ELECTRICAL & INSTRUMENTION SUPERVISOR
MOHAMMAD AL-MOJIL GROUP
Total years of experience :17 years, 2 Months
COMPANY: MOHAMMAD AL-MOJIL GROUP MMG
Project: Manifa core hydrocarbon facilities project
Year: 2009 up to Present
Position: ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Man power management, Assist &Supervision of work.
2. Fabrication of Transmitter stanchion.
3. Installation of panel boards and control panels.
4. Cable layout, glanding and termination of power & Control cable.
5. E/I material controller
6. Perform commissioning works (loop checking and troubleshooting)
7. Perform other required duties as maybe assigned by immediate superior or department head.
COMPANY: MOHAMMAD AL-MOJIL GROUP MMG
Project: Daniele Project
Year: 2008 to 2009
Position: ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Man power management, Assist & supervision of work.
2. Cable Tray installation, Cable pulling.
3. Installation of panel boards and control panels.
4. Conduit &cable try installation
5. Assist high voltage termination.
6. Perform commissioning works (loop checking and troubleshooting)
7. Perform other required duties as maybe assigned by immediate superior or department head.
COMPANY: MOHAMMAD AL-MOJIL GROUP MMG
Project: IBN Rush Petrochemical
Year: 2007 to 2008
Position: ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Man power management, Assist & supervision of work.
2. Installation of pressure transmitter, pressure indicator, temperature indicator & termocopol.
3. Cable layout, glanding and termination of instrument cable.
4. Supervision, assist for termination of 13.8kv cable.
5. Perform commissioning works (loop checking and troubleshooting)
6. Perform other required duties as maybe assigned by immediate superior or department head.
COMPANY: MOHAMMAD AL-MOJIL GROUP MMG
Project: Linarco Project
Year: 2005 to 2006
Position: ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Man power management. Assist & supervision of work
2. Fabricate cable tray ladder & ferporeted type.
3. Installation 13.8kv transformer bus duct & bus bar
4. Cable layout, glanding and termination.
5. Assist high voltage termination.
6. Perform commissioning works (loop checking and troubleshooting)
7. Perform other required duties as maybe assigned by immediate superior or department head.
COMPANY: MOHAMMAD AL-MOJIL GROUP MMG
Project: Jueg 2 Petrochemical Project
Year: 2004 to 2005
Position: ELECTRIAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Man power management, Assist & supervision of work.
2. Repair power tools, such us pistol drill, angle grinder, magnetic drill & speed cutter.
3. Installation of panel boards and control panels.
4. Cable layout, glanding and termination of power cable.
5. Assist & supervision for termination of 13.8 high voltage cables.
6. Perform other required duties as maybe assigned by immediate superior or department head.
7. Perform commissioning works (loop checking and troubleshooting)
COMPANY: MOHAMMAD AL-MOJIL GROUP MMG
Project: Offshore Abusafa Oilfield Project
Year: 2003 to 2004
Position: ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Man power management, Assist & supervision of work.
2. Installation of instrument junction box & instrument air manifold
3. Installation of panel boards and control panels.
4. Cable layout, glanding and termination.
5. Assist high voltage termination.
6. Perform commissioning works (loop checking and troubleshooting)
7. Perform other required duties as maybe assigned by immediate superior or department head.
COMPANY: EEI CORPORATION / AL RUSHAID CONSTRUCTION LTD.
Project: BERRI Gas Plant (Saudi Arabia)
Year: April 22, 2001 to July 29, 2002
Position: ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Fabricate of cable raceways.
2. Installation of panel boards and control panels.
3. Cable layout, glanding and termination of power cable
4. Assist high voltage cable termination.
5. Perform commissioning works (loop checking and troubleshooting)
6. Perform other required duties as maybe assigned by immediate superior or department head.
COMPANY: EEI CORPORATION / SAUDI ARABIAN BECHTEL COMPANY
Project: Power Desalination Plant (SWSS - Saudi Arabia)
Year: October 11, 1999 to December 9, 2000
Position: ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Fabricate, cable tray ladder type and termination of instrument cable
2. Installation of panel boards and control panels.
3. Cable layout, glanding and termination.
4. Assist high voltage cable termination.
5. Perform commissioning works (loop checking and troubleshooting)
6. Perform other required duties as maybe assigned by immediate superior or department head.
COMPANY: EEI CORPORATION / QMM PROJECT MESAIEED
Project: Qatar Methanol / MTBE Facility Project
Year: July 22, 1998 to March 29, 1999
Position: ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Fabricate ferporeted type of cable tray.
2. Installation of Electrical panel boards and switch gear panels.
3. Cable try layout, glanding and termination of control & power cable.
4. Assist high voltage termination.
5. Perform commissioning works (loop checking and troubleshooting)
6. Perform other required duties as maybe assigned by immediate superior or department head.
COMPANY: EEI CORPORATION - MASENLOC ZAMBALES
Project: Masenloc Power Plant
Year: June 20, 1997 to March 13, 1998
Position ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Fabricate cable box and termination of power cable.
2. Installation of mcc panel boards and control panels.
3. Cable layout, glanding and termination.
4. Assist high voltage termination & lighting installation.
5. Perform commissioning works (loop checking and troubleshooting)
6. Perform other required duties as maybe assigned by immediate superior or department head.
COMPANY: EEI CORPORATION - BATANGAS CITY
Project: Caltex Refinery
Year: April 17, 1997 to June 13, 1997
Position: ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Fabricate and installations of cable tray support.
2. Installation of panel boards and control panels.
3. Cable tray layout, glanding and termination power cable.
4. Tubing installation from instrument air manifold to pneumatic valve.
5. Perform commissioning works (loop checking and troubleshooting)
6. Perform other required duties as maybe assigned by immediate superior or department head.
COMPANY: EEI CORPORATION - BATANGAS 2 MARIVELES, BATAAN
Project: Petrochemical Corporation
Year: May 13, 1996 to April 15, 1997
Position: ELECTRICAL & INSTRUMENTION SUPERVISOR
Job Description: 1. Termination of power & instrument cable.
2. Installation conduit, cable pulling of power cable.
3. Cable layout, glanding and termination of control cable.
4. Assist high voltage cable termination.
5. Perform commissioning works (loop checking and troubleshooting)
6. Perform other required duties as maybe assigned by immediate superior or department head.
On-the-job Training
ELECTRICAL & INSTRUMENT SUPERVISOR
PENINSULA ELECTRIC POWER COOPERATIVE,
Power Substation and Sub transmission Department
April 13, 1983 to May 19, 1983
o Substation maintenance including cable termination.
College: Bataan Polytechnic State University (Main Campus) - Capitol Drive Balanga, Bataan Bachelor of Science in Electrical Engineering (1979-1983) High School:
Limay National High School - Roman Highway Limay, Bataan Graduated Honorable Mention; (1975-1979) Elementary:
Riverside Elementary School - Agusan Del Norte Graduated (1968-1974)