روبرتو سيبولفيدا, Procurement Director (Nigeria)

روبرتو سيبولفيدا

Procurement Director (Nigeria)

BUA Group

البلد
المكسيك
التعليم
دبلوم, Business
الخبرات
29 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :29 years, 3 أشهر

Procurement Director (Nigeria) في BUA Group
  • نيجيريا
  • أشغل هذه الوظيفة منذ أغسطس 2014

Procure goods and services to assure business and continuity operation in the best-cost level; all required goods and services for cement.
• Supply materials and spare parts for one new cement line for 600 MM USD.
• Set up procurement processes: procurement policy creation, logic and physical warehouse creation, raw materials/spare parts/consumables plan creation, contracts and agreements creation, and supplier evaluation.
• SAP implementation.

Consultant (Mexico & Nigeria) في Consultancy Services
  • المكسيك
  • مارس 2013 إلى يوليو 2014

Detect opportunity areas and implement improvements for increasing benefits and savings, and diminishing costs, different sectors and industries; cement, steel, and services for construction and automotive industries.
• Set up three steel projects for 30 MM USD in Mexico.
• Procurement assessment for new cement plant with power generation station and cement plant in operation, all in Nigeria.

Procurement Manager (Qatar) في Al Khalij Holding
  • قطر - الدوحة
  • فبراير 2012 إلى فبراير 2013

Procure goods and services to assure business and continuity operation in the best cost level.
• Stabilize and optimize procurement process (on going).

Consultant (Mexico) في Consultancy Services
  • المكسيك
  • يوليو 2009 إلى يناير 2012

Detect opportunity areas and implement improvements for increasing benefits & savings, and diminishing costs.
• Increase production in 50%.

Procurement Director (Egypt & UAE) في CEMEX
  • مصر - القاهرة
  • فبراير 2005 إلى يونيو 2009

Support the efforts of the procurement area for complying with the objectives of CEMEX by means of implementation of new vision and methodologies to assure its efficient operation.
• Generate savings and benefits for 1.0 MM USD.
• Improve working capital in 50% (11.0 MM USD).
• Decrease headcount in 30% (0.1 MM USD per Year).

Lime Plants Manager (Mexico & USA) في CEMEX
  • المكسيك
  • أغسطس 2002 إلى يناير 2005

Integration Procurement Project (Mexico & USA)
Create a new vision and identity of the area, guaranteeing the opportunity, quality and effectiveness in the services offered, creating value and contributing to the sustainable growth of CEMEX.
• Decrease inventory level in 150.0 MM USD.
Lime Plants Manager (Mexico)
Support the efforts of the operation - lime area (3 lime plants in Mexico with yearly cost budget 17 MM USD and 336 people) for complying with the objectives of CEMEX and implement the opportunity areas detected in the prior processes to the acquisition or to the incorporation to CEMEX (Due Diligence and Post Merge Integration).
• Increase operation margin to 3.0 MM USD per Year.

Operative Support Manager (Mexico) في CEMEX
  • المكسيك
  • نوفمبر 2001 إلى يوليو 2002

Support the efforts of the operation - cement area for complying with the objectives of CEMEX. Establish assignment product process and production programs, generate cost budgets and investment plans (country, region and plant level), detect opportunity areas and propose practices that improve the productivity levels and reduce operation costs in cement plants.
• Analyzed and evaluated the impact in rationalization of the assignment product process for cement plants in Mexico (savings for 20 MM USD in 5 of 18 cement plants).

Studies and Investments Manager (Mexico) في CEMEX
  • المكسيك
  • فبراير 1995 إلى أكتوبر 2001

Support the efforts of the operation - cement area for complying with the objectives of CEMEX. Analyze the information (country, region and plant level), detect opportunity areas and propose practices that improve the productivity levels and reduce operation costs in cement plants.
• Consolidated and analyzed the information related to cost budgets 450 MM USD, investment plans 150 MM USD, and administrative and operative results of the cement plants in Mexico.

الخلفية التعليمية

دبلوم, Business
  • في CEMEX - IPADE
  • ديسمبر 2000

CEMEX - IPADE: Business and Management Program CIMP

ماجستير, Industrial Engineering
  • في UANL
  • ديسمبر 1987

UANL: Master in Industrial Engineering with Specialty in Productivity (1987)

دبلوم, Productivity
  • في ITESM
  • ديسمبر 1987

ITESM: Productivity

دبلوم, Development Organizational
  • في UDEM
  • ديسمبر 1986

UDEM: Development Organizational

ماجستير, Business
  • في UANL
  • ديسمبر 1985

UANL: Master in Business with Specialty in Finances (1985)

بكالوريوس, Industrial Engineering
  • في UANL
  • ديسمبر 1983

UANL: Degree in Industrial Engineering and Management (1983)

Specialties & Skills

اللغات

الانجليزية
متمرّس
الاسبانية
متمرّس
الفرنسية
مبتدئ

التدريب و الشهادات

SAP (تدريب)
معهد التدريب:
Fujitsu
تاريخ الدورة:
May 2012

الهوايات

  • Jogging and Mountain Bike