Ramasamy Ramesh, Ccr Operator

Ramasamy Ramesh

Ccr Operator

Doosan heavy industries

Lieu
Inde
Éducation
Diplôme supérieur, Thermal Power Engineering
Expérience
11 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :11 years, 8 Mois

Ccr Operator à Doosan heavy industries
  • Arabie Saoudite - AlJubail
  • juin 2018 à mars 2020
Sr. Operation Engineer à RKM Powergen Pvt Ltd
  • Inde - Bhubaneswar
  • février 2012 à mai 2018

Operations of TG start up (cold, warm, and hot) and desk control.
Give necessary instruction/direction to field Operators/technicians to check and ensure the assigned field jobs are completed and recorded timely.
Co-ordinate with Maintenance departments for day-to-day activity.
Operate/take on-line necessary equipment for smooth running of the plant.
Co-ordinate the startups and shutdown activities of the unit.
Perform activities as per the operating manual in case of any emergency situations with efficient operation of the unit.
Adhere to safety norms and safe work practices.
To maintain the statutory norms related with the stack emission.
Taking Training Classes to Supervisors and Technicians time to time

Krishnapatnam power corporation ltd à Krishnapatnam Power corporation ltd
  • Inde - Hyderabad
  • août 2008 à février 2012

Reviewing of designs submitted by design consultants and involvement in the process of basic Engineering.
Involvement in the process of finalization of equipment specification.
Responsible for preparation of level -1schedule.
Imparting training to Graduate trainees.
Preparation of standard operating procedures for CHP&AHP
Preparation of BOQs for Coal handling plant and Ash handling plant
Techno - economic analysis for selection of Insulation, Vacuum Pulling system in Turbine cycle and Equipment Cooling Circuit system.
Prepared MS Excel template for calculating boiler performance.
Supervision for Geo-Technical survey.
Prepared required documents for Environmental Clearance and Public hearing.
Prepared 30 MW Captive Power Plant feasibility study reports.

Éducation

Diplôme supérieur, Thermal Power Engineering
  • à National Power Training institute
  • avril 2008

TRAININGS UNDERGONE The 2 week simulator training program was conducted at NPTI, Nagpur (Western Region) on a 210 MW real time simulator which is a replica of 210 MW Khaperkheda Thermal Power Station of M.S.E.B, have undergone this training in conventional control board & video process console. The 2 weeks of scheme tracing this was organized at THERMAL STATION –II (7 X 210 MW) OF NEYVELI LIGNITE CORPORATION LIMITED (N.L.C), NEYVELI. The 3 weeks of rotational on job training (operation) & 4 weeks training of rotational on job (maintenance) which was organized at THERMAL STATION –II (7 X 210 MW) OF NEYVELI LIGNITE CORPORATION LIMITED (N.L.C), NEYVELI.

Diplôme supérieur, power plant Engineering
  • à National Power Training Institute
  • avril 2008

PGDC (O&M Thermal Power Plant) in NPTI – Neyveli. This Training Programme includes- On-Job Training in Neyveli NLC-Thermal Power Station (210 MW LFPP). 2 weeks Simulator Training (Typical 210 MW Thermal Power Plant) in NPTI Nagpur

Diplôme supérieur, Thermal Power Engineering
  • à National Power Training Institute
  • avril 2007
Baccalauréat, Mechanical Engineer
  • à Annamalai University
  • février 2005
Diplôme, Mechanical Engineering
  • à Muthiah Polytechnic Institute
  • mars 1997
Etudes secondaires ou équivalent, Tamil nadu State board subjects
  • à Govt high school
  • avril 1992

Specialties & Skills

Plant Commissioning
Power Plants
Power Plant Operations

Langues

Tamil
Expert
Anglais
Expert
Hindi
Débutant

Formation et Diplômes

210 MW Thermal power plant Simulator Training (Formation)
Institut de formation:
National Power Training Institute
Date de la formation:
May 2008
Durée:
288 heures

Loisirs

  • Watching TV, Listening Music , Books Reading