Work Experience

Total years of experience :13 years, 3 Months

LEAD ENGINEER ELECTRICAL at SEMBCORP SALALAH O&M SERVICES COMPANY
  • Oman - Salalah
  • April 2005 to September 2015

Location: TECHNICAL SERVICES DEPARTMENT

Sr. ELECTRICAL ENGINEER at ARABIAN BEMCO CONTRACTING CO. LTD
  • September 2012 to September 2012

(from Current to First) 10.5 Years (3Years Domestic, 7.5 Overseas Experience)
3.1 Company Name: ARABIAN BEMCO CONTRACTING CO. LTD.
Location: SAUDI ARABIA
Position: Sr. ELECTRICAL ENGINEER
From/To: APRIL 2008 TO TILL DATE
Major Field: T&C of Power Plants & EHV Substations

at DAMMAM KSA
  • January 2005 to September 2012

Location: DAMMAM KSA

Contractor/Proj at BEMCO SERVICES CO. LTD
  • March 2012 to June 2012

5. Projects Experience BEMCO SERVICES CO. LTD., JEDDAH KSA
5.1 Project Name: POWER PLANT 10, BLOCK C1, S/S 9023, BAY8.
Location: RIYADH KSA
Working Period: 10 MAR 2012 TO 6 June 2012.
Contractor/Proj. Owner ARABIAN BEMCO
Responsibilities:
Lead Testing & Commissioning Engineer for K24, BAY8, 37 & 39 GSUT's, New 380 KV Cable, GIB & CBF Protection Panels Installed in S/S 9023. (7 Protection Panels at S/S End & 4 Panels at PP10 End)
* Preparation of interfaces for Cable, GIB & CBF Protection Panels with Existing LCC, Control, SCADA, SOE & FR Panels.
* Modifications of RTK Annunciation Unit, LCC Panel, CBF & BB Looping.
* Preparation of all external wiring schedules
* Preparation of Testing Schedule
* Following Main Relay Testing: * ABB RED 670 for 87C1 & 87C2 as SET-1 Protection
* Micom P546 for 87C1 & 87C2 as SET-2 Protection
* SEL2440, GE C30 for Inter Tripping b/w S/S & PP10
* MFAC14 for 87GIB-1 SET-1 Protection
* Micom P141 CT Supervision Function
* SIEMENS 7SJ64 87GIB-2 SET-2 Protection
* SIEMENS 7SG11 CBF-1 Protection Relay
* ABB REF615 CBF-2 Protection Relay
* Primary & Secondary Injection Tests
* Overall Scheme Checks including SCADA Alarms, Indications & Commands.
* End to End Test
* Stability, Sensitivity, REF, Inter locks, Inter Trip & Block Closing.
* Energization & Online Measurements.

Contractor/Proj at KV SUBSTATION
  • December 2011 to March 2012

5.2 Project Name: HITTEEN BSP 9005, 380/132/13.8 KV SUBSTATION
Location: RIYADH KSA
Working Period: 6 DEC 2011 TO MAR 2012
Contractor/Proj. Owner AL-OJAIMI/ALFANAR/SEC-COA
Responsibilities:
Worked as Lead Testing & Commissioning Engineer for Feeder8097A
* Responsible for S/S Testing & Commissioning Activities both internal & with SEC Witnesses
* Overall Scheme & Functional checks with required Protection Modifications including CBF & BB Protection Loops.
* Testing of Line Differential Relay (7SD522) Set-1
* Testing of Line Distance Relay (REL670) Set-2
* Scheme Communication with Remote Ends
* Testing of SCADA System Alarms, Commands & Back indications from LCC, Prot: Panels & Control Panels
* End To End Test, Energization & On Load Measurements
* Dealings with Client and End Client
5.4 Project Name: RIYADH POWER PLANT- 10
Location: RIYADH KSA

Contractor/Proj. Owner at ARABIAN BEMCO CONTRACTING CO
  • India
  • September 2010 to April 2011

Working Period: SEP 2010 TO APRIL 2011
Contractor/Proj. Owner ARABIAN BEMCO CONTRACTING CO/ SEC-COA
Responsibilities:
Testing & Commissioning Engineer
Block A1 & B1
* 13.8kV Station Service SWGR (39 Bays including 2 I/C's, 1 Black Start Diesel Generator, 2 B/C's & 2 Zigzag XFMR's)
- Secondary Injection Test of Bus Bar Protection Relays SEL 587Z
- Secondary Injection Test of O/C & E/F Protection Relay SEL 551
- Secondary Injection Test of G/F Relay GE Multilin MII
- Scheme and Function Checks
- Primary Injection, Busbar Stability and Sensitivity Test
- Energization and Online Readings.
- Commissioning of all Outgoing Feeders
* First Energization of 480V AC MCC's A &B (GE Make) for Generator Applications (2x16 No's)
* First Energization of 480V AC Crude Oil Heater MCC's (Heat EX Made) (2x8No's)
* Testing & Commissioning of Crude & Diesel Forwarding MCC's (ABB Made) 3No's.
* Testing & Commissioning of Fire Pump House 1&2 (4.16kV 2x600 HP Motor) (Reliance USA)
* Inter Trip Test, Stability & Sensitivity Tests between S/S 9023 & RPP10, 380kV GSU's (4 Bays for A1 & B1)
RPP10 Block A2 & B2: Performed the Secondary Injection Tests for GE Multilin UR Series Numerical Relays for Generator & Transformer Protection;
* Testing of G60 Generator Protection Relay
* Testing of T60 & T35 Transformer Protection Relay
* Testing of C60 Feeder Protection Relay
* Nexus1250 Metering Unit.
* Wiring, Scheme Checks & Interlock/Inter Trip Test from GPP to Substation 9023.

Contractor/Proj at JUHAIMAH GAS PLANT
  • March 2010 to May 2010

5.6 Project Name: JUHAIMAH GAS PLANT
Location: JUHAIMAH, RAS TANURAH KSA
Working Period: MAR 2010 TO MAY 2010
Contractor/Proj. Owner ARABAIN BEMCO CONTRACTING CO/SAUDI ARAMCO
Responsibilities:
Lead T & C Engineer
testing & Commissioning activities related to Jouhaimah Gas Plant Waste Water Project under Arabian Bemco.
* Testing of GE Made VFD's for Motors
* Primary and Secondary Injection Tests for Main MCC's indoor Type (GE Made.)
* Hi Pot Test & Meggering
* Replacement & Testing of CT
* Power & Distribution Transformers Testing.
* Testing of Switch Rack, Outdoor Type (REMAL Made)

Contractor/Proj at POWER PLANT
  • Pakistan
  • January 2009 to March 2010

(from Current to First) 10.5 Years (3Years Domestic, 7.5 Overseas Experience)
3.1 Company Name: ARABIAN BEMCO CONTRACTING CO. LTD.
Location: SAUDI ARABIA

at AL-JOUF KSA
  • January 2005 to January 2010

Location: AL-JOUF KSA

Contractor/Proj at FUJAIRAH POWER PLANT
  • May 2008 to December 2009

5.8 Project Name: FUJAIRAH POWER PLANT
Location: FUJAIRAH U.A.E
Working Period: MAY 2008 TO DEC 2009
Contractor/Proj. Owner ARABIAN BEMCO CONTRACTING CO/SEMBCORP UAE
Responsibilities:
Was leading and holding Testing & commissioning activities for 250MW Fujairah Power Plant extension project under Arabian Bemco for EMIRATES SEMBCORP, Fujairah UAE.
* Pre-Commissioning & Commissioning of ABB MV switchgear system, type UniGear using REF542Plus Relay.
* Commissioning of LV General & Essential Buses EMS made (Siemens Protection)
* Commissioning of UPS & DC system. (JEMA SPIAN)
* Pre-Commissioning & Commissioning of GCB (MB100 ABB.)
* Commissioning checks for 400 kV line Protection Panels Using GE Multilin.
* Commissioning of Main & Aux: Transformer.
* DCS Interface and functional checks.

Projects Experience (Under) JAL INTERNATIONAL CO. LTD AL-KHOBAR KSA
5.9 Project Name: RIYADH POWER PLANT- 9 (SUBSTATION 9009)
Location: RIYADH KSA

ELECTRICAL ENGINEER at JAL INTERNATIONAL CO
  • April 2005 to March 2008

3.2 Company Name: JAL INTERNATIONAL CO.
Location: SAUDI ARABIA
Position: ELECTRICAL ENGINEER
From/To: APRIL 2005 TO MARCH 2008
Major Field: T&C HV/EHV Substations

Contractor/Proj at ARABIAN BEMCO CONTRACTING CO
  • March 2007 to February 2008

Working Period: MAR 2007 TO FEB 2008
Contractor/Proj. ARABIAN BEMCO CONTRACTING CO/ SEC-COA
Responsibilities:
Testing & Commissioning Engineer
Block C, D & F SEC: PP9, RIYADH under ARABIAN BEMCO.
Job Responsibilities in 380 kV Existing 9009 S/S PP9.
➢ Modification of existing 380kV GIS, LCC panels and interface with Protection panels (6 Bays)
➢ Testing of main & auxiliary relays for new 380 kV Bus Duct protection panels by ABB.
➢ Components checks for new control panels and interfacing with existing LCC's, Protection panels & SCADA panels.
➢ Testing of BCT's, CT's, and VT's.
➢ Complete Scheme /functional checks for 380 kV Bus Duct Protecting, Control, and LCC & SCADA.
➢ Implementation of final settings on the relays & Inter Trip Test.
➢ Commission tests like Secondary injection, primary injection & stability/sensitivity Test for Bus Duct Differential protection.
➢ Complete pre-commissioning & commissioning tests for "Block F" 12 GT'sincluding 13.8 kV switchgear & 380 kV GIB's.
5.10 Project Name: SEC MDNOD-EOA 4TH AREA MAINTENANCE PROJECT

Contractor/Proj. Owner at JAL INTERNATIONAL CO
  • June 2006 to March 2007

Working Period: JUN 2006 TO MAR 2007
Contractor/Proj. Owner JAL INTERNATIONAL CO/SEC-EOA 4TH AREA
Responsibilities:
Lead Testing & Commissioning Engineer
Replacement of old protection (ENERTECH Relays with SIEMENS & MICOM Relays) For AR'AR P/P, QARAH, ABUAJRAM & ZALOOM S/S, under SEC Maintenance Project for SEC-EOA, KSA.
* Testing of Micom P120, P122, P123 & P142 Relays
* Testing of Siemens 7UT612 Relay
* Protection Modifications including Replacement of CT's and Relays
* Testing of Distance Protection Relay Micom Micromoh.
5.11 Project Name: 230 KV/69KV/13.8 KV SENNAYAH BSP

Contractor/Proj at JAL INT'L
  • April 2006 to June 2006

Working Period: APRIL 2006 TO JUN 2006
Contractor/Proj. Owner SSEM/JAL INT'L /SEC-EOA
Responsibilities:
T & C ENGINEER
* Worked asaT&C Engineer in ABQ 49, remote station for the Power Transmission Lines from 230 KV Sennayah BSP. Testing includes Distance Protection, Auto-Reclosure Protection and all associated Functional Checking.
* Testing of Siemens 7SA522 V 4.3 Distance Relays (21 Function) including all the features of Zone protection, Teleportation, Switch Onto Fault, Power Swing detection, DEF and associated Schemes, Backup 50/51 function Protection & STUB protection.
* Testing of Siemens 7VK61 Auto-Reclosure Relays (79 Function) including all the features of Synchronism check, Manual Breaker closing, with AR closing, Dead bus Live line & Live bus dead line schemes used for 1-1/2 breaker scheme in ABQ 49.

Contractor/Proj at JAL INT'L
  • March 2006 to April 2006

Working Period: MAR 2006 TO APRIL 2006
Contractor/Proj. Owner SSEM/JAL INT'L /SEC-EOA
Responsibilities:
T & C ENGINEER
* Overall Scheme & Functional checks with required Protection Modifications of Protection System
* Testing of Line Differential Relay (7SD522)
* Scheme Communication with Remote Ends
* Secondary Injection Tests for CT and VT CKTs
* End to End Test
* Energization & On Load Measurements
5.14 Project Name: 230KV/69KV/13.8KV ABQIQ 49 S/S
Location: ABQIQ KSA

Contractor/Proj at JAL INT'L
  • January 2006 to March 2006

Working Period: JAN2006 TO MAR2006
Contractor/Proj. Owner SSEM/JAL INT'L /SEC-EOA
Responsibilities:
T & C ENGINEER
* Overall Scheme & Functional checks with required Protection Modifications of Protection System
* Testing of Line Differential Relay (7SD522)
* Scheme Communication with Remote Ends
* Secondary Injection Tests for CT and VT CKTs
* End to End Test
* Energization & On Load Measurements
5.13 Project Name: 69KV/13.8KV DIE-2 S/S REMOTE END TO SENNAYAH BSP
Location: DAMMAM KSA

Contractor/Proj at JAL INT'L
  • April 2005 to January 2006

Working Period: APRIL 2005 TO JAN 2006
Contractor/Proj. Owner SSEM/JAL INT'L /SEC-EOA
Responsibilities:
T & C ENGINEER
* Functional Test of HITACHI 230KV & 69KV GIS through Local, Mosaic Mimic Control Panel & SCADA. Also verified all the interfacing & interlocking of the schemes for the operation of Circuit Breakers & Isolators.
* Testing of 7UT513 Siemens Transformer Differential Relay for all 230 KV & 69 KV Transformers including (Function 87) Differential testing with various KvG Factors, Harmonics Restraint X-istics, Slope X-istics, Over current back up protection & all associated checks required by SEC witness.
* Testing of Alstom MICOM P142 over Current Relay includes function 50N/51N, 50/51, 50HS, 51HS, 67, 67 N, VTS Block function, fuse failure protection and frequency protection. Hands on experience of Alstom Relay Logic Software (PSL) for the marshalling of LED's, Binary Inputs & Binary Outputs.
* Testing of ALSTOM MICOM P125 Neutral over Current Relay as a backup for transformer panels. Done the successful testing of 5 No. Relays in the SEC witness presence and tested all functions 67N, Wattmetric Protection & Residual Voltage Protection.
* Acceptance test for BCT's, GIS CT's, VT's, CCVT's.
* Testing/calibration of transducers, V, A, W & VAR meters.
5.12 Project Name: 69KV/13.8KV DIE-1 S/S REMOTE END TO SENNAYAH BSP

SUB-ENGINEER at PAKISTAN WAPDA HV & SC
  • Pakistan
  • July 2002 to April 2005

3.3 Company Name: PAKISTAN WAPDA HV & SC LAB
Location: RAWAT, ISLAMABAD
Position: SUB-ENGINEER
From/To: JULY 2002 TO APRIL 2005
Major Field: Specialized Test Lab for Power Equipments
3.3 Current Position Testing & Commissioning Manager (Acting), Riyadh Power Plant 10
4.
Detail Job/Skill Description:
Specialist in Power System Protection, Control, Fault Analyses, O&M, Testing & Commissioning of Advanced Numerical Relays used for LV/MV/HV/EHV Power System Protection such as SIEMENS, ABB, GE Multilin, AREVA Micom, SEL & Schneider SEPAM.
* Knowledge of Engineering drawings & Various Schemes for Power Plants & Substations.
* Knowledge of Advanced Numerical, IED's, Electromechanical & other Conventional type of Relays coordination studies.
* Deep knowledge of various protection schemes used in Power Plants & HV/EHV Substations.
* Experience of Fault Analyses, Troubleshooting & Report writing.

Sub Engineer at HV & SC LAB WAPDA, RAWAT
  • Pakistan
  • July 2002 to April 2005

5.15 Project Name: HV & SC LAB WAPDA, RAWAT, ISLAMABAD PAKISTAN.
Location: ISLAMABAD, PAKISTAN
Working Period: JULY 2002 TO APRIL 2005
OWNER: WAPDA PAKISTAN
Responsibilities:
Sub Engineer
* All kinds of Type and Routine Test on Power Transformers/Distribution Transformers.
* Type Tests & Routine tests on Current Transformers & Potential Transformers.
* Testing of vacuum circuit breakers.
* High voltage & High Current with Stand Test on Power Equipments.
* PD Test on Cables, Transformers, CTs, PTs etc.
* Short Circuits Test for Power & Distribution T/F's, Drop Out /Cut Out.
* Power Arc Test on Insulation Disks.
* Energy Meters Testing.
* Results Evaluation and Report Writing for Tested Electrical Power Equipments.

Sr. ELECTRICAL ENGINEER at 380KV Bus
  • India
  • to

Position: Sr. ELECTRICAL ENGINEER
From/To: APRIL 2008 TO TILL DATE
Major Field: T&C of Power Plants & EHV Substations
3.2 Company Name: JAL INTERNATIONAL CO.
Location: SAUDI ARABIA
Position: ELECTRICAL ENGINEER
From/To: APRIL 2005 TO MARCH 2008
Major Field: T&C HV/EHV Substations
3.3 Company Name: PAKISTAN WAPDA HV & SC LAB
Location: RAWAT, ISLAMABAD
Position: SUB-ENGINEER
From/To: JULY 2002 TO APRIL 2005
Major Field: Specialized Test Lab for Power Equipments
3.3 Current Position Testing & Commissioning Manager (Acting), Riyadh Power Plant 10
4.
Detail Job/Skill Description:
Specialist in Power System Protection, Control, Fault Analyses, O&M, Testing & Commissioning of Advanced Numerical Relays used for LV/MV/HV/EHV Power System Protection such as SIEMENS, ABB, GE Multilin, AREVA Micom, SEL & Schneider SEPAM.
* Knowledge of Engineering drawings & Various Schemes for Power Plants & Substations.
* Knowledge of Advanced Numerical, IED's, Electromechanical & other Conventional type of Relays coordination studies.
* Deep knowledge of various protection schemes used in Power Plants & HV/EHV Substations.
* Experience of Fault Analyses, Troubleshooting & Report writing.

5. Projects Experience BEMCO SERVICES CO. LTD., JEDDAH KSA
5.1 Project Name: POWER PLANT 10, BLOCK C1, S/S 9023, BAY8.
Location: RIYADH KSA
Working Period: 10 MAR 2012 TO 6 June 2012.
Contractor/Proj. Owner ARABIAN BEMCO
Responsibilities:
Lead Testing & Commissioning Engineer for K24, BAY8, 37 & 39 GSUT's, New 380 KV Cable, GIB & CBF Protection Panels Installed in S/S 9023. (7 Protection Panels at S/S End & 4 Panels at PP10 End)
* Preparation of interfaces for Cable, GIB & CBF Protection Panels with Existing LCC, Control, SCADA, SOE & FR Panels.
* Modifications of RTK Annunciation Unit, LCC Panel, CBF & BB Looping.
* Preparation of all external wiring schedules
* Preparation of Testing Schedule
* Following Main Relay Testing: * ABB RED 670 for 87C1 & 87C2 as SET-1 Protection
* Micom P546 for 87C1 & 87C2 as SET-2 Protection
* SEL2440, GE C30 for Inter Tripping b/w S/S & PP10
* MFAC14 for 87GIB-1 SET-1 Protection
* Micom P141 CT Supervision Function
* SIEMENS 7SJ64 87GIB-2 SET-2 Protection
* SIEMENS 7SG11 CBF-1 Protection Relay
* ABB REF615 CBF-2 Protection Relay
* Primary & Secondary Injection Tests
* Overall Scheme Checks including SCADA Alarms, Indications & Commands.
* End to End Test
* Stability, Sensitivity, REF, Inter locks, Inter Trip & Block Closing.
* Energization & Online Measurements.

5.2 Project Name: HITTEEN BSP 9005, 380/132/13.8 KV SUBSTATION
Location: RIYADH KSA
Working Period: 6 DEC 2011 TO MAR 2012
Contractor/Proj. Owner AL-OJAIMI/ALFANAR/SEC-COA
Responsibilities:
Worked as Lead Testing & Commissioning Engineer for Feeder8097A
* Responsible for S/S Testing & Commissioning Activities both internal & with SEC Witnesses
* Overall Scheme & Functional checks with required Protection Modifications including CBF & BB Protection Loops.
* Testing of Line Differential Relay (7SD522) Set-1
* Testing of Line Distance Relay (REL670) Set-2
* Scheme Communication with Remote Ends
* Testing of SCADA System Alarms, Commands & Back indications from LCC, Prot: Panels & Control Panels
* End To End Test, Energization & On Load Measurements
* Dealings with Client and End Client

5.3 Project Name: KING SAUD GIRLS UNIVERSITY KSGU
Location: RIYADH KSA
Working Period: APRIL 2011 TO NOV 2011
Contractor/Project. SCHNEIDER ELECTRIC/SBG
Responsibilities:
Worked as Lead T & C Engineer
* Testing of SEPAM S40 Numerical Relays (90 No's)
* Testing of Double Ended S/S, 13.8KV Type MCSET Schneider Made (2x14 No's) with all Components i.e. SEPAM S40, CT's, VT's, BB, Scheme Checks & Interlock Checks.
* Testing of ATS Systems, 13.8KV Type MCSET Schneider Made (3x22 No's)
* Testing of 4.16KV SM6 Systems with SEPAM S40 & S80 Relays.
* Testing of Power Transformers 13.8KV/4.16KV & 13.8KV/0.480KV.
* Testing of BLOCKSETS.
* Energization of MCSETS, SM6, XFMR'S & BLOKSETS.

5.4 Project Name: RIYADH POWER PLANT- 10
Location: RIYADH KSA
Working Period: SEP 2010 TO APRIL 2011
Contractor/Proj. Owner ARABIAN BEMCO CONTRACTING CO/ SEC-COA
Responsibilities:
Testing & Commissioning Engineer
Block A1 & B1
* 13.8kV Station Service SWGR (39 Bays including 2 I/C's, 1 Black Start Diesel Generator, 2 B/C's & 2 Zigzag XFMR's)
- Secondary Injection Test of Bus Bar Protection Relays SEL 587Z
- Secondary Injection Test of O/C & E/F Protection Relay SEL 551
- Secondary Injection Test of G/F Relay GE Multilin MII
- Scheme and Function Checks
- Primary Injection, Busbar Stability and Sensitivity Test
- Energization and Online Readings.
- Commissioning of all Outgoing Feeders
* First Energization of 480V AC MCC's A &B (GE Make) for Generator Applications (2x16 No's)
* First Energization of 480V AC Crude Oil Heater MCC's (Heat EX Made) (2x8No's)
* Testing & Commissioning of Crude & Diesel Forwarding MCC's (ABB Made) 3No's.
* Testing & Commissioning of Fire Pump House 1&2 (4.16kV 2x600 HP Motor) (Reliance USA)
* Inter Trip Test, Stability & Sensitivity Tests between S/S 9023 & RPP10, 380kV GSU's (4 Bays for A1 & B1)
RPP10 Block A2 & B2: Performed the Secondary Injection Tests for GE Multilin UR Series Numerical Relays for Generator & Transformer Protection;
* Testing of G60 Generator Protection Relay
* Testing of T60 & T35 Transformer Protection Relay
* Testing of C60 Feeder Protection Relay
* Nexus1250 Metering Unit.
* Wiring, Scheme Checks & Interlock/Inter Trip Test from GPP to Substation 9023.

5.5 Project Name: KING ABDULLAH UNIVERSITY OF SCIENCE & TECHNOLOGY
Location: TAWAL, JEDDAH KSA
Working Period: MAY 2010 TO SEP 2010
Contractor/Proj. Owner VISION SBG/SAUDI ARAMCO
Responsibilities:
Lead T & C Engineer
Testing & commissioning activities of KAUST ARAMCO Project
Zone E1, E2, D1, D2 & South Marine Area's
* Power & Main Distribution Transformers/ Panel Boards (ABB & GE)
* Area Lightning Panel Boards (ABB, GE & Alfanar)
* Tripping Test by Primary and Secondary Injections up to 3000 A Main Breakers.

5.6 Project Name: JUHAIMAH GAS PLANT
Location: JUHAIMAH, RAS TANURAH KSA
Working Period: MAR 2010 TO MAY 2010
Contractor/Proj. Owner ARABAIN BEMCO CONTRACTING CO/SAUDI ARAMCO
Responsibilities:
Lead T & C Engineer
testing & Commissioning activities related to Jouhaimah Gas Plant Waste Water Project under Arabian Bemco.
* Testing of GE Made VFD's for Motors
* Primary and Secondary Injection Tests for Main MCC's indoor Type (GE Made.)
* Hi Pot Test & Meggering
* Replacement & Testing of CT
* Power & Distribution Transformers Testing.
* Testing of Switch Rack, Outdoor Type (REMAL Made)

5.7 Project Name: POWER PLANT- 9 RIYADH
Location: RIYADH KSA
Working Period: JAN 2009 TO MAR 2010
Contractor/Proj. Owner ARABIAN BEMCO CONTRACTING CO/ SEC-COA
Responsibilities:
T & C Engineer Punch list works at SS 9009
* Clearing Snags Related to SS 9009, 380KV Bus duct Feeders for Block C, D & F PP9