Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Romy Reballos, Commissioning Engineer

Romy Reballos

Commissioning Engineer·DAEWOO ENGINEERING & CONSTRUCTION

Philippines

Bachelor's degree, Mechanical Engineering

Work experience

Total years of experience: 14 years, 8 months

Commissioning Engineer

June 2013 - April 2014

DAEWOO ENGINEERING & CONSTRUCTION

India

June 2013 - April 2014

Company: DAEWOO ENGINEERING & CONSTRUCTION
Project: Misurata Combined Cycle Power Plant (MCCPP) Project, Libya
750 MW, one (1) 2-2-1 block comprising two (2) gas turbine, two (2) HRSG & one (1) STG, Dual pressure (HP & LP)
Date: 13 June 2013 - 03 April 2014
Position: Commissioning Engineer
Duty & Responsibility: ❖ Report directly to Commissioning Manager
❖ Supervise local operating condition of STG'S BOP equipment, piping system & HRSGs for any abnormalities while steam blowing is in progress
❖ Supervise the insertion & removal of test plates including the safety implementation of work
❖ Assist Fuji (vendor) for cold commissioning of steam turbine generator lube oil system such as main oil pumps, jockey oil pumps (AC & DC), emergency oil pumps & charging nitrogen to its accumulator; control oil system such as control oil pumps & charging of nitrogen to its accumulator; steam main stop valves (HPSV - left & right) setting and adjustment, steam main control valve (HPCV) adjustment and stroke test, admission stop valve (LPSV), admission control valve (LPCV), turning device, throttling of supply lube oil lines to STG trust bearings, operation of lube oil purifier
❖ Coordinate with DCS operator any cold commissioning work on field for the remote operation of equipment including logic function test &
❖ Uncouple and couple test; take vibration, temperature & speed of rotating equipment such as steam turbine control oil pumps, main lube oil pumps, jockey lube oil pumps (AC & DC), emergency lube oil pumps (AC & DC), oil vapor extractors, oil purifier and gland steam fan exhausters, HP/LP feed water pumps
❖ Supervise the local operating condition of STG & HRSG system for any abnormality during hot commissioning period
❖ Local operation of lube oil purifier for steam turbine generator unit, travelling band screen & bar screen cleaner at water intake area, condenser & closed cooling cooler tube cleaning systems
❖ Issue trouble memos for abnormality in operation of instrument temperature and pressure transmitters, passing manual valves, pressure and temperature control valves, pipe line, rotating & static equipment

Company industry:
Construction & Building
Job role:
Engineering

Commissioning Engineer

June 2013 - March 2014

Daewoo Engineering & Construction

Misrata, Libya

June 2013 - March 2014

The Project is a 750 MW Misurata Combined Cycle Power Plant, dual pressure (HP/LP), one 2-2-1 block comprising 2-GT, 2-HRSG & 1-STG

 Oversee local operating condition of Steam Turbine Generator (STG) and Balance of Plant (BOP) during steam blowing phase
-Supervise the insertion & removal of test plates including safety implementation
 Assist Fuji Electric vendor in commissioning STG lube oil system such as Main Oil Pumps, Jockey Oil Pumps (AC & DC), Emergency Oil Pumps (AC & DC); also, control oil system
 Assist Fuji Electric vendor in setting, adjustment and stroke testing of main steam control valves and stop valves (HPCV, HPSV, LPCV, LPCV)
 Oversee the pumps logic function test of Fuji supplied equipment
 Couple test of BOP pumps
 Local operation of lube oil purifier, travelling band screen and bar screen cleaner of circulating system at sea water intake
 Liaise with client's local operation and maintenance

Company industry:
Construction & Building
Job role:
Engineering

Piping Engineer

July 2012 - May 2013

DAEWOO ENGINEERING & CONSTRUCTION

India

July 2012 - May 2013

Company: DAEWOO ENGINEERING & CONSTRUCTION
Project: Sur Independent Power Plant (SurIPP) Project, Consulate of Oman
2000MW, two (2) 2-2-1 blocks & one (1) 1-1-1 block comprising five (5) gas turbine, five (5) HRSG & three (3) STG, Triple pressure (HP, IP & LP)
Date: 08 July 2012 - 11 May 2013
Position: Piping Engineer
Duty & Responsibility: ❖ Report directly to Piping Section Manager
❖ Area of responsibility - Closed Cooling System, Fire Protection System (above ground), Fuel Oil System, Black Start and Emergency Generators Closed Cooling Water and Fuel Oil Systems, HRSG interconnection piping, Temporary Auxiliary Cooling System
❖ Conduct coordination meeting with the implementing contractor regarding the execution of the project
❖ Observe work in progress to assure compliance with the piping standard
❖ Conduct daily inspection and monitor daily progress in terms of diameter-inch
❖ Keep daily progress report during all stages of construction and submit periodic progress accomplishment to Piping Section Manager
❖ Check and assist implementing contractor in preparation of hydro-test packages
❖ Supervise the implementing contractor from preparation to completion of hydro-test
❖ Mark boundary limits of fuel oil system P&ID for chemical flushing work. Plan the execution of work. Prepare schedule of temporary spools for fabrication, related accessory materials such as flanges, gaskets, bolt and nuts, supports. Supervise the removal of original pipeline and installation of temporary spools
❖ Monitor chemical flushing work progress
❖ Supervise the reinstatement of pipelines, valves, instruments after completion of flushing work

Company industry:
Construction & Building
Job role:
Engineering

Piping Engineer

July 2012 - May 2013

Daewoo Engineering & Construction

Sur, Oman

July 2012 - May 2013

the Project is 2000 MW combined cycle power plant, triple pressure (HP/IP/LP), two 2-2-1 blocks & one 1-1-1 block comprising of 5-HRSG, 5-GT & 3-STG

 Oversee the following system - closed cooling, fire protection (above ground), fuel oil, Black Start & Emergency Diesel Generator cooling& fuel system, temporary auxiliary cooling & HRSG interconnection piping
 Conduct coordination meeting with the implementing contractor regarding the execution of the project
 Mark boundary limits of Fuel Oil System P&ID for chemical flushing work. Plan the execution of work. Prepare schedule of temporary spools for fabrication and related accessory materials such as flanges, gaskets, bolt and nuts, supports. Supervise the removal of original pipeline, installation of temporary pipelines, supports and boundary blind flanges, and reinstatement including valves and instruments
 Oversee contractor in implementing works, preparation of hydro/pneumatic test packages and implementation
 Conduct daily inspection to generate daily/weekly status reports in terms of diameter-inch
 Interface with client, contractor and field inspectors on site

Company industry:
Construction & Building
Job role:
Engineering

Piping / Pre-Commissioning Engineer

July 2011 - April 2012

DAEWOO ENGINEERING & CONSTRUCTION

India

July 2011 - April 2012

Company: DAEWOO ENGINEERING & CONSTRUCTION
Consortium of DEC & Mitsubishi Heavy Industries
Project: Algeria Oman Fertilizer Plant (AOFP) Project, Bethiuoa, Oran, Algeria
Date: 15 July 2011 - 26 April 2012
Position: Piping / Pre-Commissioning Engineer
Duty & Responsibility: ❖ Report directly to Piping Section Manager
❖ Monitor and review completed and hydro-tested pipelines
❖ Prepare and mark boundary limits on P&IDs and related documents for approval & scheduling of steam flushing work
❖ Schedule and quantify temporary blank and blind plates, pipes and spools for fabrication and related accessory materials such as flanges, gaskets, bolt and nuts for steam flushing activities
❖ Line check pipeline ready for steam flushing, survey the area and plan how to transport bulk materials such as pipes, temporary spools and equipment
❖ Supervise the temporary removal prior to steam flushing and reinstatement after steam flushing of original spools and/or pipelines, valves and instruments
❖ Supervise the installation & removal after flushing of temporary spools and/or pipelines, supports and blind plates on boundary limits
❖ Coordinate to CCR and monitor on field the steam progress of flushing activities especially in warming-up stage of the pipelines. During warming-up of pipeline, prior to steam flushing, check pipeline for leak points, thermal expansion and abnormalities
❖ After steam flushing, conduct post inspection of pipelines when it is in cold state for further abnormalities including support clearances, movement of pipeline due to thermal expansion

Company industry:
Construction & Building
Job role:
Other

Piping / Pre-commissioning Engineer

July 2011 - April 2012

Daewoo Engineering & Construction

Oran, Algeria

July 2011 - April 2012

The Project is Algeria Oman Fertilizer

 Plan steam flushing work thru marking boundary limits on P&IDs
 Quantify and schedule temporary accessories for fabrication such as plates for blank and blind flanges, pipes and spools, pipe supports, gaskets, bolt and nuts for steam flushing activities
 Supervise the removal of original pipelines, installation of temporary pipelines, supports and boundary blind flanges, and reinstatement after steam flushing including valves and instruments
 Coordinate to DCS and local operators and monitor on field the progress of steam flushing activities especially in warming-up stage of the pipelines. Check pipeline for any leaks, thermal expansion and abnormalities
 Line check pipelines prior to and after steam flushing activity

Company industry:
Construction & Building
Job role:
Engineering

Piping Engineer

March 2010 - May 2011

DAEWOO ENGINEERING & CONSTRUCTION

India

March 2010 - May 2011

Company: DAEWOO ENGINEERING & CONSTRUCTION
Project: Benghazi Combined Cycle Power Plant (BCCPP) Project, Libya
750MW, one (1) 2-2-1 block comprising two (2) gas turbine, two (2) HRSG & one (1) STG, Dual pressure (HP & LP)
Date: 07 March 2010 - 04 May 2011
Position: Piping Engineer
(transferred as Commissioning Engineer after construction phase)
Duty & Responsibility as Piping Engineer: ❖ Report directly to Piping Section Manager
❖ Area of responsibility - BOP
❖ Conduct coordination meeting with the implementing contractor regarding the execution of the piping & support works
❖ Supervise work in progress to assure compliance on piping code and standard
❖ Review and conduct actual inspection of Field Change Request by implementing contractor for approval of Engineering Section or Piping Section Manager
❖ Keep daily progress reports and field change requests and submit periodic progress accomplishment to Piping Section Manager
❖ Prepare hydro-test packages and forward to implementing contractor for completion of documents and attachments such as insertion of daily welding reports, calibration certificate of test pressure gauges, etc.

Duty & Responsibility as Commissioning Engineer: ❖ Report directly to Commissioning (Mechanical) Manager
❖ Perform couple-test, take vibration, noise and temperature of BOPs rotating equipment such as HP/LP Feed Water Pumps, Service Water Pumps, Demi Water Pumps, Closed Cooling Water Pumps, Condensate Water Pumps, Water Box Vacuum Priming Pumps.
❖ Assist Fuji vendor for field cold commissioning of Steam Turbine Generator (STG) Lube Oil system such as listed below;
* Field test operation and check vibration, temperature and rotation speed of Main Oil Pumps (MOP), Jockey Oil Pumps (JOP - AC & DC), Emergency Oil Pumps (EOP - AC & DC)
* Nitrogen charging of Accumulator for Emergency Oil Pumps (EOP - AC & DC)
❖ Assist Fuji vendor for field cold commissioning of STG Control Oil system such as listed below;
* Field test operation and check vibration, temperature and rotation speed of Control Oil Pumps
* Nitrogen charging of Accumulator
❖ Assist Fuji vendor to adjust, calibrate and stroke test the Main Steam Stop Valves (HPSV - left & right), Main Steam Control Valves (HPCV), Admission Stop Valve (LPSV), Admission Control Valve (LPCV)
❖ Assist Fuji vendor to adjust and test engagement of lever in manual and automatic mode of turning device
❖ Adjust the throttle valves of STG Lube Oil supply lines to Steam Turbine thrust bearings as per specified by vendor
❖ Operate Lube Oil Purifier
❖ Regular monitoring of all BOP's equipment, piping system & HRSGs during steam blowing period
❖ Supervise the insertion & removal of steam blowing test plate including the safety execution of work as this is involve high temperature metal surfaces that cause possibility of high degree burn
❖ Coordinate with DCS operator all cold and hot commissioning works of various rotating equipment for the remote operation during logic test and interface test
❖ Uncouple & couple run test; take vibration, temperature & speed of rotating equipment such as Closed Cooling Water Pumps (CCWP), Cold Condensate Storage Tank Pumps (CCSTP), Condensate Extraction Pumps (CEP), Condensate Pre-heater Pumps (CPH), HP and LP feed water pumps (HP/LPFWP), Circulating Water Pumps (CWP) and Auxiliary Booster Pumps

Company industry:
Construction & Building
Job role:
Engineering

Piping Engineer transferred later as Commissioning Engineer

March 2010 - May 2011

Daewoo Engineering & Construction

Benghazi, Libya

March 2010 - May 2011

The Project is a 750 MW Benghazi Combined Cycle Power Plant dual pressure (HP/LP), one 2-2-1 block comprising 2-GT, 2-HRSG & 1-STG

as Commissioning Engineer
 Perform couple test with client of BOP rotating equipment such as HP/LP Feed Water Pumps, Service Water Pumps, Demi Water Pumps, Closed Cooling Pumps, Condenser Water Box Vacuum Priming Pumps, Condensate Extraction Pumps, Cold Condensate Storage Tank Pumps, Condenser Auxiliary Booster Pumps, Condensate Pre-heat Pumps and take testing record of vibration, temperature & rotation speed
 Assist Fuji Electric vendor for the following works:
- cold commissioning of STG Lube Oil System such as Main Oil Pumps, Jockey Oil Pumps (AC & DC), Emergency Oil Pumps, Fume Extractor Fans and charging nitrogen to accumulators; Control Oil System such as Control Oil Pumps & charging of nitrogen to accumulator
 - setting, adjustment and stroke testing of STG steam main stop valves (HPSV - left & right), steam main control valve (HPCV), steam admission stop valve (LPSV), steam admission control valve (LPCV)
 - adjustment of throttle valves of lube oil supply lines to STG trust bearings
 - setting and testing of turning device
 - adjust, calibrate and stroke test the Main Steam Stop Valves (HPSV - left & right), Main Steam Control Valves (HPCV), Admission Stop Valve (LPSV), Admission Control Valve (LPCV)
 - adjust and test engagement of lever in manual and automatic mode of turning device
 Adjust the throttle valves of STG Lube Oil supply lines to Steam Turbine thrust bearings as per specified by vendor
 Oversee the logic function test operation on field of STG Lube Oil System and Control Oil System
 Regular monitoring of all BOP’s equipment, piping system & HRSGs during steam blowing period
 Supervise the insertion & removal of test plates including safety implementation to prevent untoward high degree burn to workers during steam blowing phase
 Coordinate with DCS operator all cold and hot commissioning works of BOP rotating equipment for the remote operation during logic function test

Company industry:
Construction & Building
Job role:
Engineering

Warranty Engineer

March 2009 - March 2010

DAEWOO ENGINEERING & CONSTRUCTION

India

March 2009 - March 2010

Company: DAEWOO ENGINEERING & CONSTRUCTION
Project: Benghazi North Combined Cycle Power Plant (BNCCPP) Project, Libya
1500MW, two (2) 2-2-1 blocks comprising four (4) gas turbine, four (4) HRSG & two (2) STG, Dual pressure (HP & LP)
Date: 07 March 2009 - 03 March 2010
Position: Warranty Engineer
Duty & Responsibility: ❖ Report directly to Warranty Manager
❖ Receive, scan and control the Warranty Request from the client
❖ Investigate and confirm actual event of Warranty Request. Print out trend as one of reference for analysis.
❖ Submit observation report against respective warranty report issued by the client
❖ Check respective drawing to identify damage part or material, if there is any.
❖ Check material on stock for replacement
❖ Coordinate and discuss with DCS operation supervisor any repair works, take approval and schedule prior to start work
❖ Supervise replacement and maintenance works starting from system checking, isolation of pipelines and ensure rotating equipment is in racked-out condition prior to start work
❖ Supervise servicing and first operation of finished work; check and monitor the equipment operating condition
❖ Supervise pump alignment
❖ Maintain a systematic filing of all records and documents to ensures the confidentiality of all information, disclosed and made accessible to authorized persons with prior clearance from immediate superior
❖ Audit and control 2-year warranty spare parts; report shortage of materials for requisition
❖ Hand-over 2-year warranty spare parts as stated in the contract to the client
Company: AL-NASSAR Trading & Contracting Est., Al-Khobar, K.S.A.

Company industry:
Construction & Building
Job role:
Engineering

Warranty Engineer - Mechanical

March 2009 - March 2010

Daewoo Engineering & Construction

Benghazi, Libya

March 2009 - March 2010

The Project is a 1500 MW Benghazi North Combined Cycle Power Plant, dual pressure (HP/LP) two 2-2-1 block comprising 4-GT (existing), 4-HRSG & 2-STG

 Investigate and make observation report of Warranty Request. Print out trend for reference and analysis
 Check drawings to identify damage part or material, if there is any.
 Check material on stock for replacement
 Coordinate and discuss with DCS and local operation supervisor any repair works, take approval and schedule prior to start work
 Supervise replacement and maintenance works with reference drawings and maintenance manuals including safety measures such as racking out CB prior to start
 Supervise on line servicing and first operation of finished work; check and monitor the equipment operating condition
 Supervise pump alignment
 Maintain a systematic filing of all records and documents to ensures the confidentiality of all information, disclosed and made accessible to authorized persons with prior clearance from immediate superior
 Audit and control 2-year warranty spare parts; report shortage of materials for requisition
 Hand-over 2-year warranty spare parts as stated in the contract to the client

Company industry:
Construction & Building
Job role:
Engineering

Project Engineer

November 2006 - December 2008

Eastern Province

Saudi Arabia

November 2006 - December 2008

Project: exclusively for Saudi ARAMCO facilities, Eastern Province area
Date: 22 November 2006 - 02 December 2008
Position: Project Engineer
Other Position: Saudi ARAMCO Scaffolding Inspector
Duty & Responsibility: ❖ Report directly to Project Manager
❖ Manage the planning & execution of project
❖ Coordinate with Saudi ARAMCO Project Engineer all daily activities and progress of the project including testing and commissioning work
❖ Monitor daily work progress
❖ Ensure availability of materials on site to meet the project completion on time
❖ Testing and commissioning of completed system
❖ As Saudi ARAMCO Scaffolding Inspector, respond promptly to the call of any Saudi Aramco Contractor and Safety Officer/s for inspection of scaffolding

Company industry:
Industrial Production
Job role:
Engineering

Project Engineer

November 2006 - December 2008

Al-Nassar Trading & Contracting Est

Dammam, Saudi Arabia

November 2006 - December 2008

The establishment is a Saudi ARAMCO contractor.

Plant, direct and execution of work to meet project objectives
 Liaise with Saudi ARAMCO Project Engineer and its team member
 Provide inputs to and feedback on implementation of client’s Standards and procedures
 Assists clients in development and trouble shooting of their design while work in progress
 Interface with office based engineering staff, suppliers and client
 Monitor daily work progress
 Ensure availability of materials on site to meet the project completion on schedule
 Testing and commissioning of system
 As Saudi ARAMCO Scaffolding Inspector, respond promptly to the call of any Saudi Aramco Project Engineer, Contractor and Safety Officer/s for inspection of erected scaffolding

Company industry:
Construction & Building
Job role:
Engineering

Project-In-Charge

July 2001 - August 2003

MESAN Corporation

Philippines

July 2001 - August 2003

Company: MESAN Corporation, Makati, Manila, Philippines
Project: National Book Store Commercial Center Phase-II, Quezon City, Manila
Date: July 2001 - August 2003
Position: Project-In-Charge
Duty & Responsibility: ❖ Plan and prepare work schedule and activities using Gantt Chart (Bar Chart)
❖ Organize manpower structure
❖ Supervise and delegate subordinates to their respective work
❖ Monitor and evaluate actual progress against the scheduled plan
❖ Analyze project cash flow against material delivery & projected accomplishment
❖ Prepare monthly accomplishment report

Job role:
Engineering

Project-In-Charge

July 2001 - August 2003

MESAN Corporation

Philippines

July 2001 - August 2003

The Project is National Book Store Commercial Center Phase-II
 Plan, direct and execute work, including delegating manpower, equipment and materials to meet project objectives
 Provide input to and feedback to contractors on implementation of standards and procedure
 Interface with office based engineering staff, contractors and client on site
 Monitor and evaluate actual progress against the scheduled plan
 Analyze project cash flow, material availability and projected accomplishment
 Prepare monthly accomplishment report

Company industry:
Construction & Building
Job role:
Management

Construction Manager

February 2000 - June 2001

MESAN Corporation

Philippines

February 2000 - June 2001

Company: MESAN Corporation, Makati, Manila, Philippines
Project: Land Bank of the Philippines (34-storey building), Taft Avenue, Manila
Date: February 2000 - June 2001
Position: Construction Manager
Duty & Responsibility: ❖ Plan and prepare work schedule of fabrication and installation using PERT-CPM
❖ Organize manpower structure
❖ Supervise and delegate subordinates to respective work
❖ Monitor and evaluate actual progress against the scheduled plan
❖ Monitor, evaluate & plan the material availability and delivery on site
❖ Prepare monthly accomplishment report

Job role:
Engineering

Construciton Manager

February 2000 - June 2001

MESAN Corporation

Philippines

February 2000 - June 2001

The Project is Land Bank Of the Philippines (34-storey building)

 Plan, direct and execute work, including delegating manpower, equipment and materials to meet project objectives
 Interact with sub-contractors in implementing works during construction phase
 Monitor and evaluate actual progress against the scheduled plan and availability of materials
 Prepare daily/weekly/monthly accomplishment report

Company industry:
Construction & Building
Job role:
Management

Project-In-Charge

May 1998 - January 2000

MESAN Corporation

Philippines

May 1998 - January 2000

Company: MESAN Corporation, Makati, Manila, Philippines
Project: De la Salle College University (DLSU) - College of Saint Benilde
Angelo King International Center (12-storey building), Taft Avenue, Manila
Date: May 1998 - January 2000
Position: Project-In-Charge
Duty & Responsibility: ❖ Plan and prepare work schedule and activities using Gantt Chart (Bar Chart)
❖ Organize manpower structure
❖ Supervise and delegate subordinates to their respective work
❖ Monitor and evaluate actual progress against the scheduled plan
❖ Analyze project cash flow against material delivery & projected accomplishment
❖ Prepare monthly accomplishment report

Job role:
Engineering

Project-In-Charge

May 1998 - January 2000

MESAN Corporation

Philippines

May 1998 - January 2000

The Project is De la Salle College University (DLSU) - College of Saint Benilde, Angelo King International Center (12-storey Building)

 Plan, direct and execute work, including delegating manpower, equipment and materials to meet project objectives
 Provide input to and feedback to contractors on implementation of standards and procedure
 Interface with office based engineering staff, contractors and client on site
 Monitor and evaluate actual progress against the scheduled plan
 Analyze project cash flow, material availability and projected accomplishment
 Prepare monthly accomplishment report

Company industry:
Construction & Building
Job role:
Management

Project Site Engineer

November 1996 - May 1998

MESAN Corporation

Philippines

November 1996 - May 1998

Company: MESAN Corporation, Manila, Philippines
Project: Splash Island Ecocentrum, Biῆan, Laguna, Philippines
Date: November 1996 - May 1998
Position: Project Site Engineer


Duty & Responsibility: ❖ Prepare shop drawing submittals for approval of Mechanical Project Designer & Consultant prior to installation
❖ Prepare technical material & equipment submittals for approval of Mechanical Project Designer & Consultant
❖ Monitor availability of materials on site
❖ Prepare thick marking for as-built drawings

Job role:
Civil Engineering

Project Site Engineer

November 1996 - May 1998

MESAN Corporation

Philippines

November 1996 - May 1998

The Project is Splash Island Ecocentrum

 Prepare shop drawing submittals for approval of Mechanical Project Designer & Consultant prior to installation
 Prepare technical material & equipment submittals for approval of Mechanical Project Designer & Consultant
 Interact with sub-contractors in implementing standards and procedure
 Thick markings site changes on drawings for as-built drawings
 Assist Project Engineer and office engineering staff in trouble shooting design, identifying and resolving issues on fabrication and installation by raising and Site/Technical Queries

Company industry:
Construction & Building
Job role:
Civil Engineering

Mechanical Engineer

March 1994 - November 1994

AL-SWAYEH Co. Ltd

March 1994 - November 1994

Company: AL-SWAYEH Co. Ltd, Riyadh, K.S.A.
Date: March - November 1994
Position: Mechanical Engineer
Duty & Responsibility: ❖ Prepare detailed material estimate for HVAC, Fire Fighting/Protection, Piping, Plumbing and Sanitary System
❖ Conduct inspection of mechanical equipment, controls & all mechanical related items prior to and upon delivery on site
❖ Assist site project team in technical installation of mechanical equipment/unit

Company industry:
Construction & Building
Job role:
Mechanical Engineering

Mechanical Engineer

March 1994 - November 1994

Al-Swayeh Co. Ltd.

Khobar, Saudi Arabia

March 1994 - November 1994

 Prepare detailed material estimate for HVAC, Fire Fighting/Protection, Piping, Plumbing and Sanitary System
 Conduct inspection of mechanical equipment, controls & all mechanical related items prior to and upon delivery on site
 Interface with site project team in technical installation of mechanical equipment

Company industry:
Construction & Building
Job role:
Mechanical Engineering

Education

University of San Agustin

March 1990

March 1990

Bachelor's degree, Mechanical Engineering

Philippines

Philippines Licensure Examination for Mechanical Engineer board passer, April 1990, 82%

University of San Agustin

January 1990

January 1990

Bachelor's degree, MECHANICAL ENGINEERING

❑ Bachelor of Science in MECHANICAL ENGINEERING (BSME), 1985-1990 University of San Agustin, Iloilo City, Philippines ELIGIBILITY:

Skills

AutoCAD
Expert
AutoCAD
Expert
Mechanical Testing
Expert
Mechanical Testing
Expert
Piping
Expert
Piping
Expert
Computer Skills
Expert
Computer Skills
Expert
Scaffolding
Expert
Scaffolding
Expert
CASH
Expert
CASH
Expert
ENGINEER
ENGINEER
GANTT
Expert
GANTT
Expert
GAS TURBINE
Expert
GAS TURBINE
Expert
HRSG
Expert
HRSG
Expert
INSPECTION
INSPECTION
LP
Expert
LP
Expert
PIPING
Expert
PIPING
Expert
PROGRESS
Expert
PROGRESS
Expert
TURBINE
Expert
TURBINE
Expert
autoCADD
Expert
autoCADD
Expert
AutoCAD
Expert
AutoCAD
Expert
Mechanical Testing
Expert
Mechanical Testing
Expert
Piping
Expert
Piping
Expert
Computer Skills
Expert
Computer Skills
Expert
Scaffolding
Expert
Scaffolding
Expert

Languages

English

Beginner

Tagalog

Beginner