Rodelito Morata, PAINTING AND INSULATION SUPERVISOR

Rodelito Morata

PAINTING AND INSULATION SUPERVISOR

PREZIOSO EMDAD LLC

Location
Philippines
Education
Diploma, Industrial Equipment Installation Technician
Experience
15 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 1 Months

PAINTING AND INSULATION SUPERVISOR at PREZIOSO EMDAD LLC
  • June 2014 to June 2016

• Supervision of floor coating and painting job in National Food and Flour, Production and Marketing (NFFPM) ICAD 2 Mussafah Industrial Area Abu Dhabi - UAE
• Supervision of insulation job during shutdown period in GASCO RUWAIS, GASCO ASAB and AL HOSN GAS Abu Dhabi - UAE.
• Supervision of actual execution on cold online insulation at Plant # 19 LNG PLANT - ADGAS Das Island Abu Dhabi - UAE.
• Work permit originator and person in charge of the worksite.
• Material take-off and assessment.
• Verification of all insulation removal and re-fixing according to the scope of work.
• Coordinate with plant operator for priority job to be done to meet the shutdown schedule plan.
• Follow HSE Golden Rules.

PUF INJECTION INSULATION SUPERVISOR at MEISEI INDUSTRIAL CO. LTD
  • Papua New Guinea
  • December 2013 to May 2014

• Supervision of PUF insulation in PNG-LNG EPC3 Project - Client: ESSO Highlands Limited (EXXON Mobil) under the main contractor Chiyoda-JGC Joint Venture (CJJV)
• Preparation of Poly Urethane Foam injection machine and maintenance like changing of pump seals, o ring, temperature sensor, transducer, pressure gauge, high pressure hose fittings, filter, check valve, fluid heater, lubrication oil, circuit breaker, contactor, relay and injection gun repair.
• Monitor the actual execution of PUF injection on site.
• Troubleshoot and repair any error occurred during the operation of PUF machine on site.
• Ensure safety for myself and my colleagues.

TECHNICAL SUPERVISOR at PREZIOSO EMDAD LLC
  • United Arab Emirates - Abu Dhabi
  • August 2013 to September 2013

• Supervise online cold insulation trial demo training for ADGAS Das Island Abu Dhabi - UAE.
• Preparation of tools, materials and equipment prior to start online insulation demo.
• Give an instruction to my foreman on how to remove existing insulation materials by using hand tools adequately selected in order not to damage the under layer of pipe protective coating.
• Application of frost prevention hydrophobic gel onto their inner side and all joints of PIR.
• Installation of first layer, vapour barrier, spacers and metal mould prior to inject PUF.
• Removing of mould and installation of final cladding.
• Ensure all works conforms to Project Safety Rules.

WINTECH OPERATOR / PIR FABRICATION SUPERVISOR at PREZIOSO TECHNILOR SAS
  • Algeria - Constantine
  • May 2010 to December 2012

• Supervision of thermal insulation for Cryogenic in New LNG Project Skikda, Algeria under the main contractor (KBR)
• Fully proficient of WINTECH Profiler machine operation.
• Fabricate PIR insulation such as dome head, elbow, reducer and straight pipe cover.
• Troubleshoot and repair electrical/electronic machine in the workshop like MABI Machine, Roller, Lock former, Grover and Swage machine.
• Supervision in fabrication of insulation material in the workshop.
• Supervision of PUF injection on site and PUF Machine troubleshoot/repair.
• Follow the high safety standard as company required.
• Supervision of PUF injection on site and PUF Machine troubleshoot/repair.
• Follow the high safety standard as company required.

PAINTING/INSULATION SUPERVISOR at GS Engineering and Construction
  • United Arab Emirates
  • January 2009 to February 2010

• Monitoring of thermal insulation in SALALAH METHANOL PROJECT
• Update daily and weekly painting/insulation progress report.
• Execute and complete work by following procedure and work instruction in accordance with Engineering Quality system requirement under my supervision.
• Adheres to the Permit to Work system and carry out work fully complying with safety precaution and requirement as detailed and directed.
• Read and interpret isometric /structural and other related drawing of particular task assigned.
• Work hand-on-hand with the co-worker to accomplish an effective output of any assigned task.

INSULATION FOREMAN at MEISEI INDUSTRIAL COMPANY Limited
  • United Arab Emirates
  • July 2008 to October 2008

• Engaged with thermal insulation in PETRO RABIGH OLEFIN PLANT PROJECT under the main contractor JGC Arabia Limited (JAL) in Rabigh, Kingdom of Saudi Arabia.
• Perform necessary preparation of tools and materials for insulation job.
• Measure and cut insulation material to fit for pipe, elbow, tee, reducer and equipment.
• Monitor the actual execution of insulation work on site.
• Ensure safety for myself and my colleagues.
• Follow the high safety standard as company required.

Insulation Supervisor/General Maintenance Supervisor at MEISEI Nigeria Limited
  • August 2006 to October 2007

• Supervision of thermal insulation project in Nigeria Liquefied Natural Gas (NLNG).
• Check the tool/equipment before commencing work.
• Supervise the actual execution insulation work on site.
• Execute and complete work by following procedures and work instructions in accordance with Engineering Quality system requirements.
• Adheres to the Permit to Work system and carry out work fully complying with safety precautions and requirements as detailed and directed.
• Read and interpret isometric /structural and other related drawing of particular task assigned.
• Fully proficient of electrical/electronic repair in fabrication shop.
• Follow the high safety standard as company required.

Insulation Supervisor/General Maintenance Supervisor at MEISEI Nigeria Ltd
  • May 2003 to March 2006

• Engaged with thermal insulation for Cryogenic in NLNG PLUS PROJECT (Train 4 and 5) under the main contractor of TSKJ Nigeria Limited (Technip, Snamprogetti, Kellogg Brown and JGC) in Bonny Island, Rivers State, Nigeria.
• Provide support as required in preparation of machine and tool inspection to ensure insulation fabrication works are carried out in safe.
• Coordinates to all supervisor requested insulation material from fabrication to ensure the correct delivery to site.
• Supervise the actual execution insulation work on site.
• Supervises fabrication activities carried out in the workshop and ensures availability and operability of all workshop machines.
• Troubleshoot and repair any electrical /electronic equipment in the work shop and construction site.
• Ensures availability of adequate manpower, materials, tools and equipment guided by standard procedures.
• Comply with the safety rules and procedure as company required.

INSULATOR FOREMAN at MEISEI Nigeria Limited
  • July 2001 to April 2003

• Engaged with thermal insulation for Cryogenic of NLNG Expansion Project.
• Moves materials and tools to work area.
• Measure and cut insulation to fit covering surface, using tape measure, handsaw, knives, and scissor.
• Fit insulation around obstructions, joints, nozzles and studs.
• Installation of cladding material for pipe, flange, valve and vessel equipment.
• Adjust work schedules to accommodate urgently required work.
• Ensure workers are complying with the safety standard.
• Monitor accomplishments to meet target schedules.
• Coordinate with supervisors for effective work implementation.
• Operates machine in fabrication shop such as WINTECH Profiler machine and milled elbow machine.
• Monitors all work carried within the workshop/site to ensure that safety rules and regulations are being followed.
• Empowered to stop any operation not following laid down safety procedures.

SKILLED INSULATOR at MEISEI/MARUBENI Engineering West Africa Limited
  • April 1998 to May 2000

• Engaged with thermal insulation for Cryogenic of NLNG Plant Project.
• Preparation of material and select type of insulation required such as PIR, Rockwool, foam glass etc.
• Measure and cut to required dimension.
• Application of insulation using appropriate installation method.
• Fit around obstructions, joints and studs.
• Application of primary and secondary vapour barriers, vapour stop for single and multiple layer cold insulation.
• Install sheet metal around insulated pipe and equipment with screws and bonding in order to protect the insulation from weather conditions or physical damage.
• Read and interpret isometric /structural and other related drawing of particular task assigned.
• WINTECH Profiler machine operator.
• Aware the safety rules and procedures.
• Milled elbow machine operator.

Education

Diploma, Industrial Equipment Installation Technician
  • at Euro-Phil Trade Specialists Co.
  • June 2008

• Installation of industrial motors and control system. • Troubleshoot and repair.

Diploma, BUILDING WIRING INSTALLATION
  • at Technical Educational and Skills Development Authority (TESDA)
  • May 2008

• Prepare construction materials. • Perform measurement and calculation. • Interpret technical drawings and diagrams. • Maintain tools and equipment. • Perform housekeeping and observe safety. • Install wiring devices for floor and ground fault current interrupting outlets. • Install electrical lighting system on auxiliary outlets and lighting fixtures. • Install communication, signalling devices and remote control systems on auxiliary equipment. • Prepare electrical power and hydraulic tools. • Perform roughing-in activities for communication and distribution system. • Install electrical protection system. • Commission installed electrical system.

Diploma, Radio and TV Mechanics
  • at Cebu State College of Science and Technology
  • March 1995

• Basic electricity. • Fundamentals of Radio Receiver. • Radio Receiver System Principle. • Radio Receiver System Construction. • Troubleshooting and Repair. • Trade Drawing. • Shop Mathematics. • Fundamental of Electronics. • Fundamental of Television. • TV Antenna Designing. • TV Troubleshooting, Repair and Servicing.

High school or equivalent, SECONDARY COURSE
  • at Puertobello Barangay High School
  • March 1989

SECONDARY COURSE

Diploma, PRIMARY COURSE
  • at Puertobello Elementary School
  • March 1985

ELEMENTARY

Specialties & Skills

Electrician
Polyurethane
Oil Painting
Electronics Repair
Insulation
CUSTOMER RELATIONS
DELIVERY
GRAPHIC DESIGN
MATERIALS MANAGEMENT
MICROSOFT WORKS
SUPERVISORY SKILLS
TROUBLESHOOTING
TÉCNICAS DE SUPERVISIÓN

Languages

Filipino
Native Speaker
English
Intermediate

Training and Certifications

MABI 16-3 OPERATION AND MAINTENANCE (Training)
Training Institute:
MABI AG INSULATION MACHINERY
Date Attended:
January 2004
Duration:
112 hours

Hobbies

  • Air brush painting and design
    * Know how to draw and design using airbrush for vehicle and motorcycle.