Construction Projects Manager
GRAIA Construction Corporation
مجموع سنوات الخبرة :39 years, 6 أشهر
Address: Imus, Cavite, Philippines.
Projects: Handle the seven (7) flood control projects for Dept. of Public Works & Highways
(DPWH) and Land Transportation Office (LTO) building.
Projects: Operate Grab A Car or TNVS
Project Two (2) Title: Ma’aden Umm Mual Phosphate Plant Project (6.1 Package-UP1-UP4)
This project is cost $2 Billion USD comprises of Main and four Substation, Cooling RO and Brine Tower, Water Treatment Area (Decarbonator Tanks, Pre-treated and RO Tanks), Sulfuric Acid Tanks, MGA Tank, MGA +Raffinate Tanks, Caustic Soda Tanks, Liquid Molten-Sulfur Tanks, PPA Tanks and Diesel Fuel tanks, 2.5Kms main and secondary Pipe Racks, Clean and Contaminated Ponds, Sulfuric Acid Unloading Pits, Spill Way and Flush Pit, Rail Loading, Contaminated water line, Tertiary Line, Natural gas line, all duct banks and culver, trenches, road works, 62Kms Fiber Glass Pipe Lines (700mm-1000 diameter), Booster and Buffer Pump Houses, 16- Water Well Field/Control Kiosk and Utility Substation.
Project One (1) Title: Chevron Philips Chemical Process & Conversion Plants
(Nylon 6.6) PCC Project w/ cost of $1.2 Billion USD (total area of 50 Has.) @ Jubail, KSA
Project Title: $120M Seven (7) Storey Mobily Adamah Data Center @Dammam and Pop Rakah Data Center Technical Buildings @Al Khobar, Saudi Arabia.
Project Title: Mirdif 3.60 M Gallons reinforced concrete water reservoir, UAE.
Project Title: Ferrari Theme Park & Hotel (250 has. Area), Yas Island, Abu Dhabi, UAE.
Project Title: $400 Million Taunsa Bridge-Barrage Emergency Rehabilitation and
Modernization project (Funded by World Bank)
Comprises of:
Weir, sub-weir, abutment fish ladder wall, flared out wall, guide bank, D.G. khan canal head regulator & silt excluder tunnel & breast wall & 6.7 kilometers feeding channels.
Major components:
• 1500’ spillway = Glacis, stilling basins, chute blocks &sills, crest sill beams (Concrete = 300, 000 m3; excavation= 2, 750, 000 m3),
• Stone apron = 200, 000 m3;
• Permanent sheet piles = 7, 700 lm (2.46’X20’)
• Temporary sheet piles=4, 600 lm (2.46’x40’);
• Solid blocks =22, 000 pcs (4’x4’x4’);
• Curtain & cut out walls (2’x7’) = 3, 800 lm;
• Cofferdams =5, 000 lm (Silt clay-10mx 25mx 5m)
• Stone Bern (5mx13mx4.20m).
• Sub weir navigation lock = miter gate &radial gate,
• 6.7 km. Feeding channel & diversion canal = Excavation volume: 1, 000, 000 m3.
• Also participated in planning of Jari Hydraulic Dam’s Project.
Project Title: Turaif General Hospital (200 Beds), Northern Province, Saudi Arabia.
Project Title: Middle East Shopping Center and King Abdullah Aziz University Library, Jeddah, Kingdom of Saudi Arabia.
Project Title: National Commercial Bank and Mercedes Show Room, Jeddah, Saudi Arabia.
Project Title: National Bookstore Shopping Center and 14 Storey Tiffany Court, Makati and Quezon City, Philippines.
Project Title: Terumo Industrial Factory Project (2 has.), Laguna Techno Park, Philippines.
Project Title: High-rises: 37 Storey AIC Gold Tower (Pasig), 37 Storey AIC Victoria Tower (Makati) & 43 Storey AIC Waldorf Tower (Manila), Philippines.
Project Title: 3 has. Evegotesco Shopping Mall (Quezon City) and 37 Storey Trafalgar Plaza (Makati City), Philippines.
Project Title: 4 units High School Buildings @ four different cities (USAID Funded), Tayabas/ Pagbilao/ Atimonan/ Alabat Municipalities. Philippines.
Project Title: Structural Designing for PERTAMINA Indonesia Exor-1 Process & Arak Refineries, Ayala Alabang, Philippines.
Project Title: PLDT X5 IMPACT Transmission project (34 Relay Station, 17 Buildings & 17 Site Developments), Luzon- Visayas and Mindanao, Philippines.
Project Title: Eveready Battery Factory Processing Plant & Administration building, Mandaluyong City, Philippines.
Project Title: Construction of 4th Story, Notre Dame University, New Library College Bldg., and expansion of NDU Elementary Bldg., Construction of Cotabato City Health Expansion Bldg. & Lamsan Trading Processing Conveyor & Support, Cotabato City, Philippines.
Handle construction of housing projects at Polloc, Pigkawayan, Marbel
and Davao cadastral, subdivision & topographic surveying works.
1. Prepare project work schedule.
2. Evaluate accomplishment & prepare/ revise catch up work schedule and S-curve.
3. Attend coordination meeting w/ Subcontractor & Engineers/ Manager.
1. Prepare bill of quantity and costing of projects.
2. Prepare all necessary documents for building permit submittal.
3. Monitor site progress and qty. accomplishment for billing purposes.
1. Prepare Lot plan for Bureau of Land approval.
2. Prepare table survey & subdivide whole lot into required number of lots &
prepare sketch plan.
3. Draft structural &architectural plans for housing project.
GWA = 89%, NESP College Scholar Student. (1985-87) Academic Dean's Lister. (1983-88) 5X Team Champion- Full Contact Karate Tournament.
GWA = 88.88% 7th Honorable (Graduated Top 0.55% out of 1,612 graduates) 1980 Orator of the Year. 1981 Poster Making Contest - 1st Place. 1992 CAT Service and Leadership Awards. 1982 Artist of the Year. 1981 Junior School Chess Champion. 1982 Senior School Chess Champion. 1982 Team Champion - Open Full Contact Karate Tournament
GWA = 88.50% 6th Honor (Top 6 out of 150 graduating class). 1978 Most Industrious Student of the Year.