OHL/Tech Linesmen
Gammon E&M Limited
Total years of experience :7 years, 11 Months
Construction of Tower Reconductoring, Strenghtening and Tower Paint undercoat and top coat etc.
Transmission Maintenace of 69kv, 115kv, 230kv and 500kv line etc.
Before work in Transmission Line need to sign the PTW and tool box talk, install of demarcation lifting zone and danger zone of Poles and Tower Lines example pole erection, excavation, pole hauling, pole sitting, pole dressing, installation of guying side guy, line guy and bayonet.