Robert Di Lena, Architectural Healthcare Planner

Robert Di Lena

Architectural Healthcare Planner

ICME/SCME

Lieu
Etats Unis - Floride - Tampa
Éducation
Diplôme, Architecture Drafting
Expérience
30 years, 0 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :30 years, 0 Mois

Architectural Healthcare Planner à ICME/SCME
  • Émirats Arabes Unis - Abu Dhabi
  • juin 2011 à avril 2016

My responsibility as Project Manager:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

My responsibility as Senior Medical Equipment Planner:

1. User Group Meetings: providing floor plan designs, freehand schemes with medical equipment lay-outs.
2. Equipment research and review as well as directly coordinating installation with healthcare equipment manufacturers.
3. Room Data Sheets along with Medical Equipment Schedules, Procurement and Vendor coordination.
4. Developed Project Equipment Books which included legends and programs for each department.
5. Site Verification: Report all utilities and structural requirements were met for each piece of equipment.

Senior Medical Equipment Planner à Faust-Obermeyer
  • Émirats Arabes Unis - Abu Dhabi
  • novembre 2010 à juin 2011

My responsibility as Senior Medical Equipment Planner:

1. User Group Meetings: providing floor plan designs, freehand schemes with medical equipment lay-outs.
2. Equipment research and review as well as directly coordinating installation with healthcare equipment manufacturers.
3. Room Data Sheets along with Medical Equipment Schedules, Procurement and Vendor coordination.
4. Developed Project Equipment Books which included legends and programs for each department.
5. Site Verification: Report all utilities and structural requirements were met for each piece of equipment.

Project Manager/Architect à BakerBarrios
  • Autre
  • novembre 2006 à avril 2009

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

My responsibility as Construction Administrator:

1. Organized and held weekly Project meetings with the Owner and Contractor.
2. Verified that the quality of work completed met or exceeded the national construction standards.
3. Responded to R.F.I.’s, reviewed Shop Drawings, performed the punch list and issued the addendums.
4. Met with the State and Local building authorities to resolve both construction and life safety issues.
5. Inspected the site before occupancy to insure the work performed was constructed professionally.

Senior Project Coordinator à HuntonBrady
  • Autre
  • février 2005 à novembre 2006

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

Architectural Designer à Beebe Design Studio
  • Autre
  • février 2004 à février 2005

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

My responsibility as Construction Administrator:

1. Organized and held weekly Project meetings with the Owner and Contractor.
2. Verified that the quality of work completed met or exceeded the national construction standards.
3. Responded to R.F.I.’s, reviewed Shop Drawings, performed the punch list and issued the addendums.
4. Met with the State and Local building authorities to resolve both construction and life safety issues.
5. Inspected the site before occupancy to insure the work performed was constructed professionally.

Senior Project Coord./Designer à SMRT
  • Autre
  • juillet 2002 à février 2004

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

Project Mgr./Sr.Proj. Coord./Arch. Designer à TRO Jung/Brannen
  • Autre
  • novembre 1984 à juin 2002

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.
My responsibility as Senior Medical Equipment Planner:

1. User Group Meetings: providing floor plan designs, freehand schemes with medical equipment lay-outs.
2. Equipment research and review as well as directly coordinating installation with healthcare equipment manufacturers.
3. Room Data Sheets along with Medical Equipment Schedules, Procurement and Vendor coordination.
4. Developed Project Equipment Books which included legends and programs for each department.
5. Site Verification: Report all utilities and structural requirements were met for each piece of equipment.
My responsibility as Construction Administrator:

1. Organized and held weekly Project meetings with the Owner and Contractor.
2. Verified that the quality of work completed met or exceeded the national construction standards.
3. Responded to R.F.I.’s, reviewed Shop Drawings, performed the punch list and issued the addendums.
4. Met with the State and Local building authorities to resolve both construction and life safety issues.
5. Inspected the site before occupancy to insure the work performed was constructed professionally.

Éducation

Diplôme, Architecture Drafting
  • à Architectural Draftsman
  • juin 1981

Specialties & Skills

Construction Management
Life Safety
Durable Medical Equipment
Project Management
Healthcare
Healthcare Design and Planning
Presentation Freehand Drawings
Architectural Models

Langues

Anglais
Expert

Adhésions

AIA
  • Member
  • April 2010

Formation et Diplômes

Architectural and Industrial Drafting (Certificat)
Date de la formation:
June 1981
Valide jusqu'à:
January 9999
ARE Architectural Registration Exam (Formation)
Institut de formation:
Colorado Department of Regulatory Agencies; DORA
Date de la formation:
November 2010
Durée:
47392 heures

Loisirs

  • Architectural Models
    Architectional Presentation: Project: Model for a Full Gospel Assembly of God Church
  • Models
    Automobile
  • Architectural Models
    City of Rome