Location: Mount Poonamallee Road Manapakkam, Chennai, India
Position: Project Head
Inclusive Date: July 15, 2012 to August 31, 2013
Recent Project / Accomplishment:
CHENNAI METRO RAIL LIMITED (CMRL - Project) Chennai, India
TRANSTONNELSTROY - L&T/AFCONS JOINT VENTURE
Construction of Underground Stations - Mannadi, High Court, Chennai Central & Washermanpet
2500mmØ Cast-In-Situ Plunged-in Column and Barrette Structure.
TWIN TOWER, MULTI STORIED RESIDENTIAL BUILDINGS at
Thazhambur village, Chennai, India
ARMY WELFARE HOUSING ORGANIZATION (AWHO)
BORED PILE Cast-in-situ Piling Works ( 650 nos. of Pile with 1000mm dia. and 800mm dia.)
Duties & Responsibilities:
As Project Head / Construction Manager
➢ Administer the contract until completions conforms to the quality time, schedule and cost requirement implements to the project as per project quality plan.
➢ Monitor progress with respect to planning report to client on progress, quality and any constraints.
➢ Ensure that safety rules and regulation are communicated to the work force and fully enforced.
➢ Reconciliation meeting with the contractor consultant and client.
➢ Coordination job includes communication with all concerned Consultants with respect to the actual status of construction works.
➢ Reports to General Production Manager and CEO of the company.
➢ Job responsibilities is inclusive of managing an in-house staff of engineers for site preparation, coordinating with third-party Project Management and Quantity Surveyor. Also full-time stay on site to ensure prompt and efficient completion of the project in accordance with project specifications.
Company: SWISSBORING OVERSEAS PILING CORP. LTD. a TREVI GROUP OF COMPANIES (ITALY)
Location: Al Quoz Land 3, Dubai, United Arab Emirates ( U.A.E.)
Position: Project Engineer / QA/QC Engineer
Inclusive Date: July 15, 2006 to July 10, 2012
Duties & Responsibilities:
As Project Engineer
➢ Overall responsibility of construction functions related to the project.
➢ Providing support to the Project Manager.
➢ Update and follow up construction program.
➢ Control of requisitions, provision of construction materials.
➢ Control technical issues and review of technical submissions.
➢ Interpreting contract drawings and specification and being familiar with all provisions of the contract and any revisions or amendments.
➢ Assisting the Project Manager to establish relevant aspect of the quality control operations.
➢ Records and control of accomplishments.
➢ Ensure all staff under his control, experienced and trained in their respective discipline.
➢ Attend weekly site meetings for purposes of reporting actual status of projects, either to Project Manager or Project Consultants.
As QA/QC Engineer
➢ Excellent Experience and knowledge of ISO 19011:2002 and ISO 9001:2008,
Quality and environmental management systems auditing and Quality management system - requirements.
➢ Experience Auditor in Quality Management System and continually improve effectiveness in accordance with ISO 9001:2008.
➢ Experience Auditor in Company Internal Quality Management Audit
➢ Good Experience and knowledge of Inspection and Testing Plan/Procedure (ITP)
➢ Responsible for all aspects related to project Quality Assurance and Quality Control.
➢ Implementation of the Quality Management and control programmed for the project.
➢ Daily site inspection and periodical offset inspection.
➢ Controlling all inspection activities on site.
➢ Completion of necessary documentation to verify the work performed.
➢ Ensuring that all test reports are verify to meet the contract requirement.
➢ Issue and administer Non Conformance Reports as necessary, give recommendation and ensure follow up ➢ Report to the Project Manager any deficiencies in the operation of quality management and control system.
➢ Completion of final quality documentation in a presentable manner in accordance with the condition of the contracts.
➢ Responsible for overseeing / audits of subcontractor Quality Management system.
Recent Projects / Accomplishments:
1. RUWAIS REFINERY EXPANSION PROJECT - Ruwais Abu Dhabi, U.A.E.
Corridor Pipe Crossing F1, F2, and F3 - Dredging International
EPC - 4 Tankage and Associated Interconnecting Piping, Double Wall Propylene Tank,
Sphere Tank, Pipe Crossing, Vertical Pump and Equipment Foundation. -
DAEWOO E & C
EPC - 1 Pipe Rack Foundation, Vertical Pump and Equipment Foundation -
SK Engineering & Construction
EPC - 3 Package # 3 Offsite and Utilities - SAMSUNG ENGINEERING
2. Al Marjan Island Development (Island 3 and 4) Ras Al Khaimah, U.A.E.
3. Al SUFOUH TRANSIT SYSTEM, Dubai, Marina
4. MARRIOT COURTYARD HOTEL, Dubai, Motor City
5. PALAZO VERSACE D1 TOWER AND CONDOMINIUM, Dubai, Jadaf
6. R - 884 IMPROVEMENT OF AL ITHIHAD ROAD, Dubai, Hor Al Anz
7. BIGDIG AL DANA, Abu Dhabi, Al Raha Beach
8. ALDAR HEADQUARTERS, Abu Dhabi, Al Raha Beach
9. SHAHAMA - SAADIYATH FREEWAY, Abu Dhabi, Yas Island
10. WIDENING OF AL GARHOUD BRIDGE, Dubai, Burdubai
11. ANANTARA AND TIARA RESIDENCE, Dubai, Palm Jumeirah
Vibro Compaction, Stone Column and Piling
12. PORT RASHID SHIPYARD, Dubai, Dry Dock
- الدور الوظيفي:
-
الهندسة