Renato Ramos, Maintenance Team Leader (Mechanical)

Renato Ramos

Maintenance Team Leader (Mechanical)

OBEIKAN INVESTMENT GROUP

Lieu
Arabie Saoudite - Riyad
Éducation
Etudes secondaires ou équivalent, Industrial Education
Expérience
35 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :35 years, 7 Mois

Maintenance Team Leader (Mechanical) à OBEIKAN INVESTMENT GROUP
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis décembre 2014

Responsible in Corrective and Preventive Maintenance of ROTOMEC Printing Rotogravure
(8 COLORS), COMEXI Flexographic Printing machine (8 COLORS), UTECO / COMEXI NEXUS Lamination MACHINE, COMEXI PROSLIT, TITAN SR8 and JKAMPF Slitting machine. LEMO Bag making machine, GHIOLDI / KIEFEL (Kirion) Blown Film, GHIOLDI / DAVIS STANDARD Cast Line and Rewinder.

1. Carry out troubleshooting of machine operational malfunctions by receiving a work order request from the production team using the BAAN system.
2. After, done the corrective maintenance, inform the Production Supervisor and resume operation.
Once problem verified and confirmed repair is done, the work order request will be signed and close the issue.
3. Perform machine inspection while in operation and non-operation based on the SOP TPM (Total Productive Maintenance) checklist.
Report and record all findings found, then identify minor and major issues.
4. Coordinate the production team and Planned Maintenance (PM) schedule.
Preparation of spare parts is needed before going to execute CBM (Corrective Base Maintenance) and TBM (Time Base Maintenance).
Highlights all finding found and attack then restore machine to basic condition.
5. All accomplished work is required to be encode by a Technician and report to MES (Manufacturing Execution System - individual account)
6. Perform activities and projects required by the system of a company using EFESO TOOLKIT (Efeso Consulting - Obeikan Manufacturing Excellence) like the following belo
a. Breakdown Reduction b. Attacking repeated issues c. Weak component Analysis (WCA) d. RCA - Root Cause Analysis (Fishbone diagram)
7. Perform Mechanical faults in troubleshooting and using circuit diagrams, machine assembly drawing and to restore machine in standard. Modification of assembly if needed to improve and avoid repeated issues. All technical work related to electro pneumatics, hydraulics, disassemble/re-assemble of assemblies & sub-assemblies to maintain in good condition.
8. Prepare and coordinate with the Central Engineering Store for safety stock of common and critical spare parts.
9. Maintain 5’S in workplace, lubrication room, workshop, tools, parts, follow safety procedure and wearing proper PPE.
10. Perform other assigned tasks assigned by the Maintenance Manager.

Maintenance Team Leader à OBEIKAN INVESTMENT GROUP - Flexible Packaging and Film Plant
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis décembre 2014

Responsible to maintain all machines running in good condition to meet the production target and deliver the product on time to the customer.

Achievement: Lessen the machines breakdown time of 50% .

Applied maintenance system and proper procedure in executing Time Base Maintenance(TBM) and Corrective Base Maintenance(CBM) to restore machines in basic condition. Repeated problems are properly analyzed using 5 WHY'S (Root cause analysis or RCA) - Fishbone diagram. Correction of repeated problems fixed in long term conditions (permanent solution applied). This could lead an increase OEE or Overall Equipment Efficiency.

Mechanical Technician à Al Shaq Plastic Industries Company (SAVOLA GROUP)
  • Arabie Saoudite - Riyad
  • avril 2003 à septembre 2014

Responsible in corrective maintenance and preventive maintenance of the following machines:
W&H Blown Line -3 Layers (FFS BAG) and mono, Reifenhauser Blown, Hosokawa Alpine Blown,
Miraflex Flexographic Printing (CI)- 8 Colors, Fischer & Krecke (CI)- 8 Colors, Valmet Rotomec (CI) - 6 Colors, SML Cast line, Recycling machine, LEMO, HUDSON SHARP, GUNTER, Bag making, TITAN and Jkampf slitting machine.


•Receive work order request of all machine fault types and perform corrective maintenance to back machine in operation. Mechanical works related to electro pneumatics, hydraulic, disassemble/re-assemble of assemblies & sub-assemblies to maintain in good condition.
•Perform gearbox changes oil annually or earlier than 12 months and maintain gears and bearings in good running condition.
•Inspect and identify minor and major problems with machines in the future that will cause breakdown. Record and report then execute planned maintenance of critical and major problems restore them in basic condition. Identify spare parts needed and schedule the corrections.
•Inspect the rubber rollers of machines and schedule for rubber re-grinding or re-coating if necessary. Standard +- shore hardness is maintained.
Ex: Haul-off rubber roller, draw roller, central drum nip roll etc.
•Performing proper troubleshooting of any problem regarding electro-pneumatics and hydraulic fault.
•Re-greasing of machine parts to prolong the lifespan of gear, bearings, and other moving parts.
•Calibration of anilox and plate cylinder for Flexograhic printing machine.
•Prepare critical spare parts order for safety stocks to prevent and lessen long breakdown in the future. (Local and International)
•Yearly cleaning of die head, barrel and screw (3 layers), to maintain a good quality of film and prevent the die line.
•Assisted Service Engineer’s on installation / erection and assembly of new machines.
•Perform other tasks by the Maintenance Manager from time to time.

Mechanical Technician à Premiere Creative Packaging Incorporated
  • Philippines - Quezon City
  • octobre 2000 à avril 2003

Industry:
Packaging
Location
Mindanao Ave.Proj.6 Quezon City Philippines
Department:
Maintenance




DUTIES AND RESPONSIBILITIES
1.Responsible in corrective and preventive maintenance of Injection, Blow molding, UV Printing machine.
2. Carry-out repair of sequence malfunction of Blow molding and Injection molding machine.
Perform Preventive Maintenance as scheduled by the production department once it reaches 5000 running hours. Coordination of Production Manager to Maintenance Manager for manpower and scope of work scheduled.
3. Repair of pneumatic air leaks and oil leak of hydraulic system. Re-condition or replacement of defective parts of all actuators, solenoid valves, hydraulic valves etc.
4. Maintaining and conditioning of clamping, calibrating, carriage hydraulic cylinders and replacement of seals.
5. Re-condition and repair of the piston and vane pumps.
6. Cleaning of hydraulic tank and inspection replacement of oil filter.
7. Cleaning of die head, barrel screw and barrel.
8. Replace bearing of gearbox screw.
10. Dry run the machine once completed the PM with the presence of Production Supervisor for verification and acceptance of machine.
11. Once verification and acceptance are done PM documents signed by both section representatives and machines resume into normal operation.

Industrial Electrician à Metro Container Corporation
  • Philippines
  • octobre 1999 à mars 2000

Industry:
Tin can manufacturing
Location
Sto. Rosario St. Mapulang Lupa Valenzuela City Philippines
Department:
Maintenance



DUTIES AND RESPONSIBILITIES:

1. Carry-out troubleshooting and repair of seamer, soundronic, power press, printing machines in a tin can manufacturing.
2. Repair pneumatic and hydraulic systems of machines.
3. Repair of variable planetary gearbox and motor bearing.
4. Perform other tasks assigned by the Maintenance supervisor from time to time.

Maintenance Technician à Alphatech Industries Corporation
  • Philippines - Bulacan
  • août 1997 à juillet 1999

1. Responsible in corrective and preventive maintenance of Blow molding, Vacuum forming, Extrusion, Pelletizer and ancillary equipment’s.
2. Repair and maintaining machines in good running condition.
3. Carry-out repair pneumatic and hydraulic system malfunction.
4. Perform preventive maintenance of all machines as scheduled.
5. Plumbing work, repair, wiring installation of electrical power supply from feeder line to main circuit breaker as well as machine power supply.
6. Installation and wiring repair of all lighting inside the plant and perimeter area.

Weaving Maintenance à Zone Sine Industries Incorporated
  • Taiwan - Taoyuan City
  • juin 1995 à juin 1997

Industry:
Textiles
Location
Chung Li City, Taoyuan Taiwan ROC
Department:
Maintenance

DUTIES AND RESPONSIBILITIES:

1. Warp-out, cleaning and preventive maintenance of water jet weaving machine.
2. Loom set-up and run stabilization, cutting of fabric roll and turnover to quality control section.
3.Loom fixer, carry-out malfunction of leno motion, picking motion, tension, and timing.
4. Repair of main drive gear box and changed oil.

Maintenance Staff à Appliance System Corporation
  • Philippines - Bulacan
  • octobre 1992 à mai 1995

1. Responsible for corrective maintenance of automatic
Spray booth of furnace, ball mill, washing machine and gas
Range conveyor line, pickling and ancillary equipment.
2. Fabrication / plumbing works, electrical repair, wiring
Installation of plant lighting.
3. Cleaning of steam boiler and preventive maintenance of
air compressor.

Weaving Maintenance à Laguna Manufacturing Corporation
  • Philippines - Bulacan
  • novembre 1986 à août 1991

Industry:
Textiles
Location
Pantoc, Meycauayan Bulacan Philippines
Department:
Maintenance

DUTIES AND RESPONSIBILITIES:

1. Loom fixer - correction of machine timing and mechanicalal problemechanical problem.
2. Preventive maintenance - restore machine in good
Running-condition
3. Machine setter - machine warp out, set up and
stabilization run.

Éducation

Etudes secondaires ou équivalent, Industrial Education
  • à Marikina Institute of Science and Technology
  • mars 1986

Specialties & Skills

Training and Development
Computer Skills
Oral Communications
Written Skills
Technical Skills
FILM PRODUCTION
MECHANICAL
CALIBRATION
MICROSOFT WORKS
OIL PAINTING
QUALITY
ENGINEERING
COREL DRAW

Langues

Anglais
Moyen
Arabe
Moyen

Formation et Diplômes

Electro Pneumatics (Formation)
Institut de formation:
MFI POLYTECHNIC INSTITUTE
Date de la formation:
April 2019
Durée:
32 heures
Programmable Logic Control (Formation)
Institut de formation:
MFI POLYTECHNIC INSTITUTE
Date de la formation:
May 2019
Durée:
42 heures
Mechatronics Essential (Formation)
Institut de formation:
MFI POLYTECHNIC INSTITUTE
Date de la formation:
May 2019
Durée:
74 heures
Install Mechatronics Device Leading to Mechatronics Servicing (Formation)
Institut de formation:
MFI FOUNDATION INSTITUTE
Date de la formation:
February 2017
Durée:
56 heures
Electrical Control wiring installer and troubleshooter (Formation)
Institut de formation:
Meralco Foundation Institute
Date de la formation:
September 2002
Durée:
48 heures

Loisirs

  • Reading and watching on YouTube about technical learning.
    None