Production Engineer
BAKER HUGHES
Total years of experience :14 years, 10 Months
Installation of Artificial Lift Systems (Electrical submersible pumps).
* Monitoring of daily well production data for optimization and ESP performance.
* Flow Test and Commissioning of production wells.
* Troubleshooting of ESP surface and downhole equipment.
* AutographPC simulation for ESP design, history matching and production reports.
* Analysis of downhole production parameters (pressure, temperature, frequency,
vibration, current, voltage) using Ambit and Well Link satellite remote system
* Technical presentation to clients on Artificial Lift products, services and
application.
* Inventory Management using SAP (Artificial Lift inventory Master list, quarterly
circle count
Assists in the development of safe system of work
* Arranges for safety committee meetings
* Tool box meetings, ensures the issuance of Permit to Work (PTW) before the
commencement of ALL jobs.
* Documentation of every safety process/procedure instructions given
* Ensures PPEs are used according to Safety Standard
* Safety Induction for newly recruited staff members
* Prepares and takes part in weekly safety meetings
* Training and refreshers in-house training, as well as ensures the duty of care.
* Monitors operations to ensure compliance with safety policy
Improved and implemented quality management system structure that achieved
effective targets and management objectives, procedures and work processes
meeting standards and policy security requirements.
* Reported and liaised with EHS Line Manager on HSE issues and work
requirement in respect to team assignment.
* Issue and inspect permit to work (PTW) system areas including the use of
appropriate PPE for the task.
Responsible for project initiations and pursuit
* JHA/JRA of all work sites
* Project profitability analysis
Liaised with Tax Operations Group for tax collation.
* Tax enforcement and drive within and outside the FCT
* Responsible for NYSC Tax/FIRS CDS group in the FCT
* Prepares the Regional Enlarged Management Meeting (REMM) Speech for CD/TOG
OERL) EBOK-14 ESP
well
* Re-Installation (workover) of EBOK-14 ESP well.
* Replacement of OERL EBOK-39 ESP Surface cable
* Flow test and troubleshooting of SEPLAT PETROLEUM OBEN WELL 23 ESP
downhole
* Pulling and replacement of surface cables on ALL ESP wells at NAOC (Agip)
Samabri field
* Installation of wireless mono transmitters and Zencus system ESP wells at NAOC
(Agip) Samabri field
* Installation of SE-5T ESP well at NAOC (Agip) Samabri field
Soil and Water (Construction) Engineering, * Second Class Upper Division Dissertation: Design and construction of sprinkler irrigation system.