Ranganath Chakraborty, Lease Partner

Ranganath Chakraborty

Lease Partner

Madan Mohan Rice Mill

Location
India
Education
Doctorate, TQM & Audit Management
Experience
10 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :10 years, 0 Months

Lease Partner at Madan Mohan Rice Mill
  • India - Barddhaman
  • May 2020 to February 2021

Looking after production of Rice, procurement of Paddy, coordinate with paddy suppliers, Maintaining accounting activities including banking transactions etc.

Recruitment Manager at Kodak Mahindra
  • India - Kolkata
  • January 2018 to December 2019

Recruitment of Senior Advisor, Advisor for Insurance Business under Kodak Mahindra Group. Training and development of recruited professional.

Corporate Quality Manager at Bin Quraya Est.
  • Saudi Arabia - Eastern Province
  • January 2015 to June 2016

Joined with Bin Quraya with a vision to effectively implement the Quality Management System all through the Establishment will help in establishing Company's strong reputation and global presence.
Presently have been working on establishing a systematic Quality Management System at par with ISO 9001-2008 requirement, which involves identifying gaps in Control of Documents, Control of records, assessing Qualification requirement, exploring the need of CPD among the staffs, developing policies related to effective implementation of Total Quality Management, Team Management etc. In addition getting assigned to take up QAM role for project activities.

Senior Inspection Engineering at Saudi Aramco (SMP)
  • Saudi Arabia - Eastern Province
  • June 2012 to July 2014

 Handling the responsibilities of Coordinator NAC&ID (Northern Area Corrosion and Inspection Division). Coordinating with Unit Heads for all techno-administrative activities, tracking all the major Division activities, reviewing/compiling/consolidating and controlling daily/weekly/monthly reports and other division related documentations.
 Actively participated in Integrity Assessment of Juaymah NGL Injection System's two 14 "Pipe Lines.
 Participated in Inspection of Substation facilities with more than 132 KV power generation capacities power transformer, HV Cable and other linked Electrical Installation.
 Witnessing periodic maintenance and testing of Transformer, Power rheostat and other high voltage electrical facilities.
 Shouldering the responsibility of controlling, monitoring and inspection Activities for Assigned Plants (Onshore and Offshore) for AAPD and AS&QPD.
 Participated in RBI Study of AAPD and ASQPD Operation facilities. Which includes monitoring of NDT activities and reviewing of NDT data of Plant pipelines facilities and Fabrication Workshop.
 Accountable for documentation / QCP / ITP, review of drawings, scheduling of man hours and other operation and maintenance related assignments. Review of drawing is including but not limited to HVAC Installation, Pre fabricated Duct Installation, P&ID, Cause and effect diagram etc.
 Liable for preparation of Annual Electrical & Instrumentation Survey, Hotspot Survey, and Cathodic Protection Survey schedule for both Onshore and Offshore facilities under Abu Ali Producing Division independently.
 Performing assessment for the proposed modification for any existing and or to be constructed facilities.
 Project Control: Looking after inspection of in service Motor, Junction Boxes, Sub Stations, PIBs', Process Vessels, Skids', Cable Tray run, Conduit, MCC, Transformer, Instrumentation Equipment including Control Valves, Pressure Instruments, Flow & Control Instruments, HVAC Installation and maintenance program (Saudi Aramco, NAC&ID).
 Training: Has Imparted training to the Team members as well as other departmental staffs to confirm Continual Professional Development as well as to establish a Quality Work Culture. Also provided training for NDT Certification in different occasions. Apart from that has shared knowledge on HVAC Installation Guidelines including pre fabricated Ducting Installation.
 Auditing: As QMS Lead Auditor, has conducted SPA, TPA for several Industrial and non-Industrial facilities. Also conducted review to confirm proper implementation of CAPA and observed/documented NCRs as per ISO 9001-2008.
 Risk Management: Doing root cause analysis, Participated in RBI Study of AAPD Operation facilities.
 Certification and Assurance: Working on SAP within Saudi Aramco facilities are the scope of work, conducting Quality Audit and assessment.
 Maintenance inspection of FO cable installation in namely SS, PIB, Communication Building and DCS Building and its associated accessories and witnessing testing of failure analysis of FO Cable.
 Development and Growth: Monitoring and inspecting HVAC activities in the areas assigned, monitoring pre commissioning of Electrical and Instrumentation Equipments/systems namely Transformer, Motor, Generator, Analyzer, Metering Skid, Instrument Loop and Valves. Performing PMCC walk through for any completed project before being put into service and generate report as outcome.

Senior Surveyor at Bureau Veritas
  • India - Bhubaneswar
  • August 2011 to December 2011

 Provided inspection coverage as third Party for on-going project, where area of coverage is Boiler, ESP, CWPH, DG Building, Control Building, and Substation as independent Inspection agency representative.
 Managed the inspection for Substation Construction, PCB Installation, and Cable Trench inspection, Cable Tray Installation, MCC Installation, Transformer Installation and Commissioning, Motor Installation, Instrumentation Installation including Control Valves, Pressure Instruments, Flow Instruments and Control Instruments.
 Witnessed installation and testing of Transformers facilities responsible to generate 135 MW power alongside testing witnessing of Substation HV cable(DC High pot testing and other) which has the capacity of 220 KV and more.
 Has taken active part in installation of HV Cable, FO cable and other Electrical facilities. Construction installation execution witnessing responsibilities of Noise free Communication System through FO Cable and its associated accessories namely connectors ST, SMA, Cable Trays, Pathways/Raceways, Conduit etc.
 Auditing: As QMS Lead Auditor, has conducted SPA, TPA for Project facilities. Also conducted review to confirm proper implementation of CAPA and observed/documented NCRs as per ISO 9001-2008.
 Certification and Assurance: Working on scheduled Inspection procedure to confirm completion of project activities within the scope of work and conducted Quality Audit to confirm implementation of CAPA.
 Has taken part in HVAC Installation including Ducting with related drawing review, supervision of construction activities. Also includes monitoring of NDT activities and reviewing of NDT data of Plant pipelines facilities and Fabrication Workshop.
 Project Control: Responsible for preparation of FIR, MR etc., and attending daily, weekly and monthly project quality meetings.
 Training: Has Imparted training to the Team members as well as other departmental staffs to confirm Continual Professional Development as well as to establish a Quality Work Culture. Also offered presentation on Implementation of Quality Tools in Industrial Business Practices during the course of project activities.

Senior Inspection Engineering at Saudi Aramco (GIS-ABSG)
  • Saudi Arabia - Eastern Province
  • November 2009 to August 2011

 Responsible for controlling, monitoring Inspection Activities for assigned Project.
 Accountable for PQP, documentation / QCP / ITP, review of drawings, scheduling of man hours and other project related assignments.
 Effectively controlled five sites (Berri Gas Plant control sulphur emission project, PLC up gradation project, Abu Ali Extension project and National Chevron Philips (third party) project, AICO Metering Skid Project and Replacement of Online Analyzer Project) as client representative. Faber Optic Cables installation has been monitored, controlled and witnessed by me during my project activities of PLC up gradation Project for Berri Gas Plant facilities in Saudi Arabia for Saudi Aramco. Under this up gradation phase by using this technology under three Modules namely Electrical Interface Module (EIM), Optical Interface Module(OIM) and Power Supply Module the installation was done. Use of connectors mainly ST & SMA for FO cable termination beside determining correct type of Buffer used to be confirmed. Leaving apart certain guidelines used to be followed as per Saudi Aramco Engineering Standard under T(Communication) category, NEC 300 Series and NEC article 770 . These type of cables has more sustainability than other copper cable for long distance signal carrier with very less noise free technology.
 Auditing: As QMS Lead Auditor, has conducted SPA, TPA for several Industrial and non-Industrial facilities. Also conducted review to confirm proper implementation of CAPA and observed/documented NCRs as per ISO 9001-2008.
 For RFID(Radio Frequency Interface Distribution) Project in Berri Gas Plant, Abu Ali GOSP and Juaymah Gas Plant and GOSP, the same FO cables were used as signal carrier and I was responsible for installation of the same apart from other convertor installation. Installation activities used to be executed, controlled, monitored and witnessed by following certain guidelines used to be followed as per Saudi Aramco Engineering Standard under T(Communication) category, NEC 300 Series and NEC article 770.
 Has been involved in HVAC Installation project in parallel Extension project which includes complete HVAC installation including pre fabricated ducting. Conducted material receiving inspection of pre fabricated Ducting in site as well as in Vendor's workshop.
 Witnessing is done on Hydro test activities in Pipeline construction on site and in Fabrication Workshop. Also involve in monitoring of NDT activities and reviewing of NDT data of Plant pipelines facilities and Fabrication Workshop.
 Project Control: Liable for inspection for Substation Construction, Cable Trench inspection, Cable Tray Installation, MCC Installation, Transformer Installation and Commissioning, Instrumentation Installation including Control Valves, Pressure Instruments, Flow Instruments and Control Instruments (Saudi Aramco, SAPID)
 CRM, Contract Bidding and Budgeting: Has taken keen interest professionally in maturing CRM, reviewed Bidding Scopes, estimated cost effectively and in parallel has monitored and controlled budget specific procurement by maintaining the adopted standards.
 Risk Management: Managed root cause analysis and risk based inspection
 Certification and Assurance: Working on SAP within Saudi Aramco facilities (QMIS) individually; conducted Quality Audit and assessments for the on-going projects under my responsibilities..
 Training: Has Imparted training to the Team members as well as other departmental staffs to confirm Continual Professional Development as well as to establish a Quality Work Culture. Also taken classes for On Job Training related to Implementation of Quality Tools during project execution phases to make the entire division aware of the ISO 9001 requirements.

Deputy Quality Manager at IHI Corporation
  • Qatar - Doha
  • January 2008 to April 2009

 Responsible for monitoring and carrying out inspections related to NDT Testing, Civil & E&I Activities and Other For LNG Tank Facilities Project.
 Development, Growth and Project Control: Installation of FT, PT, Manual Call Point, Control Valves (Globe & Butterfly), PG, Instrument Tubing, Emergency Push Button, Pump Hoist, Cathodic Protection, Functional Testing of Skin Temperature Elements, Cable Tray Installation(Instrument & Electrical), Pump Motor Installation, Lighting Fixture and Receptacle Installation, Lightning Protection Installation and Under Tank Heating System Installation etc. Has taken part in HVAC Installation including pre fabricated Ducting with related drawing review, supervision of construction activities. In parallel witnessed testing of Substation power transformer and HV cable with capacity of 220 KV and above to control power generation for LNG Tank Maintenance facilities.
 Auditing: As QMS Lead Auditor, has conducted SPA, TPA for Project facilities. Also conducted review to confirm proper implementation of CAPA and observed/documented NCRs as per ISO 9001-2008.
 Risk Management: Apart from the direct monitoring of inspection, carrying out Root Cause Analysis, Risk Based Inspection
 Certification: Worked on SAP within IHI facilities are the scope of work individually being performed by me, also Quality Audit and Assessment for on-going Project as LO.
 CRM: Accountable for QA/QC related documentation apart from being a part of Contract bidding.
 Witnessing is done on Hydro test activities in Pipeline construction on site and in Fabrication Workshop. Also involve in monitoring of NDT activities and reviewing of NDT data of Plant pipelines facilities and Fabrication Workshop.
 Training: Has Imparted training to the Team members as well as other departmental staffs to confirm Continual Professional Development as well as to establish a Quality Work Culture. Also taken classes for On Job Training related to Implementation of Quality Tools during project execution phases to make the entire division aware of the ISO 9001 requirements.
 Assurance: Monitored pre commissioning of Electrical and Instrumentation Equipments/systems namely Power Transformer with 132 KV and above capacity, Motor, Generator, analyzer, Metering Skid, Instrument Loop and Valves, revision of ITPS' & QCPS' .
 Contract Bidding and Budgeting: Has taken keen interest professionally in maturing CRM, reviewed Bidding Scopes, estimated cost effectively and in parallel has monitored and controlled budget specific procurement by maintaining the adopted standards.
 Construction installation execution responsibilities of Noise free Communication System through FO Cable and its associated accessories namely connectors ST, SMA, Cable Trays, Pathways/Raceways, Conduit etc.
 Project/Quality Control: Assisted in making of revision of drawing as per constructional requirement, commissioning of Cathodic Protection System, DCPS (Dry Chemical Powder System) for LNG tanks facilities etc.
 Resource Management: Done scheduling of manpower deployment alongside taking interview for the new prospect.
 The responsibility is including but not limited to monitoring and inspecting HVAC activities took place in the areas assigned.
 Planning: Involved in scheduling the assigned responsibilities as well as planning for timely completion of the projects based on strategic data and other factors with the use of system tools as like primavera.

Education

Doctorate, TQM & Audit Management
  • at Kaizan Global School of Business Management
  • February 2017
Master's degree, Total Quality Management
  • at Kaizan Global SChool of Business Management
  • July 2013
Diploma, Railway Works Engineering
  • at IPWE, New Delhi
  • July 2004
Bachelor's degree, Electrical Engineering
  • at Govt. of India (Min of Edn and Social Welfare- Dept of Edn vide OM F No. 18-552/75/T-7 dtd 22 Jul 77
  • December 1996

A Government of India sponsored degree program which is offered after completion of regular Military Technical Course Study followed by 10 years of work experience in same organization (Government of India, Indian Air Force).Credit transfer is authenticated by Govt. of India for Global reorganization. Being incumbent, I have fulfilled all the requirement including completing the study as well as completing more than 15 years Military technical service for Indian Air Force till Dec 2006.

Specialties & Skills

Project Quality Control
Inspection Assurance & Certification
Enterprise Risk Management
Remote Team Management
Total Quality Management
Risk Management
Growth and Planning, CRM,Project / Quality Control
Team Management
Resource Management
Inspection Assurance & Certification
Quality Management

Languages

English
Expert
Bengali
Native Speaker
Hindi
Native Speaker
Arabic
Intermediate
Urdu
Intermediate

Memberships

IEEE
  • Writing Article, publishing documents, attending seminars, promoting
  • September 2010
IAEI (International Association of Electrical Inspector)
  • Writing Article, publishing documents, attending seminars, promoting
  • June 2010
MCQI, CQP
  • Writing Article, publishing documents, attending seminars, promoting
  • September 2010

Training and Certifications

QMS Lead Auditor (Training)
Training Institute:
LRQA
Date Attended:
December 2007

Hobbies

  • Writing Articles on TQM
  • Reading