Cost Control Engineer
PGN Perkasa (Seconded Pertamina Gas)
مجموع سنوات الخبرة :18 years, 6 أشهر
Project Rokan Block, Riau, Sumatra, Indonesia
Interim Measure (IM) Taskforce - HIS (Hydrocarbon Impacted Soil)/Enviromental.
Project : Material Cost Platform & Jacket PECIKO-8B, Jacking Beam Extension for Platform, Development Well Connection 2020 - 2022, Project Management Cost of BEKAPAI-2B, Fabrication & Installation Cost of Replacement Existing Pipe by New Pipe Dia. 2 Inch along 500 Meter with Same Carbon Steel, Re-routing Flow Line MD-102 (East Mandu Field Offshore), Fresh Water Pipe Suction Line Modification in SPU Field, HCA Field Drain Piping CS Replacement, HCA Field Drain Piping SS Replacement, HCA Fire Gas Upgrade to SS, Installation FE on Adj. Well TN-S21.
Project : PLTU 2 x 10 MW, Bima, NTB, Indonesia
Project : Offshore EPC-Ande-ande Lumut, Offshore EPC-MDK Development, Offshore EPC-SP Field New Development, Offshpre LPG FSO Gas Concord Decommisioning, EPC-SPL Balongan & EPC-Pipe Gas Pusri- Grissik Pipeline, Power & Petrochemical : CCPP Jawa-2 1 Unit x 800 MW, Client: HDEC Ltd, Tanjung Priok, Jakarta; EPC-2 x 25K MT - NH3 Tank, Bintulu, Serawak, Malaysia; RAPID 6A (LLDPE), Client : JGC, Pengerang, Johor, Malaysia; RAPID 6A, Client: Samsung, Pangerang, Johor, Malaysia; RAPID 11, Client: Samsung, Pangerang, Johor, Malaysia, Plant KAN-AMNIT, Client: KAN, Bontang, Kaltim, Indonesia.
Project LPG FSO Gas Concord Offshore Decommissioning
Project :EPC3 Exxon Mobile (EMCL) - Offshore Mooring Tower & Pipeline
Project: Eastern Hub Mercury Removal (EHMR) Platform Belanak
Project:
Mechanical - Power Plant 1 x 600MW, Mundu Coast, Cirebon
Berthing Platform Gorgon, Chevron Australia Pty Ltd - Al Wasith Construction Platform Hasbah & Arabiyah - Saudi Aramco.
Structural; Murphy Kikeh Phase II, East Malaysia, Client: Murphy Sabah Oil Oil Co Ltd. JKV JV Inpex Ichthyts Onshore Modules, Australia, Client: Inpex Australia Pty Ltd. Offshore Fabrication PAR & Slug Catcher PAU Gorgon, Client: Chevron Australia Pty Ltd. Gorgon Upstream Fab. of Structure Vetcogray, Client : Chevron Austrlia Pty Ltd.
Piping & Structural - Esso KTT Turrum Phase 2, Client: Esso Australia Pty Ltd.
Hull 8158, DSV4 & Hull 8191 DSV5 Super Heavyweight Vessel in each of LOA: 180M, Client: Coast Line Maritim, Pte. Ltd. Singapore - Hull 8184 & Hull 8185, AHTS No Name LOA : 75M, Hull 8186, Hull 8187 & Hull 8188 AHTS No Name LOA: 65M, Client: Bumi Armada Navigation Sdn. Bhd., Malaysia.
Project:
MV Oxtende Max Cargo, LOA : 225M Repair, Client : Enterprises Shipping & Trading SA, Greece & Etc.
Project :
WB 3921 Repair, Client: Ch. Ship Management Pte. Ltd. Singapore; H-7034 Shipbulding - AHSV No. Name 60 M (6000 HP), Client: OSM Management Pte. Ltd. - Bollard Pull Test - Cutting Plate - Bending Plate - Rolling Plate & Etc.
Modelling Current Pattern of Water on around dome and cubes of Artificial Reef