Riki Setiawan فهمي, L1 NFV Support Engineer

Riki Setiawan فهمي

L1 NFV Support Engineer

Nityo Infotech

البلد
إندونيسيا
التعليم
بكالوريوس, Telecommunication Engineering
الخبرات
8 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :8 years, 7 أشهر

L1 NFV Support Engineer في Nityo Infotech
  • إندونيسيا
  • ديسمبر 2018 إلى أبريل 2019

Client: PT Ericsson Indonesia for vEPC XL Project
Responsibilities:
 Monitoring and do the basic troubleshoot for vEPC equipment
 Creating trouble ticket to the respective expert team
 Generating standard reports as defined

Engineer في PT GCI Indonesia
  • إندونيسيا
  • أبريل 2016 إلى ديسمبر 2018

Installing OLT for new site (Fiberstar Project)
•Installing NMS (EMS U31) Server and client for GPON Network based on Windows and Linux OS (CGS Linux Redhat Based)
•Conduct proof of concept for OLT C320 and ONT F609 for PPPOE, IPTV, VOIP, Jumbo Frame, QinQ service in Fiberstar GPON Project
•Conduct proof of concept for VDSL Equipment (9806V) for Data/Internet and IPTV service in MNC Project
•Conduct proof of concept for OLT C300 and ONT F609 for IPOE, IPTV, VOIP Service in MNC GPON Project
•Provide design and configuration for FTTB implementation using ZTE devices (OLT C320 and ONT F821) based on customer requirement in Gold Peak Apartmen project
•Provide support troubleshooting for Multicast case using wireshark, TLS case and SNMP config case for Fiberstar GPON Project
•Provide support troubleshooting for case BRAS using wireshark and syncmib state for MNC GPON Project
•Provide SOP/MOP for process swap control card, upgrading NMS and upgrading IOS version of OLT and ONT
•Provide support troubleshooting for case congestion of IPTV by collecting data throughtput per interface of ONU F822 for “RS Indriyani” project
•Provide training basic GPON and NMS for Fiberstar GPON Project

Engineer في GCI Indonesia
  • إندونيسيا
  • أكتوبر 2015 إلى أبريل 2016

• Manage Service for Switch IP Core Dept at CDMA Project Smartfren

Senior Network Engineer في Taejin Perkasa
  • إندونيسيا
  • أكتوبر 2013 إلى أكتوبر 2015

• for XGPON-MSAN Project (PT Telkom Akses-GBN-Alcatel Lucent Indonesia Consortium ) for 32 CO ( Central Office

- Provide design and configuration for FTTC implementation using alcatel lucent devices (OLT ISAM 7360, MDU ISAM 7356 REM, MDU ISAM 7302, ONT I-240G-D, )
- Analyze FO Power link Budge and performance
- Provide SOP installation for AMS 5520 ( OAM OSS for ISAM devices) and integrate this application with provider OSS/NMS
- Provide SOP for devices configuration involved :
Metro-E integration, BRAS Configuration for PPPOE( using Cisco and Alcatel Lucent Devices), IPTV Parameter: multicast, IGMP channel,
. SIP parameter: Proxy CSCF, Realm, SIP UA, MSAN 1 directory number 1, MSAN 1 uri, MSAN 1 username and password, IMS interconnection for Voices Services, Integration the devices using Tl1 with provider’s OSS/NMS, Troubleshoot the system using network Analyzer ( Wireshark) and FO link analyzer tools ( OPM, OTDR )
• Design and installing wireless infrastructure for POSCO
• Installing Cisco Router and Switch for Aeon Mall Project

• Installing Fortigate for Lottedutyfree project

Tehnician في PT. Unisistama Megah
  • إندونيسيا
  • يونيو 2013 إلى أكتوبر 2013

Design and installing IT infrastructure for LotteMart Branch
•Configure Router and Switch for new project
•Monitoring and Troubleshooting Indonesian LotteMart network
•Configure VoIP device(MyLG070) based on SIP

Network Engineer في PT Taejin Perkasa
  • إندونيسيا
  • فبراير 2012 إلى ديسمبر 2012

Client: Mostly from Lotte’s Group especially LotteMart, Lotte Capital and Lotte Packaging
Responsibilities:
• Design and installing IT infrastructure for LotteMart Branch
• Configure Router and Switch for new project
• Monitoring and Troubleshooting Indonesian LotteMart network
• Configure VoIP device(MyLG070) based on SIP

Customer Support Engineer في Airspan Networks Indonesia
  • إندونيسيا
  • يناير 2011 إلى يناير 2012

Client: PT. Indosat Mega Media
Responsibilities:
• Installing and Commissioning Fixed Wimax Networks area Batam
• Monitoring and Troubleshooting Fixed Wimax Networks area Batam

Site Engineer في Mitrabhakti Inti Perdana
  • إندونيسيا
  • مايو 2010 إلى يناير 2011

Client: PT. Indonesia Comnet Plus (ICON +)
Responsibilities:
• Maintenance Dense Wavelength Device (DWDM) Device
• Maintenance Site Area (CME)

الخلفية التعليمية

بكالوريوس, Telecommunication Engineering
  • في Bandung
  • يناير 2009

الثانوية العامة أو ما يعادلها, High School
  • في Senior High School
  • يناير 2003

Lamongan

الثانوية العامة أو ما يعادلها, public school
  • في Junior High School
  • يناير 2000

Lamongan

Specialties & Skills

اللغات

الانجليزية
متمرّس
الاندونيسية
متمرّس