Ravi Prakash Belagur, PROJECT MANAGER

Ravi Prakash Belagur

PROJECT MANAGER

ENGINEERING

البلد
المملكة المتحدة - لندن
التعليم
الثانوية العامة أو ما يعادلها, Mechanical Engineering
الخبرات
32 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :32 years, 6 أشهر

PROJECT MANAGER في ENGINEERING
  • بريطانيا العظمى
  • يوليو 2012 إلى أكتوبر 2013
Project/Study Manager
  • نوفمبر 2012 إلى أبريل 2013

Focal point responsibility for modularisation concept study of ROSE technology (22k bpd refinery) CAPEX ca. $120m, ±25%, managed a highly skilled project team (22 staff, 5000 MH). Achieved 100% earned progress within 85% time spent. Lead a KBR team in presenting the concept, construction strategies and capability of KBR to Neste Oil.

PMC MANAGER
  • مايو 2009 إلى يونيو 2012

on secondment to Shell PMT (Operator), responsible for construction site PMC including Technical Assurance/Quality Control (complying with project's technical standards, KPIs) of 7 EPC/EPCM sub-projects in Pearl GTL project (ca. $18bn, 140k bpd refinery, COMAH), Qatar managing multiple interfaces with Shell/Implementation Contractors' teams. Successfully handled additional responsibility of Field Engineering Manager for FGP, Offsites/Jetty.
•Received ‘Recognition Award' from the Project Director for outstanding contribution to the project.
•Recipient of ‘Pride in Production' award for successful completion and handover of Kero Blending+pipeline project.
•Termed a ‘Complete Finisher' and one with ‘Can-do, Will-do' attitude by Shell Managers.
•Managed design and handover of EPC/EPCM contractors - Technip, JGC, KBR, Toyo, Chiyoda, CB&I, Linde at site.
•Project management, plans/procedures, completions/commissioning, compliance of Special projects; met site KPIs.

Sr. Project Engineering Manager
  • نوفمبر 2006 إلى مايو 2009

Responsible for EPCM phase of Utilities Upgrade project, Karsto Expansion Project (Oil/Gas processing), Statoil, Norway with multiple interfaces with resident client team/vendors/contractors/construction.
•The sub-project had 10 packages (incl. Boiler) with 80% modularisation (ca. GBP500m) to ASME/Norsok/Statoil etc.
•Project man-hours 400k+; lead a task force with 120+ multi-discipline (10 Leads), multi-cultural technical personnel.
•Systems integration between retrofit and revamped packages with existing systems, Hazop, VIP, Constructability, 3D.
•Motivated and guided the team to meet all the 15 project milestones regarding schedule and productivity.
•Management of CTR, execution strategy, resource forecasting, planning and monitoring, EVA; risk management.

  • أغسطس 2004 إلى أكتوبر 2006

Saipem India Project Services Ltd., India, a 100% subsidiary of Saipem s.a., France, Eni Group.

p.a
  • أغسطس 2006 إلى أكتوبر 2006

Project MH: 8000 for each FPSO (gas and oil); project schedule 3 months.

DEPUTY GENERAL MANAGER
  • يوليو 2006 إلى أكتوبر 2006
في LNG Tanks
  • نوفمبر 2005 إلى أغسطس 2006

160k m3 x 2; ca. USD 300m, timescale 10m; CSA Z276), Canaport LNG project, Canada; EPC JV (SNC Lavalin & Saipem

SENIOR MANAGER
  • أغسطس 2004 إلى يونيو 2006

Reported to the SVP - Projects. Identified as a high-performer and pacesetter in the company, selected for fast-track career progression to strategic management level. Promoted as Deputy General Manager in a short duration as reward for extraordinary project delivery engaging 3 execution centres, risk/interface management amongst JV partners, contract handling, meeting all KPIs/milestones, customer satisfaction, budgets, engineering & procurement, site support.
•Thorough performance evaluation, talent management, employee development, organisational effectiveness at HVEC.
Project Manager - project management, project engineering, profit & loss of LNG Regas Terminals & Offshore FPSO:

PROJECT MANAGER في Chemtex Consulting of India (P) Ltd
  • الهند
  • أبريل 2004 إلى أغسطس 2004

Reporting to Project Director, responsible for EPCM project engineering & management, and P&L of an 18k TPA acrylic fibre project (USD 200 m) for Alexandria Fiber Co., Egypt. Motivated the team to progress from 0.3% to 28% in 4m.
•Project MH 85000 for Engineering & Procurement; plus 25 man-months for construction supervision.
•Reviewed scope, managed resources (35+ staff), implemented 3D PDMS, project WBS, EVMS, QMS, HAZOPs etc

SENIOR PROJECT MANAGER في Rawwater Engineering Company Ltd
  • بريطانيا العظمى
  • أغسطس 2002 إلى نوفمبر 2003

SME, oil & gas consultancy)
Reporting to the COO, responsible for project planning & management of technology related and bespoke projects (ca. £75k-150k) for O&G clients, liaising with clients/companies/consultants, proposals/invoicing/payments/administration.
•Managed technological project for DTI, UK/Shell - “Deep oil well Expanding metal alloy plug” - proof of concept.
•Developed skills in NPD, IP search, IP issues, Value creation, timely data delivery, quality report writing, etc.

PRINCIPAL ENGINEER في PIPING
  • الهند
  • أغسطس 1997 إلى أغسطس 2002

Responsible for project engineering & management in piping, concept studies, detail/field engineering, construction.
•Lead Engineer of portfolio of 14 brownfield/greenfield Petrochemicals/Chemicals/O&G/Fertilisers projects spread worldwide (5-50 staff, $5m-$800m, pre-FEED, FEED, EPC/LSTK/FPLS/Reimbursable, proposals) many with overlapping schedules; handled project kick-offs, estimates, engineering, specifications, layout, 3D modelling, Isos, MTOs, design reviews. Site fabrication, execution support. As departmental auditor improved quality.
•Executed projects from Europe to SE Asia for clients - Radici Germany (Adipic Acid), QP, QAPCO, QAFCO, GNFC (Weak & Concentrated Nitric Acid), Sasol, Asean Bintulu (Ammonia/Urea) etc.

ENGINEER / PROJECT ENGINEER في SR
  • المملكة العربية السعودية
  • أبريل 1988 إلى أغسطس 1997

(Operator).
At IPCL-MGCC (ca.$1.5bn) involved in PMC, construction & commissioning of a mega greenfield Gas Cracker/ petrochemicals facility, focal point in Technical Services Department for project engineering & management including PMC, O&M, concept to commissioning of all revamps/modifications, de-bottlenecking in the COMAH like operating facilities (incl. gas cracker/polymers) of the petrochemicals complex for improving operability, safety and maintainability.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Mechanical Engineering
  • في Eni Corporate University
  • يناير 2012

Suite of site specific trainings, Pearl GTL Project, Qatar

الثانوية العامة أو ما يعادلها, Mechanical Engineering
  • في Indian Institute of TechnologyIIT
  • يناير 1995

courses: Piping Engineering

ماجستير, Mechanical Engineering
  • في University of Mysore
  • يناير 1986

Oil & Gas Management), UPES, India (CGPA: 3.41/4)

بكالوريوس, Mechanical Engineering
  • في University of Mysore
  • يناير 1986

Oil & Gas Management), UPES, India (CGPA: 3.41/4)

Specialties & Skills

Mechanical Maintenance
Project Management
Project Engineering
Engineering
COMPUTER ASSOCIATES PACKAGES
CONCEPT DEVELOPMENT
CUSTOMER RELATIONS
MACROMEDIA DIRECTOR
OIL PAINTING
PROJECT MANAGEMENT
PROPOSAL WRITING
QUALITY

اللغات

الانجليزية
متمرّس
الفرنسية
متمرّس
الالمانية
متمرّس
الايطالية
متمرّس