رينالدو cabralda, Electrical Site Engineer

رينالدو cabralda

Electrical Site Engineer

QD-SBG Construction

البلد
الإمارات العربية المتحدة
التعليم
بكالوريوس, Electrical Engineering
الخبرات
5 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :5 years, 4 أشهر

Electrical Site Engineer في QD-SBG Construction
  • قطر - الدوحة
  • أكتوبر 2014 إلى أكتوبر 2015

 Supervise operations in accordance with the approved Method Statement, shop drawings, specifications, material submittals, and schedules to achieve the acceptance of the project deliverables.
 Supervision of Rough-in works or installation of raceways, cable tray, conduits, to include PVC, RSC, EMT, IMC and GI.
 Determination for the needed boxes like junction, utility, and pull boxes to be installed at site.
 Supervised the installation of panel boards, breakers, to include lighting, power and even MTS and ATS.
 Conduct site visit and surveillance for the daily activities.
 Conduct meeting/briefing for implementation of works.
 Attended meeting and inspection with the concern parties.
 Estimate and prepare Electrical material take off prior for Site implementation.
 Prepared and draw the as-built electrical plan.

Project Engineer في Hypervolt Contractor Corporation
  • الفلبين
  • يونيو 2011 إلى سبتمبر 2014

 Supervise operations in accordance with the approved Method Statement, shop drawings, specifications, material submittals, and schedules to achieve the acceptance of the project deliverables.
 Supervision of Rough-in works or installation of raceways, cable tray, conduits, to include PVC, RSC, EMT, IMC and GI.
 Determination for the needed boxes like junction, utility, and pull boxes to be installed at site.
 Determination for the number and sizes of wires and conduit needed to be installed at site.
 Supervised the installation of panel boards, breakers, to include lighting, power and even MTS and ATS.
 Conduct site visit and surveillance for the daily activities.
 Conduct meeting/briefing for implementation of works.
 Attended meeting and inspection with the concern parties.
 Estimate and prepare Electrical material take off prior for Site implementation.
 Prepared and draw the as-built electrical plan.

Technical Assistant في Ayala Property Management Corporation
  • الفلبين
  • يوليو 2010 إلى يونيو 2011

 Prepare scope of works particularly repair and maintenance of the building equipment.
 Resolved operation problems through collaboration with contractors, product and design teams
 Running extensive test to make sure everything is working properly
 Electrical Installation and trouble shooting
 Prepare requisition of materials, tools and equipment
 Conduct meeting/briefing for implementation of works.
 Attend occupants concerns regarding their technical problem in their unit

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Pangasinan State University
  • أبريل 2009

Specialties & Skills

MS Office tools
Electrical Testing
Electrical Design
Electrical Safety
AutoCAD
MS Office
Electrical Installation and Testing
autoCAD

اللغات

الانجليزية
متمرّس
الفيلبينية
اللغة الأم
العربية
مبتدئ