Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

Rizwan Aziz

Planning Engineer

Location:
Libya - Tripoli
Education:
Diploma, Civil & Architecture Technology
Experience:
9 years, 7 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  9 Years, 7 Months   

January 2011 To June 2013

Planning Engineer

at Al-Nahr Company Limited Libya
Location : Libya - Tripoli
1. From January 2011, to till date.
Working as a Planning Engineer in Al-Nahr Company Limited Libya (Established by the Government)
Client: Great Man Made River Water Utilization Authority (GMRWUA) Libya
Consultant: IBK
Project Name: Coastal Strip Agricultural Water Supply Project.
Project is consisting to make a Ductile Iron (D.I) / uPVC Pipeline DN 1200mm to 50mm Diameter (I.D) for Irrigation & Water Supply Purpose in Libya.

Responsibilities:
☞ Scheduling and planning of day to day Construction Activities.
☞ Preparing and Issuing of 03 days work Schedule.
☞ Preparing the Daily, Weakly & Monthly Construction Activity Report.
☞ Coordination with Engineering Department for Drawing & Documents.
☞ Other Routine Matters in the Project.
December 2008 To August 2009

Planning Engineer & Documents Controller

at Al-Nahr Company Limited Libya
Location : Libya - Tripoli
2. From December 2008, to August 2009.
Worked as a Planning Engineer & Documents Controller in Al-Nahr Company Limited Libya (Established by the Government)
August 2008 To November 2008

Survey Engineer

at Al-Nahr Company Limited Libya
Location : India
3. From August' 2008 to November' 2008.
Worked as a Survey Engineer in Al-Nahr Company Limited Libya (Established by the Government.)
Client: Great Man Made River Authority (GMRA) Libya
Consultant: Brown & Root North Africa.
Project Name: Great Man-Made River Project Tripoli to Bir Tirfas (TAT)
Project consists of, installation of PCCP Pipeline 4000, 3600, 2800, 2000 and 1600mm Diameter (I.D) for Irrigation & Water Supply Purpose in Libya.

Responsibilities:
☞ Setting out of R.O.W (Right of Way) with GPS
☞ To Stake out Centre Line for Pipe Line by Total Station.
☞ Laying of Control Points Along Trench (By Traversing)
☞ To Handle All Matters Related With Land Surveying.
☞ To Handle All Matters during Pipe Laying Like Control of Centre Line Profile according to design and specifications and also preparation of installation control sheet
☞ Preparation of Bedding and U-Shaping with Laser LLH and Laser Javelin
August 2006 To July 2008

Survey Engineer in Geo

at tech Consultancy Services
Location : Pakistan
4. From August' 2006 to July' 2008
Worked as a Survey Engineer in Geo- tech Consultancy Services (GCS) Islamabad Pakistan

Client: UNICEF
Consultant: Engineering Consultant International Limited (ECIL)
Project Name: Rebuild and Rehabilitate of Earthquake Areas in Kashmir. (Hospitals & Schools)


Responsibilities: ☞ Layout of Hospital and School Buildings.
☞ Collecting the Coordinates points (ENZ) and All Topographic Details of New Purchased Area for Hospitals and Schools.
☞ Stake Out Boundary of Plot By Total Station & Calculate Area.
☞ Prepare all shop Drawings, Cross Sections and Contour/Topographic Map by Auto Cad.
☞ Control all Survey activities according to Design and Specification.
December 2004 To July 2006

Land Surveyor

at Frontier Work Organizatio
Location : Pakistan - Islamabad
☞ Coordination with Consultant / Owner.
5. From December' 2004 to July' 2006.
Worked as a Land Surveyor in Frontier Works Organization (F.W.O) Islamabad Pakistan
Client: Islamabad Housing Authority
Consultant: Capital Development Authority (CDA)
Project Name: Infrastructural Development of Sector G 13

Responsibilities:
☞ To Stake Out Centre Line of Sewerage lines, Drainage lines, Roads & Streets By Total Station,
☞ Laying Of Control Points (By Traversing Method)
☞ Preparation of Sub grade, Sub base and Base, work according to the plans; profile grades and cross sections including super elevations together with the road structure elevations in conformity with the approved working drawings.
☞ Plotting of cross section calculation of cross section area & volume of earth work.
☞ To Handle All Matters Related With Survey
July 2003 To October 2004

Land Surveyor

at Frontier Works Organization
Location : Pakistan
6. From July' 2003 to October 2004'.
Worked as a Land Surveyor in Frontier Works Organization (F.W.O) Gilgit Pakistan

Client: National Highway Authority
Consultant: National Engineering Services Pakistan (Pvt) Limited (NESPAK)
Project Name: GVR Road Gagooch to Phander (Gilgit)

Responsibilities:
☞ Cutting and Filling of Embankment.
☞ Preparation of Sub grade, Sub base and Base, work according to the plans; profile grades and cross sections including super elevations together with the road structure elevations in conformity with the approved working drawings.
☞ Plotting of cross section calculation of cross section area & volume of earth work.
☞ Submission of proposal to the seniors relevant to any modification of structure work and change of alignment in earth if required.
☞ To Handle All Matters Related with Survey.
January 2000 To December 2000

Consultant

at Great Man Made River Authority
Location : India
Client: Great Man Made River Authority (GMRA) Libya
Consultant: Brown & Root North Africa
Project Name: Great Man-Made River Project Tripoli Tee to Bir Tirfas (TAT)
Project consists of installation of PCCP Pipeline 4000, 3600, 2800, 2000 and 1600mm Diameter (I.D) for Irrigation & Water Supply Purpose in Libya.

Responsibilities:
☞ Scheduling and planning of day to day Construction Activities.
☞ Preparing and Issuing of 03 days work Schedule.
☞ Preparing the Daily/Monthly Construction Activity Report.
☞ Control of all incoming and outgoing Documents.
☞ Maintain Proper record/index of each document separately.
☞ Other Routine Matters in the Project.

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
January 2009

Diploma, Civil & Architecture Technology

at Poly Technical Insitute
Location : Pakistan - Islamabad
Diploma of Civil & Architecture Technology: Skill Development Council (Established under National Training ordinance 1980) in 2009.
January 2004

High school or equivalent,

at Board of Intermediate and Secondary Education Mirpur AJK Pakistan
Location : Pakistan - Rawalpindi
Passed H.S.S.C Examination: Board of Intermediate and Secondary Education Mirpur AJK Pakistan in 2004.
January 2003

Diploma,

at Punjab Board of Technical Education
Location : Pakistan - Lahore
Diploma of Associate Engineer (Civil): Punjab Board of Technical Education Lahore Pakistan in 2003.
January 2000

High school or equivalent,

at Board of Intermediate and Secondary Education Mirpur AJK Pakistan
Location : Pakistan - Rawalpindi
Passed S.S.C Examination: Board of Intermediate and Secondary Education Mirpur AJK Pakistan in 2000.

التخصصات والمهارات

EARTH WORK

IRRIGATION

LAND SURVEYOR

SCHEDULING

TOTAL STATION

WATER SUPPLY

إجراء الدراسات المسحية

Loading
Loading...
Loading...