QA/QC ENGINEER
Parsons International Limited
Total years of experience :20 years, 3 Months
• Team member in the implementation of the following projects;
I- Airport Interchange & Airport Region Road Networks E10, Abu Dhabi- AED 775, 967, 195.
• Scope of Works: a). Construction of 3 Interchanges comprising 7 Bridges. b). Widening of asphalt road along E10 Highway and Presidential Flight Road. c). Construction of Various Utilities. d). Micro-tunneling works for storm water line. e) Construction of Yas Tunnel/Underpass
II- Improvement of Mafraq to Al Gheweifat, Section 3A (Baynounah Forest to Al Mirfa)- AED 1Billion+.
• Scope of Works: a). Construction of 4 Bridges. b). 55-km. bituminous pavement 8-lane road. c). Construction of Box/pipe culverts and various services/utilities.
• Team member in the implementation of the following projects; 1. Installation of Permanent Dewatering System and Maintenance of Villas & Buildings under Takreer/ADNOC located at Ruwais, Abu Dhabi, UAE. 2. Construction & Maintenance of Various Residential Villas in Mirfa, Western Region Abu Dhabi, UAE. 3. Lowering of Underground Water Level at Khalifa City "B" Under the Municipality of Abu Dhabi, UAE. 4. Various projects under GASCO, Abu Dhabi, UAE.
• Team member in the implementation of the construction of 146 units G+2 Villas and 16 units B+G+4 Buildings- Dubai Waterfront-Madinat Al Arab, Badrah Development.
• The project involved precast units, road network and drainage system.
• Team member in the implementation of the construction of 4 Nos. buildings (B+G+17) - Khalidiya Palace Rotana Hotel & Residences, Abu Dhabi, UAE.
• Supervised various construction of school buildings, infrastructure projects & water facility projects.
• Supervision of various concrete & asphalt road projects.
• Supervision of construction of concrete bridges.