

 Construction of Dubai Airport Expansion Project - Project No. - AX -151, Dubai Air-Wing Facilities and Royal Terminal. HVAC Job Value - ADE 45 Millions; M & E Consultants - Dar Al Handasah; Main Contractor - Joint Venture of CCC & DBBG.

HVAC Major Project In charge في Bader Mullah Bro. Co. W.L.L., KUWAIT
  • الكويت - الكويت
  • مايو 2002 إلى يوليو 2004

May 2002 to July 2004
Bader Mullah Bro. Co. W.L.L., KUWAIT
HVAC Major Project in Charge

Job profile:

 Leading the design team for selection of HVAC equipment, conforming to project specification and local authorities (Kuwait Fire Brigade, Ministry of Electricity & Water) requirement for high energy efficient equipment.

 Preparation of all MEP services coordinated shop drawings in accordance with project and consultant requirement.

 Organise and attend technical meetings with Consultant and Client to discuss and give proposals for non construct ability design related issues.

 Coordinate with main contractor program and other contractors to manage work interface and enhancement to project scope.

 Organise and attend technical meetings with consultant, client and subcontractors to discuss shop drawings, material submittals and method statements as necessary.

 Updating the time claim details related to MEP work to furnish accurate records of the history.

 Preparing the interim payment certificates for MEP works and follow up of approved payment certificate from main contractor

MEP Project Handled in Kuwait :-

 Construction of (3B+G+34 ) Stories Al Awadi Residential and Commercial Complex.

- HVAC Job Value - KD.14 Million; M&E Consultants -KEO International Consultant; Project Manager - Projects.

 Construction of (G+2) Stories Research Building of Kuwait Institute for Scientific Research, Kuwait
HVAC Job Value - KD.7.2 Million; M & E Consultants

- Bonyan Design International; Main Contractor - Al Amarat Al Jadidah Trading and Contracting Co.

Project Manager في Carrier Aircon Ltd. India,
  • الهند - دلهي
  • يناير 1996 إلى مايو 2002

January 1996 to May 2002

Carrier Aircon Ltd. India, (Sister Concern of CARRIER - USA) North Zone CBU’s Project Department
Project Manager

Job profile:

 Producing project schedule by analysing and selecting resources, processes and systems.

 Project Cost Control, ensuring company's forecasts and budgets are met for these expenses.

 Managed the projects Engineers’ team in planning, designing and execution of mega projects.

 Monitoring progress billing, cost variance reports, cash flow and various projects’ outstanding collection.

 Controlling all the works including, planning, administration, commercial, engineering, site works and documentation.

 Implementation of Carrier's dealer network, promoting Carrier’s equipment in MEP projects with dealers

 Developed and maintained mutually beneficial relationships with all core vendors and sub-contractors to ensure competitive pricing, priority delivery and top service and clear understanding of expectations regarding quality, timeliness

HVAC Mega Projects Handled in India:-

 HVAC project at Danso Ltd. Factory at MIT, Hariyana with - 2Nos. X 550 TR Centrifugal Chillers, 1 No. X 200 TR Screw Chillers & 16 Nos. AHUs. Job Value: $535, 714

 Ansal Plaza Shopping Complex, New Delhi 278 Nos AHUs and Low Side Works
Job Value: $561, 905

 Scope Complex, New Delhi 2 Nos. X 550 TR Cent. Chillers 12 Nos AHUs with low side Works
Job Value: $450, 000

 Paint Shop and Bumper Paint Shop - III, Maruty Udyok Ltd 3Nos x 60 TR Air Cooled Chillers & 3 Nos. AHUS with low side works,
Job Value: $109, 523

 Honda City Car Factory, Noida, UP India3Nos.X 175 TR Screw chillers 12 Nos. AHUs with Low side Works, Job Value : $416, 667.

 Parliament House Annexe, New Delhi3Nos. X 300 TR Cent. Chiller s, 12 Nos. AHUs with low side works. Job Value: $654, 762

 Automobile Factory of New Holand Tractor Ltd. Noida 2 nos. X 250 TR Screw Chillers, 14 Nos. AHUs. with low side works Job Value: $371, 428

Sr. Project Engineer في HVAC System (P) Ltd, New Delhi, (India)
  • الهند - دلهي
  • يونيو 1991 إلى يناير 1996

June 1991 to January 1996
HVAC System (P) Ltd, New Delhi, (India)
Senior Project Engineer

Job profile:

 Design and developing mechanical services drawing, project coordination drawing etc.

 Overall A/C system design including preparation of heat load estimate, psychometric process analysis,
Design of HVAC piping, ducting electrical, selection of refrigeration and air- conditioning system components.

 Interaction with Clients, Consulting Engineers, Architects and contractors for various project related

 Activities and co-ordination. Progress billing, cost variance reports. Planning & procurement of Materials / Equipment.

HVAC projects booked and executed:-

 Renovation works at Ashok Hotel, New Delhi, 4Nos. AHUs with low side works,
Project Value: $50, 000

 Construction of G+8 stories, CSMRS Office Building, New Delhi, 3 Nos.X 120 TR Recip. Chillers, 7Nos. AHUs with low side works
Project Value: $128, 571

 Construction of 130 Baded G.B. Pant Hospital, New Delhi, 4 Nos. X 120 TR Recip. Chillers 24 Nos. AHUs with low side works
Project Value: $561, 905)

الخلفية التعليمية

ماجستير, Energy and Resource Policy
  • في IIT, Delhi, New Delhi
  • ديسمبر 2000

Master Degree Course :- Mater of Technology from Indian Institute of Technology, Delhi, New Delhi in Energy Studies. All kind of Energies ;- 1) Renewable Energies - Bio-gas /Solar/Wind/Tidal/Ocean technology etc. 2) Conventional Energy- Coal 3)Non Conventional Energies - Nuclear technologies Concept of the program is how the different kind of energies are produced, how they have to be utilised efficiently and Energy saving method of all kind of energies.

بكالوريوس, Power Plant Engg, / Operation Research/Automobile/Heat Mass Transfer/ Industrial Management etc.
  • في Muzaffarpur Institute of Technology, India
  • ديسمبر 1990

Engineering Degree Course :- Bach-lore of Engineering, Mechanical Branch, Four years course. Studies all kind of Mechanical Engineering Principles and its application & utilisation. Subjects - Thermodynamics / Heat & Mass Transfer/ Electrical Engineering / Mathematics - Volume - I & II / Hydraulics System / Strength of Materials/Theory of Machines etc. Core Subject - Industrial Management / Power Plant Engineering /Operation Research / Automobiles etc. Engineering Drawing - Basic Civil Engineering Drawings / Mechanical Engineering Drawings. Design Practical - Designing of Machine Components / Equipment/Engines etc.

Specialties & Skills

Project closing & handing over
engineering & design works
Project Planning
Material Sourcing
Project Management
Microsoft Office/ MS Words /Excel

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
العربية
مبتدئ

العضويات

ASHRAE - Associate Member
  • Air - condition System Design
  • June 1994
PMI
  • Project Management - Principles and developement
  • September 2015

التدريب و الشهادات

Diploma in Carrier Air-conditioning System Design (تدريب)
معهد التدريب:
Package Air-conditioning Design
تاريخ الدورة:
July 1997
المدة:
48 ساعة
ISO Certification - ISO9001:2015, ISO 14001:2015 & BS OHSAS 18001:2007 (تدريب)
معهد التدريب:
Al READA
تاريخ الدورة:
January 2017
المدة:
16 ساعة
Sustainable Stadium Designs & Q-SAS Approach (تدريب)
معهد التدريب:
QSAS
تاريخ الدورة:
June 2012
المدة:
8 ساعات
ASHREA Certification - Designing Smoke Control Car park System (تدريب)
معهد التدريب:
FlaktWood UK Ltd & Central Air Conditioning Trading
تاريخ الدورة:
February 2013
المدة:
8 ساعات
Building Design + Construction LEED Rating ( LEED -GA) (تدريب)
معهد التدريب:
Green Technologies FZCO
تاريخ الدورة:
December 2011
المدة:
16 ساعة
Advanced Green Building Principles ( LEED -AP) (تدريب)
معهد التدريب:
Madras Management Training Institute
تاريخ الدورة:
December 2016
المدة:
24 ساعة
Project Management Priciples (تدريب)
معهد التدريب:
Kautilya Project Consultancy
تاريخ الدورة:
April 2014
المدة:
16 ساعة
Advanced Project Management (تدريب)
معهد التدريب:
Madras Management Training Institute
تاريخ الدورة:
May 2013
المدة:
40 ساعة
Auto Cad - Preliminary & intermediate (تدريب)
معهد التدريب:
CADD Center New Delhi
تاريخ الدورة:
June 1995
المدة:
120 ساعة

الهوايات

  • Reading, Swimming, Photography, TV News Watching
    Attained Many Training from Nicon School, getting very good concept about photography