REYNALDO GARCIA, QA/QC Civil Engineer/INSPECTOR

REYNALDO GARCIA

QA/QC Civil Engineer/INSPECTOR

Saudi Engineering Group International (SEGI Consulting)

Lieu
Philippines
Éducation
Baccalauréat, Civil Engineering
Expérience
18 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 9 Mois

QA/QC Civil Engineer/INSPECTOR à Saudi Engineering Group International (SEGI Consulting)
  • Arabie Saoudite - Dammam
  • juillet 2015 à novembre 2018

SEC formerly SCECO
Project Handled:
•380 KV D/C OHTL from JIZAN JRPP to Muhayel West BSP/Madhayah BSP B/W JAZAN REFINERY PP KUDMI BSP/ JEC-JRP to ABHA East KV BSP and SUBSTATION S/S (Completed)
•TABUK 380Kv/132Kv/33Kv BSP
•DUBA Green Power Plant Project
•AL-Wajh 380Kv/132Kv/33Kv and 13.8Kv BSP/OHTL Umlujj

□REVIEW Quality Plan, Inspection Test Plan, Method Statement, Material Technical for approval/Material Inspection Report (RFI) and Specification/codes.
□Monitoring and Administering the QA/QC Plan or Program and ensuring incorporated material on construction project is in compliance with the plans and specifications.
□Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.
□Witness during Soil Investigation/Drilling with sample taken, access road, structure pad, drilling foundation up to concreting 1st stage and 2nd stages (re-bars, formworks of Leg foundation on Tower Structure alignment/grounding cable of electrical up to Erection of Tower Structure Inspection/Documentation/Audit and up to hand over completion of project.
□Check the Concrete Design as per client approval, concrete sample cubes for 7 days and 28 days, Temperature of concrete, slump test and attend for compression strength test and documented.
□Assuring the acceptable quality of materials, processes and workmanship in the project work.
□Attend of meeting Construction/QA-QC issue external and internal
□ Carry out inspection and checking for all quality related procedures in the site and ensures activity at site are as per approved method statement and inspection test plan.
□ Coordinate with the Site Consultant’s Representative and Site In-charge Engineer for inspection and meeting about quality problems including issued/ closure of Non-Compliance Report to the Contractor.
□Maintain standards of safety and comply with Company’s Health, Safety and Environment Management System requirements (5-STAR Implementation).
□Check the elevation requirement as per approved drawing for concrete and structure together with survey group.
□Review/check the alignment of steel structure from material handling, sequence for erection procedure, alignment of structure per tolerance, bolting inspection.
□ Check all calibration certificate for all tools/equipment for steel structure and civil.
□Follow and maintain Company standards of Quality in accordance with Company Quality System requirements.

QA/QC Engineer à 2014Gulf Mass Engineering and Construction Ltd. Shaybah
  • Arabie Saoudite
  • octobre 2012 à juillet 2015

PKG#4 IGHC, GOSP-3 / Tower Line Erection -ARAMCO Project
□Ensure construction work is performed and completed in accordance with contract documents.
□Monitor contractor's quality process, and coordinate field sampling and testing for verification of quality results as needed.
□Prepare daily inspection reports, daily construction progress photographs and other quality record as required.
□Observe and document safety performance of the contractor. Include safety observations.
□Assist Resident Engineers and Office Engineer in verification of quantities.
□Planning/Resolve construction issues.
□Assist in the RFI, submittal and change order review processes and review of the contractor's work implementation.
□Maintain field "As Built" Drawing.
□Perform material receiving inspections.
□Ensure that Audit finding are being attended to and help in the closing out process where possible.
□Responsible for Tower erection Inspection for Steel Structure Materials, Alignment survey report inspection/bolt tightening report Inspection including guy wire alignment up to Painting Visual Inspection and SAFETY FIRST always.

QA/QC Engineer à 2005Hyundai Engineering & Construction Co. Ltd
  • Émirats Arabes Unis
  • décembre 2004 à mai 2015

New 132/11 KV Substation S16 & S18, CN#N2106
□Review/Check the Inspection Test Plan (ITP), Project Quality Plan/Quality Procedure, Method Statement, Specification including Approved Drawing for Construction.
□Responsible and witness for inspection of Piling load Test, Excavation, Rebar/Concrete, Backfilling, Soil Compaction Test, Sample taken for 7 days and 28 days cubes, Tensile Test for Rebar, Integrity Test and Material Receiving Inspection with proper document.
□File and kept all inspection document as QA Standard.
□Direct coordinate of Project Consultant/Sub-Contractor about daily Quality status and attend weekly/monthly meeting.
□Follow Safety Rules, always.

QA à 2002Hyundai Engineering & Construction Co. Ltd./Snamproggetti (JV)Ummsaid
  • Qatar
  • juillet 2000 à août 2010

4, EPC Project (QGPC-CONNOCO PHILLIPS)
□Responsible for all QA/QC Civil/Steel Structure Inspection and related activities.
□Check and review the Quality plan, ITP, Method Statement, specification/codes for the proper construction and quality implementation at job site, perform pre-inspection to ensure that all installed materials are with in the standard and approved by client in conformance to applicable drawings and specification.
□Conduct of final inspection with owners representative prior to proceed concrete pouring and other succeeding work activities that requires step by step inspection and testing procedures(ITP).
□Conduct for inspection of Steel Structure from Padding plate leveling/alignment of structure (horizontal and vertical) Grouting up to curing compound method.
□Responsible of Inspection for Compaction test, Backfilling, Formwork/Reinforcement rebar, concreting-sample taken for 7 and 28 days, attend for concrete crushing in laboratory with documented, Building, manholes, catch basin, ditches, asphalt and concrete paving including sewer/drainage system.
□Keep and maintain all document for future purposes.
□Prepare Punch-List through checking and identifying areas requiring modification of additional work and with those in contradiction assist in the resolution.
□Involve also for 21 days Tie-In (SHUT DOWN) in NGL-3 of Package test document preparation / inspection witness and submitted to Client for acceptance.
□Safety first always!

QC à 2010JGC/KBR Joint Venture
  • Qatar
  • septembre 2008 à août 2008

Pearl GTL-3 SHELL/QATAR GAS Project
□Conduct self in appropriate manner as a representative of the owner working effectively in a diverse work environment.
□Review/Check of Inspection Test Plan, Project Quality Plan, Specification, Method Statement including change orders relevant to the tasks to be performed.
□Review and Familiarize all relevant Code requirements and reference standards.
□Monitor/Check Pre-Fabricated Materials from Materials, dimensional, visual checking of welding as per AWS-D1.1 up to painting before erection at site.
□Responsible for Inspection of all related scope on Steel Structure M odule Installation /erection for acceptance.
□Conduct on actual demonstration for Bolts Tensioning Method as per procedure.
□Witness for Inspection from Padding Plate Leveling, Structure Alignment (Horizontal/Vertical) and bolt tightening as per procedure.
□Develop and implement internal quality guideline which include ISO/Establish quality standard, work procedures and their implementation.
□Execution of system Audit are correct (working papers) kept by the auditor procedures applied, test performed, information obtained and pertinent conclusion and the document provides the principal support for the auditor’s report base on the ITP/PROCEDURES/SPECIFICATION and other approved document.
□Strong HSE mindset and join TSTI daily.

à SGS
  • Émirats Arabes Unis
  • à janvier 2008
Structural Engineer à 2004Hyundai Engineering & Construction Co. Ltd. Assaluyah
  • Émirats Arabes Unis
  • février 2003 à juin 2003

IRAN South Pars Gas Field Project, Phase 4&5
□Ensure that the company policies and procedures are maintained and implemented at all times, whilst continuously seeking ways to improve refine and modify procedures.
□Review/Evaluate of Plan drawings with Bill of Materials/Specification and Procedures correspond to the up-dated revisions and changes had been implemented as required to maintain a balance technical consistency against actual work condition.
□Supervise/Monitor of up-dated daily progress report from Fabrication and Site Erection for steel structure.
□Supervise/Inspect of direct work ascertaining proper execution and implementation of work scope is within the acceptable standard engineering procedure Code and Practice also Client Specification.
□Proper Monitoring and attend for inspection from marking layout, cutting, fit-up, full weld and paint for all materials to be released for erection.
□Calculation of total fabricated quantities and preparation of Client Bill as per as-built site condition.
□Coordinate of QA/QC Engineer/Third Party to get approval of materials/works and information given at appropriate time to ensure overall quality of the work by proper planning required testing/inspection requirement.
□Coordinate the workload and distribute the work amongst the workers.
□Supervise the appointed workers (Fabricator, Welders, Riggers, Erectors and Painters) and effectively complete the workload in the allocated time frames.
□In-charge of Steel structure pipe rack materials in the Fabrication.
□Keeping a daily log of all detail work force and material used.
□Participating in Engineers weekly/monthly meetings, preparing points for discussion, following orders and requests for consumables material.
□Submitting weekly and monthly reports.
□Think positively to Safety.

QA à 2012SK ENGINEERING & Construction Co. Ltd.Al-Ruwais
  • Émirats Arabes Unis
  • juillet 2011 à mai 2001

/QC Steel Structure/Material Mech’l. Inspector
EPC # 1, Ruwais Refinery Expansion Project
□Review/Study QA/QC Procedures, Inspection Test Plan (ITP) Quality Plan, Method Statement, Specification and other documents from Client Approved.
□Responsible for Material Releasing Inspection both Steel Structure/Rotating - Static Equipment and proper document required during inspection (RFI).
□Monitor/Conduct Inspection of early completed of Steel Structure and Static works to ensure that the materials and installation are accordance with the approved plan and Specification.
□Full follow-up Inspection and compile up dated daily Inspection record.
□Visual checking on welding for Pre- Fabricated Structures from Fabrication Shop including Painting.
□Proper coordination on Sub-Con/Company about the daily status of quality on site.
□Conduct internal inspection, monitoring and surveillance.
□Prepare NCR/PAR/CAR if needed.
□Attend of QA/QC meeting and other Surveillance from construction group.
□Report to QA/QC Manager and Construction Manager.
□Follow the rules of Company.

QA à 1997Hyundai Engineering & Construction Co.Ltd.Jahra Centre, State of KUWAIT
  • décembre 1996 à décembre 1996

Sabiya Power Plant Station Sea Water Line
Desalination Plant Project (2400 MW)
□Checked/ read of Fabrication/Erection drawing, Inspection Test Plan (ITP)
Quality Plan Procedures, Method Statement and Project Specification.
□Check all calibrated and non-calibrated equipment certificate before start of inspection test
as per procedure.
□Responsible for acceptance for inspection delivery before unloading in lay down yard and
Inspection for alignment (vertical and horizontal) of structure, bolt tightening and grouting on
Base foundation for steel structure including curing method.
□Responsible for painting touch-up damaged made during erection of structure as per
Procedure required.
□Responsible for audit of steel structure document and cross check by client.
□File kept as per QA/QC Standard for document.
□Responsible to ensure all safety requirements and procedures had been securely established
to prevent accident/incident injury and damaged for equipment.

Site Engineer à 1996Saudi Techint Ltd
  • Arabie Saoudite
  • octobre 1995 à mars 1995

SWCC-Yanbu Desalination PIPELINE Plant Project(500 KM-Yanbu to Madinat)
□Review/Evaluate Plan Drawings with Bill of Materials as per specification and procedure correspond to the up-dated revisions and changes had been implemented as required to maintain a balance technical against actual work conditions.
□Supervise and direct works ascertaining proper execution and implementation of scope of work is within the acceptable standard engineering procedure code and practice and to client Specification.
□ Calculation of total fabricated quantities and preparation of Client Bill as per as-built site condition.
□ Conduct of final inspection with owners representative prior to proceed concrete pouring and other succeeding work activities that requires step by step inspection and testing procedures (ITP).
□Coordinate the workload and distribute the work amongst the workers.
□Supervise the appointed workers (Fabricator, Welders, Riggers, Erectors and Painters) and effectively complete the workload in the allocated time frames.
□Keeping a daily log of all detail work force and material used.
□Participating in Engineers weekly/monthly meetings, preparing points for discussion, following orders and requests for consumables material.
□Submitting weekly and monthly reports.
□Think positively to Safety.

Design Draughtsman à 20, 1993John Brown Saudi Arabia Ltd
  • Arabie Saoudite
  • juin 1992 à mars 1992

IBN ZAHR Polypropylene Plant Project
□Calculate excavation tonnage and prepare graphs and fill hauling diagrams for use in earth moving operations.
□Calculate weights, volumes and stress factors and their implication for technical aspects of designs.
□Draft plans and detailed drawings for structures, installation and construction project such as road, sewage disposal systems and dikes, additional foundation pipe supports working from sketches or notes.
□Check/Review of Inspection Test Plan/Quality Plan/Specification/Method Statement and related Standard Procedure approved by client.
□Witness for inspection of all civil activities on site.

Civil Draftsman à 1992M.S. AL- SUWAIDI Est.Rahima-Rastanur
  • Arabie Saoudite
  • janvier 1990 à mars 1990

Samad Housing Proj. & Pipeline Project-ARAMCO
□Manually preparation of complete civil plan of Housing and pipeline support foundation including structural support on pipes.
□Working on the BOQ.
□Assisting in project documentation and project reports.
□Responsible for manpower preparation, equipment, tools and materials use on site.
□Supervise/Monitor of daily progress works and prepares the report for submission.
□Participating in Engineers weekly/monthly meetings, preparing points for discussion, following orders and requests for consumables material and Safety rules implemented always.

Supervisor à 25, 1995Shinwha Engineering & Const. Co.Ltd
  • Émirats Arabes Unis
  • octobre 1994 à

LNG Gas Plant Project
□Read/Review all Civil drawings approved for construction and materials take-off.
□Supervise and direct work ascertaining proper execution and implement as required of maintain a balance technical consistencyagainst actual work condition.
□Responsible for site preparation -survey, excavation, reinforcement, concrete pouring,
Formworks, backfilling and curing system as per client standard.
□ Coordinate the workload and distribute the work amongst the worker.
Monitoring daily work progress percentage and follow to planning schedule charted.
□Responsible for directing, planning, coordinating and budgeting activities related to the civil works.
□Participating in the conceptual development of a construction project and overseeing the scheduling, organizing and implementation is also a part of the job and implement of quality control programs as well.
□Interface and coordinate with various engineering disciplines including vendors/ representatives so as to have positive and constructive work compatibility in fulfilling the
client’s task throughout the project and follow the rules of company.

Éducation

Baccalauréat, Civil Engineering
  • à Feati University
  • avril 1986

Graduated/completed

Specialties & Skills

Civil Works
Documentation
Inspection
BALANCE
CLOSING
CUSTOMER RELATIONS
DELIVERY
DOCUMENTATION
ENGINEERING
GRAPHIC DESIGN
MATERIALS MANAGEMENT
MEETING FACILITATION

Langues

Anglais
Expert

Loisirs

  • mountaineering and planting all plants/wood at farm
    my plants -wood were getting to support on my necessities needs