RAYEES MOIDEEN, Electrical Engineer

RAYEES MOIDEEN

Electrical Engineer

EJADAH ASSET MANAGEMETNT GROUP

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, Electrical Engineering
Expérience
35 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :35 years, 11 Mois

Electrical Engineer à EJADAH ASSET MANAGEMETNT GROUP
  • Émirats Arabes Unis - Abu Dhabi
  • Je travaille ici depuis novembre 2018

An Electrical Engineer with new experience in Facility Maintenance Management in ADNOC(Abu Dhabi National Oil Company) New Head Quarter to ensure all Electrical Power Systems are working at their optimal capacity and effective implementation of best practice engineering services systems in managing, planning & execution, coordination with various entities for smooth conduct of operations.

Project Manager/ Project Engineer/Site Manager/ Senior Electrical Engineer/ Site Electrical Engineer à M/s Arabian BEMCO Contracting Co. Ltd (Previously known as SAUDI BINLADIN GROUP- IPP)
  • Arabie Saoudite - Jeddah
  • novembre 1996 à octobre 2017

*PROJECT & SITE MANAGEMENT
Client’s basic requirements, general guidelines and Site Meetings. Pre-qualification for sub-contracting works. Planning as per Project Mile Stone requirements for design phase, Site delivery of equipment, Site mobilization, Site construction, Testing & commissioning, Punch list, O &M Manuals, As Built Drawings, Spare Parts & Cataloging system, Final project completion.
* FIELD SUPERVISION
I - Power Plants (Gas Turbine Generators)
Riview the approved drawings, follow-up for non-delivered construction materials/ equipment inspection upon arrival and delivered materials are as per approved submittals. Control and follow-up for scheduling construction activities, Implementation and execution of Electrical Duct banks, Power plant Auxiliaries, All building utilities and clearing Inspection by the consultant as per the approved construction drawing. All electrical works and equipment in & Generator, Turbine, Fuel Management, Fuel Treatment Plant, etc. for Main Plant Area and Balance of Plant works. 380KV & 132kV GIS extension & protection, control and relay panels. Preparation of a complete requirements and coordination with start-up team for energization of 132kV Generator Step-up Transformer, First firing and Synchronization of Gas Turbine Generators.
II. 132/33/13.8KV HV Substations
Erection involving positioning, final alignment, assembly and final installation of the following electrical equipment and facilities.
132KV Conventional Outdoor Switchgear with Dead tank Circuit Breakers, Disconnect and Earthling Switches, CTs, Bus VT’s and Auxiliaries, 132/33KV, 133MVA and 132/13.8KV, 60MVA Power Transformers, 33KV and 13.8KV, Indoor type Metal clad Switchgears, I25V DC Batteries, Battery Chargers, Inverters and DC Distribution Boards, 33KV/220V Station Auxiliary Transformers, Lighting, Fire alarm and Fire detection, Lightning Protection and Grounding works, Protection, Control and Metering System and Interfacing and Modification works.

Executive Engineer (Electrical), 1992-1996 and Scientific Officer –SO/SC( Electrical) , 1989-1992, à M/s Nuclear Power Corporation
  • Inde
  • janvier 1989 à octobre 1996

*Supervision of installation, testing and commissioning coordination including power and control cabling of following Station Auxiliary System.
- 220/6.9KV, 35MVA ONAN Start-Up Transformers.
- CL. III & CL. IV 6.9KV Switchgears and Associated Bus ducts.
- CL. II Motor Control Centers and CL.I DC Distribution and Power Batteries
- Permanent Lighting and receptacle system and Cable tray works in Control Building.
- Construction activities of 400kV Outdoor Switchyard works for Main Output System.
- Preparation of Budget estimates, Monthly progress reports pertaining to electrical works and Monitoring of all electrical works.

*Co-ordination with various agencies for electrical clearances during Over Dimensional Nuclear Power Plant Equipment movement.
- Design, cost estimation, tendering and execution of Internal Electrification of Various Public Buildings.
- Operation and Maintenance of 33/11kV Indoor Substation for Construction Power Supply for Nuclear Power Plant.
- Periodic inspection and storage maintenance of 6.6kV HT Motors.

Production Engineer à M/s Electrical Stamping Manufacturing
  • Inde
  • juin 1987 à décembre 1988

Manufacturing, Assembly, Processing and Testing of 220kV Instrument Transformers.

Éducation

Baccalauréat, Electrical Engineering
  • à Aligarh Muslim Univesity
  • juin 1987

Electrical Engineering.

Specialties & Skills

Project Construction Management
ELECTRICAL INSTALLATIONS
INDUSTRIAL PROJECTS
Client coordination, Design coordination and site coordination from kick-off till handing over. Vendor development, procurement, Contract development and administration. Planning, scheduling and controlling of project. Performance monitoring and optimizing resource utilization. Adapting and implementing measures for maintaining and meeting the time schedule and quality standards
Microsoft Office 2011, Microsoft Outlook Express, Adobe Acrobat DC, Microsoft Projects, Photoshop, Microsoft Office Document Imaging, Microsoft Office Document Scanning, Font Page.

Langues

Anglais
Expert
Hindi
Moyen
Arabe
Débutant
Malayala
Expert
Urdu
Moyen

Adhésions

International Association on Electricity Generation, Transmission & Distribution (Afro-Asian Region)
  • Active Member
  • September 1995
Associative Member of Institution of Engineers, India (AMIE)
  • Active Member
  • October 1990
Institute of Electrical and Electronics Engineers(IEEE)
  • Active Member
  • February 2008
Gulf Institute Of Projects
  • Project Management Expert
  • May 2014

Formation et Diplômes

Assembly of 6.6kV, 2800KW Reactor Cooling Pump Motor (Formation)
Institut de formation:
New Government Electric Factory
Date de la formation:
December 1989
Operation and maintenance of Lattice Boom Crawler Crane of 650 tones (Formation)
Institut de formation:
Llieberr-werk
Date de la formation:
December 1991
Basic occupational Health & Safety Training course (OSHA 30 Hrs) (Formation)
Institut de formation:
Arabian Bemco Training by HSE Deptt.
Date de la formation:
April 2009
Under-graduate Training- Various electrical systems (Formation)
Institut de formation:
Hariduaganj Thermal Power Station
Date de la formation:
June 1986
Permit To Work /Lock Out Tag Out procedure (Formation)
Institut de formation:
Saudi Electrcity Company, Training Center
Date de la formation:
December 2012
Erection and pre-commissioning of various electrical system (Formation)
Institut de formation:
Kakrapara Atomic Power Station
Date de la formation:
March 1991