Surveyor
CPP-branch of China Petroleum Pipelines Engineering ltd
Total years of experience :31 years, 0 Months
Setting out points for reference using total station machine, secures elevation using level machines
Assigned in all survey works needed in the site such as setting out reference points for civil works and elevation checking in every areas needed.
Pipeline allignment & elevation . Setting out points for pipe centerline thru coordinates using total stations machine. Securing elevation of every pipe installed using level machines.
Assigned in setting out points thru coordinates using Total Station Machine.(both structural & architectural). Secures elevation on each Floor as reference using Automatic Level machine.Checks the allignment of columns.Editting of Engineering Drawings Using Autocad.
Assigned in setting out points used as reference thru Coordinates using Total Station Machine.Secures Elevation on each floor using Automatic Level Machine.Site inspection of embedments for pre-cast panels.Supervises the Erection of Precast Panels for Boundary walls.Editting of Engineering shop Drawings using Autocad.
Securing elevation on each floor used as reference using Automatic Level Machine. Assists in setting out points thru coordinates using Total Station Machine.
Data entry operator, Proofreader
Assigned in processing of corporate papers, Encodes company profiles, Records custodian.Secures documents of registered companies.