Total Years of Experience: 9 Years, 7 Months
January 2011
To June 2013
Planning Engineer
at Al-Nahr Company Limited Libya
Location :
Libya - Tripoli
1. From January 2011, to till date.
Working as a Planning Engineer in Al-Nahr Company Limited Libya (Established by the Government)
Client: Great Man Made River Water Utilization Authority (GMRWUA) Libya
Consultant: IBK
Project Name: Coastal Strip Agricultural Water Supply Project.
Project is consisting to make a Ductile Iron (D.I) / uPVC Pipeline DN 1200mm to 50mm Diameter (I.D) for Irrigation & Water Supply Purpose in Libya.
Responsibilities:
☞ Scheduling and planning of day to day Construction Activities.
☞ Preparing and Issuing of 03 days work Schedule.
☞ Preparing the Daily, Weakly & Monthly Construction Activity Report.
☞ Coordination with Engineering Department for Drawing & Documents.
☞ Other Routine Matters in the Project.
Working as a Planning Engineer in Al-Nahr Company Limited Libya (Established by the Government)
Client: Great Man Made River Water Utilization Authority (GMRWUA) Libya
Consultant: IBK
Project Name: Coastal Strip Agricultural Water Supply Project.
Project is consisting to make a Ductile Iron (D.I) / uPVC Pipeline DN 1200mm to 50mm Diameter (I.D) for Irrigation & Water Supply Purpose in Libya.
Responsibilities:
☞ Scheduling and planning of day to day Construction Activities.
☞ Preparing and Issuing of 03 days work Schedule.
☞ Preparing the Daily, Weakly & Monthly Construction Activity Report.
☞ Coordination with Engineering Department for Drawing & Documents.
☞ Other Routine Matters in the Project.
December 2008
To August 2009
Planning Engineer & Documents Controller
at Al-Nahr Company Limited Libya
Location :
Libya - Tripoli
2. From December 2008, to August 2009.
Worked as a Planning Engineer & Documents Controller in Al-Nahr Company Limited Libya (Established by the Government)
Worked as a Planning Engineer & Documents Controller in Al-Nahr Company Limited Libya (Established by the Government)
August 2008
To November 2008
Survey Engineer
at Al-Nahr Company Limited Libya
Location :
India
3. From August' 2008 to November' 2008.
Worked as a Survey Engineer in Al-Nahr Company Limited Libya (Established by the Government.)
Client: Great Man Made River Authority (GMRA) Libya
Consultant: Brown & Root North Africa.
Project Name: Great Man-Made River Project Tripoli to Bir Tirfas (TAT)
Project consists of, installation of PCCP Pipeline 4000, 3600, 2800, 2000 and 1600mm Diameter (I.D) for Irrigation & Water Supply Purpose in Libya.
Responsibilities:
☞ Setting out of R.O.W (Right of Way) with GPS
☞ To Stake out Centre Line for Pipe Line by Total Station.
☞ Laying of Control Points Along Trench (By Traversing)
☞ To Handle All Matters Related With Land Surveying.
☞ To Handle All Matters during Pipe Laying Like Control of Centre Line Profile according to design and specifications and also preparation of installation control sheet
☞ Preparation of Bedding and U-Shaping with Laser LLH and Laser Javelin
Worked as a Survey Engineer in Al-Nahr Company Limited Libya (Established by the Government.)
Client: Great Man Made River Authority (GMRA) Libya
Consultant: Brown & Root North Africa.
Project Name: Great Man-Made River Project Tripoli to Bir Tirfas (TAT)
Project consists of, installation of PCCP Pipeline 4000, 3600, 2800, 2000 and 1600mm Diameter (I.D) for Irrigation & Water Supply Purpose in Libya.
Responsibilities:
☞ Setting out of R.O.W (Right of Way) with GPS
☞ To Stake out Centre Line for Pipe Line by Total Station.
☞ Laying of Control Points Along Trench (By Traversing)
☞ To Handle All Matters Related With Land Surveying.
☞ To Handle All Matters during Pipe Laying Like Control of Centre Line Profile according to design and specifications and also preparation of installation control sheet
☞ Preparation of Bedding and U-Shaping with Laser LLH and Laser Javelin
August 2006
To July 2008
Survey Engineer in Geo
at tech Consultancy Services
Location :
Pakistan
4. From August' 2006 to July' 2008
Worked as a Survey Engineer in Geo- tech Consultancy Services (GCS) Islamabad Pakistan
Client: UNICEF
Consultant: Engineering Consultant International Limited (ECIL)
Project Name: Rebuild and Rehabilitate of Earthquake Areas in Kashmir. (Hospitals & Schools)
Responsibilities: ☞ Layout of Hospital and School Buildings.
☞ Collecting the Coordinates points (ENZ) and All Topographic Details of New Purchased Area for Hospitals and Schools.
☞ Stake Out Boundary of Plot By Total Station & Calculate Area.
☞ Prepare all shop Drawings, Cross Sections and Contour/Topographic Map by Auto Cad.
☞ Control all Survey activities according to Design and Specification.
Worked as a Survey Engineer in Geo- tech Consultancy Services (GCS) Islamabad Pakistan
Client: UNICEF
Consultant: Engineering Consultant International Limited (ECIL)
Project Name: Rebuild and Rehabilitate of Earthquake Areas in Kashmir. (Hospitals & Schools)
Responsibilities: ☞ Layout of Hospital and School Buildings.
☞ Collecting the Coordinates points (ENZ) and All Topographic Details of New Purchased Area for Hospitals and Schools.
☞ Stake Out Boundary of Plot By Total Station & Calculate Area.
☞ Prepare all shop Drawings, Cross Sections and Contour/Topographic Map by Auto Cad.
☞ Control all Survey activities according to Design and Specification.
December 2004
To July 2006
Land Surveyor
at Frontier Work Organizatio
Location :
Pakistan - Islamabad
☞ Coordination with Consultant / Owner.
5. From December' 2004 to July' 2006.
Worked as a Land Surveyor in Frontier Works Organization (F.W.O) Islamabad Pakistan
Client: Islamabad Housing Authority
Consultant: Capital Development Authority (CDA)
Project Name: Infrastructural Development of Sector G 13
Responsibilities:
☞ To Stake Out Centre Line of Sewerage lines, Drainage lines, Roads & Streets By Total Station,
☞ Laying Of Control Points (By Traversing Method)
☞ Preparation of Sub grade, Sub base and Base, work according to the plans; profile grades and cross sections including super elevations together with the road structure elevations in conformity with the approved working drawings.
☞ Plotting of cross section calculation of cross section area & volume of earth work.
☞ To Handle All Matters Related With Survey
5. From December' 2004 to July' 2006.
Worked as a Land Surveyor in Frontier Works Organization (F.W.O) Islamabad Pakistan
Client: Islamabad Housing Authority
Consultant: Capital Development Authority (CDA)
Project Name: Infrastructural Development of Sector G 13
Responsibilities:
☞ To Stake Out Centre Line of Sewerage lines, Drainage lines, Roads & Streets By Total Station,
☞ Laying Of Control Points (By Traversing Method)
☞ Preparation of Sub grade, Sub base and Base, work according to the plans; profile grades and cross sections including super elevations together with the road structure elevations in conformity with the approved working drawings.
☞ Plotting of cross section calculation of cross section area & volume of earth work.
☞ To Handle All Matters Related With Survey
July 2003
To October 2004
Land Surveyor
at Frontier Works Organization
Location :
Pakistan
6. From July' 2003 to October 2004'.
Worked as a Land Surveyor in Frontier Works Organization (F.W.O) Gilgit Pakistan
Client: National Highway Authority
Consultant: National Engineering Services Pakistan (Pvt) Limited (NESPAK)
Project Name: GVR Road Gagooch to Phander (Gilgit)
Responsibilities:
☞ Cutting and Filling of Embankment.
☞ Preparation of Sub grade, Sub base and Base, work according to the plans; profile grades and cross sections including super elevations together with the road structure elevations in conformity with the approved working drawings.
☞ Plotting of cross section calculation of cross section area & volume of earth work.
☞ Submission of proposal to the seniors relevant to any modification of structure work and change of alignment in earth if required.
☞ To Handle All Matters Related with Survey.
Worked as a Land Surveyor in Frontier Works Organization (F.W.O) Gilgit Pakistan
Client: National Highway Authority
Consultant: National Engineering Services Pakistan (Pvt) Limited (NESPAK)
Project Name: GVR Road Gagooch to Phander (Gilgit)
Responsibilities:
☞ Cutting and Filling of Embankment.
☞ Preparation of Sub grade, Sub base and Base, work according to the plans; profile grades and cross sections including super elevations together with the road structure elevations in conformity with the approved working drawings.
☞ Plotting of cross section calculation of cross section area & volume of earth work.
☞ Submission of proposal to the seniors relevant to any modification of structure work and change of alignment in earth if required.
☞ To Handle All Matters Related with Survey.
January 2000
To December 2000
Consultant
at Great Man Made River Authority
Location :
India
Client: Great Man Made River Authority (GMRA) Libya
Consultant: Brown & Root North Africa
Project Name: Great Man-Made River Project Tripoli Tee to Bir Tirfas (TAT)
Project consists of installation of PCCP Pipeline 4000, 3600, 2800, 2000 and 1600mm Diameter (I.D) for Irrigation & Water Supply Purpose in Libya.
Responsibilities:
☞ Scheduling and planning of day to day Construction Activities.
☞ Preparing and Issuing of 03 days work Schedule.
☞ Preparing the Daily/Monthly Construction Activity Report.
☞ Control of all incoming and outgoing Documents.
☞ Maintain Proper record/index of each document separately.
☞ Other Routine Matters in the Project.
Consultant: Brown & Root North Africa
Project Name: Great Man-Made River Project Tripoli Tee to Bir Tirfas (TAT)
Project consists of installation of PCCP Pipeline 4000, 3600, 2800, 2000 and 1600mm Diameter (I.D) for Irrigation & Water Supply Purpose in Libya.
Responsibilities:
☞ Scheduling and planning of day to day Construction Activities.
☞ Preparing and Issuing of 03 days work Schedule.
☞ Preparing the Daily/Monthly Construction Activity Report.
☞ Control of all incoming and outgoing Documents.
☞ Maintain Proper record/index of each document separately.
☞ Other Routine Matters in the Project.