مجموع سنوات الخبرة :22 years, 2 أشهر

Delay Analyst في Salam Technology
  • قطر - الدوحة
  • سبتمبر 2017 إلى سبتمبر 2018

• Search and gather all relevant data such as, but not limited to, Correspondences, Minutes of Meetings, specifications and drawings to support each respective delay events.
• Liaise with respective subject matter experts involved in the delay event/activity such as Construction Managers, Project Coordinators, Planning Team, Subcontractors (if any) and the Commercial team to get to the bottom of the issue/event.
• Assists Claims External Consultants (HKA) in developing/preparing Chronology on each respective Delay Events up to the eventual completion of Interim Claim.
• Assesses the impact(s) of design/construction changes and schedule slippages.
• Prepare Counter-claims for Sub-contractors

Sr. Planning Engineer في KEO International Consultant
  • قطر - الدوحة
  • يونيو 2013 إلى أغسطس 2017

• Review Extension of Time Claim by the Contractor.
• Perform Forensic Delay Analysis (Time Impact Analysis) for the Client. (Contract, FIDIC or SCL Protocol).
• Involve in review of Baseline Program and Recovery Program if
necessary.
• Conduct regular site inspection and perform assessment on
Project Progress.
• Review and Perform progress monitoring and Integrated change Control.
• Develop Risk Register.
• Prepare Weekly Dashboard, Comprehensive Monthly
• Report and Top Management Report.

Sr. Planning Engineer في SKY ORYX Joint Venture
  • قطر - الدوحة
  • أغسطس 2011 إلى ديسمبر 2011

(1) Assigned to lead the preparation for bi-weekly and Monthly update report
(2) Monitor and update schedule progress againts Baseline Schedule
(3) Assist the team on Time Impact and delay analysis and review of schedule periodic updates.
(4) Keep track on all project changes and monitor its effect on Baseline schedule and inform Project management team.
(5) Analyze the delay of the project and study corrective action to mitigate delays.
(6) Assist with the preparation of Time and Cost claims.

Sr. Planning Engineer في AL RASHID TRADING and CONTRACTING COMPANY
  • المملكة العربية السعودية - الرياض
  • يونيو 2009 إلى يونيو 2011

(1). Involves in Planning, Monitoring & Control and Close-out stage of the Project.
(2). Prepares Master Schedule in Primavera 6.2 version
(3). Communicate regularly with the Project Director/Manager of the project regarding the over-all status of the Project. Update schedules and monitor actual versus Planned Schedule (Baseline)
(4). Prepares Weekly Report Comprehensive Monthly Report
(5). Review and manage sub-contractor's schedule and work performance.
(6). Attends Weekly Coordination Meeting with the conultants and prepares (internal) Communication Management Report.
(7). Monitors the Manpower loading and Equipment loading of each respective on-going projects regularly.
(8). Provides Materials Delivery Schedule to the Procurement Division as part of the Risk Management.

Project Manager / Project Supervisor في 141 Construction & Services
  • الفلبين
  • يناير 2005 إلى مايو 2009

1.Responsible for the over-all management of the project
2. Prepares Project management plan including Project schedule using Primavera 3.0.
3. Monitor budget of multi-dicipline.
4. Ensures that all operations are undertaken in a safe manner and in accordance with the standard set by the client/owner.
5. Effects close liason with the client's Management Team.
6. Control the direction of the multi-workforce and other sub-contractors.
7.. Conducts Weekly coordination meeting and construction meeting.

Project Engineer في Object Builders for Asia Dev. Corporation (OBAdc)
  • الفلبين
  • يوليو 1996 إلى يناير 2002

1. Establish Project Communication with client and sub-contractors.
2. Reiew and implement project plan and program.
3. Prepares weekly and Monthly reports to Project manager and client.
4. Do quantity surveying, do Bar-cutting list, bar charts, and Payment Certificate.
5. Co-ordination and preparation of Projet Close-out Reports.
6. Ensures compliance with corporate Quality management team as far as quality is concern.

Cadet Engineer في MRJ Construction Corporation
  • الفلبين
  • فبراير 1992 إلى مايو 1996

1. Assistant of the Project Engineer.
2. Prepares and Submit Request for Inspection (RFI) forms to consultants.
3. Prepares Shop Drawings.
4. Prepares daily Activity Report.

الخلفية التعليمية

بكالوريوس, Bachelor of Science in Civil Engineering
  • في Mapua Institute of Technology
  • أكتوبر 1989

Specialties & Skills

Management
Microsoft Word
Inspection
Project Management
MS Word, Excel, Power Point
Primavera 3.0, 6.18

اللغات

الانجليزية
متمرّس

العضويات

Association for the Advancement of Cost Engineering International (AACEI)
  • Regular Member
  • November 2012
PMI
  • Member
  • March 2013

التدريب و الشهادات

Certified PSP from AACEI (الشهادة)
تاريخ الدورة:
January 2013
صالحة لغاية:
January 2016
Project Management Professional (PMP) (الشهادة)
تاريخ الدورة:
September 2016
صالحة لغاية:
September 2019
Risk Management Professional (الشهادة)
تاريخ الدورة:
May 2016
صالحة لغاية:
May 2019