Roles and Responsibilities:
Detailed planning on site and ongoing follow up and modification to master plan.
Assessment of contractor planning. Coordination of subcontractor construction activities.
Duties and responsibilities include:
-Manage and coordinate the assignments of work with Engineering, Procurement
-Construction/Production on measurement metrics and progress measurement
-Provides and coordinates the construction planning and scheduling systems, work processes and reports needed to support construction management efforts of the projects.
-Provide functional and management support of related controls activities including project baseline schedules, man-hour budgets, project code of accounts, critical path analysis manpower planning and forecasting, progress validation, earned value assessment, performance measurement.
-Prepare Level 5 System Schedule and monitor.
-Evaluate the Schedule Status if attain the Work Performance based on Productivity, SPI and Earned Value. Recommend Periodic Forecast and KPI to achieve the Milestone Date.
-Prepare the Daily Accomplishment Report, Flash Report, Schedule Analysis and Status Evaluation.
-Does the Monthly Schedule Update of POC on Citrix.
-Participate in the daily construction meeting.
-Prepare the Project Close Out Report
SOFCON Engineering & Consulting Company
P.O. Box 3998, Al Khobar 31952 KSA
December 12, 2012 to December 11, 2014
Lead Planner/Scheduler (FWAPEC)
Foster Wheeler & SOFCON (JV)
Working on extremely high-budget and high profile projects, to take a hands-on role in schedule development, maintenance and monitoring activities to support project objectives. Supervise and provide technical direction for planning/scheduling activities of EPC contractors through proactive use of planning and scheduling resources while ensuring effective change management. Play a key role in managing construction work on site and therefore require capacity and insight for directing construction activities. Involve in the preparation of planning package/PMS, implementation/supervision of Planning/Scheduling & Monitoring of the following Projects.
•Foster Wheeler & Partners (FWAPEC - FW & SOFCON- JV)
•Saudi Aramco Fadhili Gas Program FEED Grass Root Project
(214100)
•Saudi Aramco/Sumitomo Chemicals
•Rabigh Phase II Non Process Buildings (212121-1)
•Saudi Aramco
•Upgrade of 36 Substation in North & South Ghawar Area
(213108)
•SABIC
•Al-Bayroni Power Downstream Enhancement Project (213115-1)
•AMANA Dammam Municipality - Bridges & Underpass Division (212137) As a PMC.
•Construction of Flyover and Underpass at the intersection of P. Metab with P. Nayeb & Othman Street.
•Improvement of Road Intersection K. Abdullah, K. Abdul Aziz, Al Khobar, Construction 3 Level Interchange Underpass, Overpass Roundabout with Allied Works.
Duties and responsibilities include:
•Prepare and monitor the PMS and Level 2 FEED Schedule of Fadhili Gas Plant Program Project (BI-001900, BI-001901, BI-001905, BI-001906).
•Develop the EPC Level 3 Schedule of Fadhili Gas Plant Program Project.
•Oversee the preparation and maintenance of the Project Schedule in P6 and various Area Coordination Schedules for the Project.
•Lead the monitoring, reviewing and analysis of the schedule and
status of Contractor during all phases of the project, including the
analysis of any schedule deviations and corrective actions.
•Review contractor Planning Package, P6 schedule provided in
Primavera and ensure contractor plans are realistic and achievable.
•Analyze progress manpower and commodity information to support
effective project management.
•Assist in identifying the scope associated with schedule activities.
•Report Schedule deviations proactively on assigned tasks related
to discipline or specialty and complete preparation of Planning
Package & PMS.
•Takes lead in developing specific project codes of accounts and
recommends appropriate modifications and revisions.
•Understand various technical documents (w.r.t. quantity takeoffs
etc. and activity sequencing related to engineering procurement and
construction.
•Evaluate the Schedule Status if attain the Work Performance based
on Productivity, SPI and Earned Value. Recommend Periodic
Forecast and KPI to achieve the Milestone Date.
•Participate in the Weekly Coordination meeting with Client, PMT
and Contractor.
Provide overall project schedule, progress measurement and change management leadership and expertise. Support PMT and Cost Stewards with project cost and schedule analysis, reporting, forecasting, budgeting and Change Management. Monitoring and appraising the performance of Subcontractor’s Site in the areas of cost, progress and schedule. Maintain regular contact with cost and schedule organization in the sub-project teams and with the company.
Duties and responsibilities include:
• Maintain close liaison with member of the sub-project services organization.
• Coordinate, monitor and assess subcontractor’s efforts in project planning, sampling to assure quality.
• Monitor and report on schedule implications of changes.
• Examine and evaluates the subcontractor’s schedule control organization, plans performance and procedure.
• Provide direction and feedback to Sub-Project planning and control engineers on schedule aspects of the project.
• Prepare the Planning Package
• Evaluate the Schedule Status if attain the Work Performance based on Productivity, SPI and Earned Value. Recommend Periodic Forecast and KPI to achieve the Milestone Date.
• Prepare the Flash Report & Work Performance Report, Weekly Report, Monthly Report and Monthly Slide Presentation, and participate the weekly and monthly progress meeting with client and subcontractors.
• Prepare the Project Close-Out Report
Identify and evaluate the project scope and develop a scope management plan. Develop work breakdown structure as per the guidelines specified in company/company URS. Create an activity listing as an extension of WBS and construct a project network diagram based on project execution strategy for logical activity sequencing. Identify physical resources available on the project including contracted resources. Develop a responsibility assignment matrix and allocate the resources to the activities based on the resources management plan.
Duties and responsibilities include:
• Develop a project schedule based on the work execution planning using sequencing and activity duration estimates.
• Determine inputs to the project schedule develop process, during phases i.e, Engineering/Procurement/construction/Precommissioning/Commissioning and Start-Up.
• Manage task time frames, project schedule deliverables, completion dates and all deadlines.
• To assign budget man-hours /standard measuring units/ revenue allocated for performing each task /deliverable within elements of the WBS.
• Prepare / update Schedule and Progress Measurement System for all discipline.
• Prepare weekly, schedule forecast, progress slippage analysis.
• Prepare weekly and monthly progress report.
Perform, coordinate and compile cost and planning activities and provide support to the Project Manager and Project Control including planning, scheduling, progress reporting, forecasting and independent progress verifications checks of performance of work as well as capturing project risks impacts in the project cost and schedule.
Involved in the Planning/Scheduling, Estimates and Implementation of the following awarded project.
• Saudi Aramco.
• Maintain Potential. (Wellhead Platform / Central Processing Platform)
• Shedgum - Uthmaniyah: 42” x 80 KM Seawater PL.
• ABQ PL Upgrade for Area Classification Compliance Phase II
Duties and responsibilities include:
• Attend job explanation meeting, site visit, record significant and acquaints with the changes occurring on site.
• Prepare an estimate for Piping/Mechanical, Civil and Structural works.
• Send quotation request to vendor/materials supplier and subcontractor.
• Planning and scheduling (establish and develop the project structure/Resource Loaded-Level III to VI) of tender proposals of Saudi Aramco and other clients using Primavera 3.
• Developing and up-keeping of an integrated master project schedule/plan and/or cost plan
• Support for project bench marking activities for the project plans and resource plan
• Liaise with the project team to monitor progress, identify variances and recommend recovery actions
• Prepare a standard routine weekly progress report.
• Prepare detailed monthly cost and schedule reports and analysis.
• Work closely with the project teams to monitor Management of Change process, identify cost and/or schedule impacts of proposed changes and incorporate those impacts into the Project Work Plan.
• Upon completion of project, prepare detailed Close-Out Cost Reports per the Process Guidelines. This is mainly an analysis comparison report between the various estimates produced for a given project.
Prepare / update Schedule and Progress Measurement System for all discipline.
• Prepare weekly, schedule forecast, progress slippage analysis.
• Prepare weekly and monthly progress report.
• Prepare billing / invoice report.
• Contract control, manage sub-contractors and suppliers.
Six (6) years experience in project planning, scheduling, estimating and monitoring, and control . Tracking progress man-hours and cost as compared to schedule and coordinates with Saudi Aramco Project Management Team as to documentation for the completion and closeout of the projects. Involved in the Planning/Scheduling, Estimates and Implementation of the following awarded project.
Saudi Aramco.
•Maintain Potential.
•Hawiyah/Uthmaniyah/Haradh 63 Wellhead Khuff Gas.
•Shedgum 3-Wellhead Gooseneck Modification UGOP.
• Emergency Isolation Valves & Process Fired Heaters Safety Upgrade at Jeddah Refinery.
Petrokemya.
• Juaymah - Jubail RC: 24” x 70 KM Olefins III Profane Feedstock PL.
SEC (Saudi Electric Company)
•Riyadh PP9 Fuel Gas.
ABV Rock Group
•Triple SP Project Site 3 - 12” x 148 KM Buraidah-Qassim PL
•Triple SP Project Site 7 - 14” x 157 KM Madinah-Yanbu PL.
Duties and Responsibilities include:
•Attend job explanation meeting, site visit, record significant and acquaints with the changes occurring on site.
•Prepare an estimate for Piping/Mechanical, Civil and Structural works.
•Send quotation request to vendor/materials supplier and subcontractor.
•Planning and scheduling (establish and develop the project structure/Resource loaded-Level III to VI) of tender proposals of Saudi Aramco and other clients using Primavera 3.
•Prepare and maintain planning & scheduling documents consisting of CPM schedules, reports, S-Curves charts, manpower histogram, drawing control, spreadsheets and other control tools.
•Prepare a standard routine weekly progress report.
•Prepare weekly and monthly overall summary project status reports
•Prepare weekly long-term resource requirement reports.
•Participate in meetings with Heads of Dept., Project Managers, Clients and third parties to communicate and clarify planning and scheduling requirements.
• Prepare Program of Works.
• Does the quantity take-off and estimate the volume of works.
• In-charge in the supervision of both fields and fabrication activities.
• Delegates responsibilities of construction to subordinates and maintain direct supervision.
• Give an assignment to each individual according to their category.
• Prepare work acceptance report.
• Attend job explanation meeting, site visit, inspect and acquaints with the changes
occurring on site.
• Prepare the materials take-off for the proposed project.
• Estimates the cost of the proposed project.
• Prepare the CPM and GANTT CHART schedule.
• Prepare the manpower loading based on the schedule and activities.
• Send quotation request to supplier to up-date the cost of the materials necessary for the proposed project.
• Review Service Order and Short Form Contract received to ascertain the accuracy of this
if conform to General Contract.
•Assigned in Aramco and Riyadh Refinery (SAMAREC) project for tracking and monitoring the work.
•Monitor work programs and assure all works done are within the scope of work. Works not included will be punch-listed for cost estimates and change order be requested.
•Compute the materials to be used and does cost comparison between projects materials cost.
•Prepare work schedule as requested weekly progress report and it will be based on the Master Schedule.
•Does the actual measurement and prepare the Repair Works envisioned by the proponent of the project.
B.S. Civil Engineering