روبرت Di Lena, Architectural Healthcare Planner

روبرت Di Lena

Architectural Healthcare Planner

ICME/SCME

البلد
الولايات المتحدة - فلوريدا - Tampa
التعليم
دبلوم, Architecture Drafting
الخبرات
30 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :30 years, 0 أشهر

Architectural Healthcare Planner في ICME/SCME
  • الإمارات العربية المتحدة - أبو ظبي
  • يونيو 2011 إلى أبريل 2016

My responsibility as Project Manager:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

My responsibility as Senior Medical Equipment Planner:

1. User Group Meetings: providing floor plan designs, freehand schemes with medical equipment lay-outs.
2. Equipment research and review as well as directly coordinating installation with healthcare equipment manufacturers.
3. Room Data Sheets along with Medical Equipment Schedules, Procurement and Vendor coordination.
4. Developed Project Equipment Books which included legends and programs for each department.
5. Site Verification: Report all utilities and structural requirements were met for each piece of equipment.

Senior Medical Equipment Planner في Faust-Obermeyer
  • الإمارات العربية المتحدة - أبو ظبي
  • نوفمبر 2010 إلى يونيو 2011

My responsibility as Senior Medical Equipment Planner:

1. User Group Meetings: providing floor plan designs, freehand schemes with medical equipment lay-outs.
2. Equipment research and review as well as directly coordinating installation with healthcare equipment manufacturers.
3. Room Data Sheets along with Medical Equipment Schedules, Procurement and Vendor coordination.
4. Developed Project Equipment Books which included legends and programs for each department.
5. Site Verification: Report all utilities and structural requirements were met for each piece of equipment.

Project Manager/Architect في BakerBarrios
  • غير ذلك
  • نوفمبر 2006 إلى أبريل 2009

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

My responsibility as Construction Administrator:

1. Organized and held weekly Project meetings with the Owner and Contractor.
2. Verified that the quality of work completed met or exceeded the national construction standards.
3. Responded to R.F.I.’s, reviewed Shop Drawings, performed the punch list and issued the addendums.
4. Met with the State and Local building authorities to resolve both construction and life safety issues.
5. Inspected the site before occupancy to insure the work performed was constructed professionally.

Senior Project Coordinator في HuntonBrady
  • غير ذلك
  • فبراير 2005 إلى نوفمبر 2006

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

Architectural Designer في Beebe Design Studio
  • غير ذلك
  • فبراير 2004 إلى فبراير 2005

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

My responsibility as Construction Administrator:

1. Organized and held weekly Project meetings with the Owner and Contractor.
2. Verified that the quality of work completed met or exceeded the national construction standards.
3. Responded to R.F.I.’s, reviewed Shop Drawings, performed the punch list and issued the addendums.
4. Met with the State and Local building authorities to resolve both construction and life safety issues.
5. Inspected the site before occupancy to insure the work performed was constructed professionally.

Senior Project Coord./Designer في SMRT
  • غير ذلك
  • يوليو 2002 إلى فبراير 2004

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.

Project Mgr./Sr.Proj. Coord./Arch. Designer في TRO Jung/Brannen
  • غير ذلك
  • نوفمبر 1984 إلى يونيو 2002

My responsibility as Project Manager/Architect/ Job Captain:

1. Review contract documents; perform Code Analysis Report which covered Life Safety and Fire issues.
2. Responsible for Quality Assurance and Coordination between all disciplines.
3. Worked closely with the users of each department during design to insure that I met their needs and requirements.
4. Held client/user meetings in which I developed and provided presentational Departmental Floor plans.
5. Responsible for the project schedule and budget as well as meeting the firm's standard of quality.
My responsibility as Senior Medical Equipment Planner:

1. User Group Meetings: providing floor plan designs, freehand schemes with medical equipment lay-outs.
2. Equipment research and review as well as directly coordinating installation with healthcare equipment manufacturers.
3. Room Data Sheets along with Medical Equipment Schedules, Procurement and Vendor coordination.
4. Developed Project Equipment Books which included legends and programs for each department.
5. Site Verification: Report all utilities and structural requirements were met for each piece of equipment.
My responsibility as Construction Administrator:

1. Organized and held weekly Project meetings with the Owner and Contractor.
2. Verified that the quality of work completed met or exceeded the national construction standards.
3. Responded to R.F.I.’s, reviewed Shop Drawings, performed the punch list and issued the addendums.
4. Met with the State and Local building authorities to resolve both construction and life safety issues.
5. Inspected the site before occupancy to insure the work performed was constructed professionally.

الخلفية التعليمية

دبلوم, Architecture Drafting
  • في Architectural Draftsman
  • يونيو 1981

Specialties & Skills

Construction Management
Life Safety
Durable Medical Equipment
Project Management
Healthcare
Healthcare Design and Planning
Presentation Freehand Drawings
Architectural Models

اللغات

الانجليزية
متمرّس

العضويات

AIA
  • Member
  • April 2010

التدريب و الشهادات

Architectural and Industrial Drafting (الشهادة)
تاريخ الدورة:
June 1981
صالحة لغاية:
January 9999
ARE Architectural Registration Exam (تدريب)
معهد التدريب:
Colorado Department of Regulatory Agencies; DORA
تاريخ الدورة:
November 2010
المدة:
47392 ساعة

الهوايات

  • Architectural Models
    Architectional Presentation: Project: Model for a Full Gospel Assembly of God Church
  • Models
    Automobile
  • Architectural Models
    City of Rome