Rania  ashraf, Structural Analysis Engineer

Rania ashraf

Structural Analysis Engineer

AMAD GROUP

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, هندسه مدنيه-انشاءات
Expérience
6 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :6 years, 10 Mois

Structural Analysis Engineer à AMAD GROUP
  • Egypte - Le Caire
  • Je travaille ici depuis juillet 2017

Service-28 at Harm city-Orascom's Owner-In 6th October City
The project consists of 2rd floors + Roof floor, Area of Project was 900 square metre.
I used the Egyptian Code.

KAKI Project at Jeddah Kingdom of Saudi Kingdom.
The project consists of the following :
Block(A) : GWTL + WTL + LG + G + Technical + 14 floors + Roof .
Block(B, C) : GWTL + WTL + LG + G + Technical + 14 floors + Roof .
Block (D, E, M) : LG + G + Technical + 12 floors + Roof .
Block (F, G) : WTL + B + G + Technical + 12 floors + Roof .
Block (K, L) : WTL + B + G + Technical + 12 floors + Roof .
Block (H, J) : WTL + B + G + Technical + 14 floors + Roof .
Block (P) : B + G + Mezzanine + 3 floors .
I used the following codes for structural design :
ACI 318M-11 : Building Codes Requirement for Structural Concrete and
Commentary.
ACI 224R-01 : Control of Cracking in concrete Structures.
ACI 216.1-07 : Code Requirements for Determining Fire Resistance of Concrete.
ASCE 7-10 : Minimum Design Loads for Buildings and Other Structures.
UBC 97 : For seismic loads.
CIRIA special publication; no.31 : The CIRIA guide to concrete construction in the Gulf region.
- I used ETABS 2016 to carry out the analysis and member design phases of the project, SAFE 16 to perform the detailed structural analysis and design of slabs and footings.

Jabal Al Kaaba Project(JAK 2), Makkah, Kingdom of Saudi Arabia.
The project consists of the following :
Tower C : 1 Basement + G + Technical + 27floors + Roof.
Tower D+E : 2 Basement + G + Technical + 27floors + Roof.
I used the following codes for structural design :
ACI 318M-11 : Building Codes Requirement for Structural Concrete and
Commentary.
ACI 224R-01 : Control of Cracking in concrete Structures.
ACI 216.1-07 : Code Requirements for Determining Fire Resistance of Concrete.
ASCE 7-10 : Minimum Design Loads for Buildings and Other Structures.
CIRIA special publication; no.31 : The CIRIA guide to concrete construction in the Gulf region.
-Saudi building codes (Live, Seismic and Wind loads)
SBC 301 - Loading and forces.
SBC 302 - Testing and Inspection.
SBC303 - Soil and Foundations.
SBC 304 - Concrete Structures.
SBC 306 - Steel Structures.
- I used ETABS 2016 to carry out the analysis and member design phases of the project, SAFE 16 to perform the detailed structural analysis and design of slabs and footings.


Training
ــــــــــــــ
Construction at CCC Company.
Construction at DETAC Company.
Steel Design at MOHARM BAKOM Company.
Construction National Air Navigation Services Company.

Éducation

Baccalauréat, هندسه مدنيه-انشاءات
  • à كليه الهندسه بشبرا
  • juin 2017

Specialties & Skills

Achievement
Hardwork
Time Management
Decision Making
Problem Analysis
AUTOCAD
SP COLUMN
CSI COLUMN

Langues

Anglais
Moyen