Ravi Prakash Belagur, PROJECT MANAGER

Ravi Prakash Belagur

PROJECT MANAGER

ENGINEERING

Lieu
Royaume Uni - London
Éducation
Etudes secondaires ou équivalent, Mechanical Engineering
Expérience
32 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :32 years, 6 Mois

PROJECT MANAGER à ENGINEERING
  • Grande Bretagne (UK)
  • juillet 2012 à octobre 2013
Project/Study Manager
  • novembre 2012 à avril 2013

Focal point responsibility for modularisation concept study of ROSE technology (22k bpd refinery) CAPEX ca. $120m, ±25%, managed a highly skilled project team (22 staff, 5000 MH). Achieved 100% earned progress within 85% time spent. Lead a KBR team in presenting the concept, construction strategies and capability of KBR to Neste Oil.

PMC MANAGER
  • mai 2009 à juin 2012

on secondment to Shell PMT (Operator), responsible for construction site PMC including Technical Assurance/Quality Control (complying with project's technical standards, KPIs) of 7 EPC/EPCM sub-projects in Pearl GTL project (ca. $18bn, 140k bpd refinery, COMAH), Qatar managing multiple interfaces with Shell/Implementation Contractors' teams. Successfully handled additional responsibility of Field Engineering Manager for FGP, Offsites/Jetty.
•Received ‘Recognition Award' from the Project Director for outstanding contribution to the project.
•Recipient of ‘Pride in Production' award for successful completion and handover of Kero Blending+pipeline project.
•Termed a ‘Complete Finisher' and one with ‘Can-do, Will-do' attitude by Shell Managers.
•Managed design and handover of EPC/EPCM contractors - Technip, JGC, KBR, Toyo, Chiyoda, CB&I, Linde at site.
•Project management, plans/procedures, completions/commissioning, compliance of Special projects; met site KPIs.

Sr. Project Engineering Manager
  • novembre 2006 à mai 2009

Responsible for EPCM phase of Utilities Upgrade project, Karsto Expansion Project (Oil/Gas processing), Statoil, Norway with multiple interfaces with resident client team/vendors/contractors/construction.
•The sub-project had 10 packages (incl. Boiler) with 80% modularisation (ca. GBP500m) to ASME/Norsok/Statoil etc.
•Project man-hours 400k+; lead a task force with 120+ multi-discipline (10 Leads), multi-cultural technical personnel.
•Systems integration between retrofit and revamped packages with existing systems, Hazop, VIP, Constructability, 3D.
•Motivated and guided the team to meet all the 15 project milestones regarding schedule and productivity.
•Management of CTR, execution strategy, resource forecasting, planning and monitoring, EVA; risk management.

  • août 2004 à octobre 2006

Saipem India Project Services Ltd., India, a 100% subsidiary of Saipem s.a., France, Eni Group.

p.a
  • août 2006 à octobre 2006

Project MH: 8000 for each FPSO (gas and oil); project schedule 3 months.

DEPUTY GENERAL MANAGER
  • juillet 2006 à octobre 2006
à LNG Tanks
  • novembre 2005 à août 2006

160k m3 x 2; ca. USD 300m, timescale 10m; CSA Z276), Canaport LNG project, Canada; EPC JV (SNC Lavalin & Saipem

SENIOR MANAGER
  • août 2004 à juin 2006

Reported to the SVP - Projects. Identified as a high-performer and pacesetter in the company, selected for fast-track career progression to strategic management level. Promoted as Deputy General Manager in a short duration as reward for extraordinary project delivery engaging 3 execution centres, risk/interface management amongst JV partners, contract handling, meeting all KPIs/milestones, customer satisfaction, budgets, engineering & procurement, site support.
•Thorough performance evaluation, talent management, employee development, organisational effectiveness at HVEC.
Project Manager - project management, project engineering, profit & loss of LNG Regas Terminals & Offshore FPSO:

PROJECT MANAGER à Chemtex Consulting of India (P) Ltd
  • Inde
  • avril 2004 à août 2004

Reporting to Project Director, responsible for EPCM project engineering & management, and P&L of an 18k TPA acrylic fibre project (USD 200 m) for Alexandria Fiber Co., Egypt. Motivated the team to progress from 0.3% to 28% in 4m.
•Project MH 85000 for Engineering & Procurement; plus 25 man-months for construction supervision.
•Reviewed scope, managed resources (35+ staff), implemented 3D PDMS, project WBS, EVMS, QMS, HAZOPs etc

SENIOR PROJECT MANAGER à Rawwater Engineering Company Ltd
  • Grande Bretagne (UK)
  • août 2002 à novembre 2003

SME, oil & gas consultancy)
Reporting to the COO, responsible for project planning & management of technology related and bespoke projects (ca. £75k-150k) for O&G clients, liaising with clients/companies/consultants, proposals/invoicing/payments/administration.
•Managed technological project for DTI, UK/Shell - “Deep oil well Expanding metal alloy plug” - proof of concept.
•Developed skills in NPD, IP search, IP issues, Value creation, timely data delivery, quality report writing, etc.

PRINCIPAL ENGINEER à PIPING
  • Inde
  • août 1997 à août 2002

Responsible for project engineering & management in piping, concept studies, detail/field engineering, construction.
•Lead Engineer of portfolio of 14 brownfield/greenfield Petrochemicals/Chemicals/O&G/Fertilisers projects spread worldwide (5-50 staff, $5m-$800m, pre-FEED, FEED, EPC/LSTK/FPLS/Reimbursable, proposals) many with overlapping schedules; handled project kick-offs, estimates, engineering, specifications, layout, 3D modelling, Isos, MTOs, design reviews. Site fabrication, execution support. As departmental auditor improved quality.
•Executed projects from Europe to SE Asia for clients - Radici Germany (Adipic Acid), QP, QAPCO, QAFCO, GNFC (Weak & Concentrated Nitric Acid), Sasol, Asean Bintulu (Ammonia/Urea) etc.

ENGINEER / PROJECT ENGINEER à SR
  • Arabie Saoudite
  • avril 1988 à août 1997

(Operator).
At IPCL-MGCC (ca.$1.5bn) involved in PMC, construction & commissioning of a mega greenfield Gas Cracker/ petrochemicals facility, focal point in Technical Services Department for project engineering & management including PMC, O&M, concept to commissioning of all revamps/modifications, de-bottlenecking in the COMAH like operating facilities (incl. gas cracker/polymers) of the petrochemicals complex for improving operability, safety and maintainability.

Éducation

Etudes secondaires ou équivalent, Mechanical Engineering
  • à Eni Corporate University
  • janvier 2012

Suite of site specific trainings, Pearl GTL Project, Qatar

Etudes secondaires ou équivalent, Mechanical Engineering
  • à Indian Institute of TechnologyIIT
  • janvier 1995

courses: Piping Engineering

Master, Mechanical Engineering
  • à University of Mysore
  • janvier 1986

Oil & Gas Management), UPES, India (CGPA: 3.41/4)

Baccalauréat, Mechanical Engineering
  • à University of Mysore
  • janvier 1986

Oil & Gas Management), UPES, India (CGPA: 3.41/4)

Specialties & Skills

Mechanical Maintenance
Project Management
Project Engineering
Engineering
COMPUTER ASSOCIATES PACKAGES
CONCEPT DEVELOPMENT
CUSTOMER RELATIONS
MACROMEDIA DIRECTOR
OIL PAINTING
PROJECT MANAGEMENT
PROPOSAL WRITING
QUALITY

Langues

Anglais
Expert
Français
Expert
Allemand
Expert
Italien
Expert