Incubation Manager
Punjab Information Technology Board (PITB)
Total years of experience :10 years, 2 Months
Public Sector: Project Name; Regional Plan9
Business Incubation Center Lahore
Public sector: Project name; National Expansion Plan-National Incubation Center (NEP-NICs)
Business Incubation Center Gujrat and Sukkur
ITCN Asia Startup Expo 24, Show PITB Incubation Wing presence at Expo and Manage Pod.
Ensuring that the Startup is on the right track
Development of a business model for the selected Startup
Assistance to our Entrepreneurs in terms of Networking and Investment
Monitoring and evaluation of Startup progress
Product patent writing
Creative and Content writing for clients on the social media platforms
Content writing for website UI/UX
Research writing and Research analysis
Ensuring that the Project completes the project in given timelines.
Developing the Project Plan with the team and manages the teams performance of project tasks.
Ensure Compliance to All Regulations and Specification Regarding Quality
Understanding the client requirement during and till the completion of Project.
Supervising and completion of the project as per client given standards.
Budgeting, scheduling, and planning.
Responsibilities:
•Schedule preparation, pre-planning and resource forecasting for engineering and other technical activities related to the project.
•Ensure projects are completed according to project plans.
•Manage project team resources and training and develop extensive project management experience and expertise.
•Inter-discipline coordination and overall quality control of the work.
•Budgeting, scheduling, and planning.
•Effective communications between engineering, technical, construction, and project control groups and assistance to the project manager.
Working as a Consultant 3G RF-Engineer, On DU Project.
Working as a Consultant 3G RF-Engineer, On ETISALAT Project
Command on 2G/3G network performance
Radio network optimization.
Perform Testing based site LTE
Drive Test for Rollout Sites
IBS SSV & SAOR
IBS Walk Test
Perform throughput testing according to customer demands.
GPRS/EDGE testing, HSUPA & HSDPA Testing.
Handovers Check I/O & O/I
Making of Site on Air Reports (SOAR) sites with the Help of ACTIX for making Post-Drive Test.
Check Troubleshooting of the Sites.
Resolve Customer complains.
Cluster drive of 2G/3G/4G sites to check the coverage and signal strength.
Cluster Drive of the following areas;
Al Falah City, Al Samha, Al Mafraq, Al Shamkha, Shahaman City, Al Ain city, Dubai, Sharjah & so many areas.
WARID PROJECT Baluchistan Region
(Gawadar, Pasni, Geuni, Bhishugun, Hub, Warindar, Uthal, Bella, Lasbella)
Maintain and develop relationships with existing clients via visits, telephone calls and emails
Travel across the country to visit technical consultants, EPC contractors, Independent Power Producers
Study the scope of work, BOQ and specifications from tender documents received from prospective clients
Respond effectively to client queries for technical and commercial information
Attend negotiation and clarification meetings with clients, consultants and external suppliers
Communicate with Middle East Area Manager of Seltatel, Italy on business matters
Working as a Support Engineer in the RF, BTS, OSP and ODN departments.
TELENOR PROJECT
DRIVE TEST
TELENOR PROJECT
SA, SAR, & LOS
CMPAK PROJECT
Responsible for BTS Maintenance of Central Punjab Region.
GPON PROJECT by WATEEN
Survey and Planning of proposed area and Design for OLT, FDT, SB, TB, FAT locations which included Multan and Lahore. Signal Levels and Signal losses were calculated for all these areas.
The survey included the following responsibilities of the Indoor and Outdoor OLT sites:
Check OLT room layout and ensure proper placement of the equipment which included OLT Rectifier Rack, AC Distribution Box, Thermostator, Optical Distribution Frame, Automatic Transfer Switch ATS, Air Conditioner, Electrical Equipment, Gen Set Main Power Supply and Cable Routes.
MBA in Project Management