FPI the world's leader in design and manufacturing of composite large diameter fiberglass pipe system
Responsible for preparing the master schedule of various production lines to ensure the best utilization of machines in terms of efficiency and on time production / delivery;
Preparing the delivery schedule based on client requirement and also ensuring the maximum production efficiency.
Providing the monthly sales revenue to the management.
Monitoring the budgeted and actual sales revenue & reporting if in case of variance.
Follow with the production department to ensure the material availability on time.
Raw material planning. ( MRP - Bases on the forecasted & confirmed production plan)
Company Overview: A Complete dry wall system provider.
Largest & fastest gypsum plaster board plant in Middle East with annual production capacity of 50 Million sqm.
Metal profiles (Roll forming plant) - Joint venture with Rondo metal systems.
Job Description:
Production planning based on the production request and plant capacity
Capacity requirement planning for optimum utilization of machineries
Material requirement planning based on sales history & market forecast and reporting to the procurement team
Periodic follow up of critical raw materials shipment status from logistic team and production planning as per the updates.
Preparation of standard Bill of Materials (BOM).
Production planning(PP) and Raw material planning (MRP) in SAP (ERP system)
Preparing daily production report, raw material consumption reports and machine utilization.
Preparation of monthly costing data sheet (Variable cost) and reporting the variance with standard BOM
Coordinating with finance and dispatch team for the month end stock verification and reconciliation.
Identifying the KPI's and preparing the presentation for plant operation meet and management review meetings
Preparing, data collection and training for WCM activities in the plant
Assisting the maintenance team for identifying the MTTR and MTBF for machineries in the plant
5W 1H analysis for the reaching consistent solution for issues in process.