Work Experience

Total years of experience :18 years, 6 Months

Cost Control Engineer at PGN Perkasa (Seconded Pertamina Gas)
  • Indonesia - Jakarta
  • My current job since July 2020

Project Rokan Block, Riau, Sumatra, Indonesia

Cost Control Supervisor at Singgar Mulia & Brown-Roots (SMBR) Seconded Chevron Pasific Indonesia
  • Indonesia - Pekanbaru
  • November 2019 to June 2020

Interim Measure (IM) Taskforce - HIS (Hydrocarbon Impacted Soil)/Enviromental.

Cost Estimator at Paras Megah Utama (PMU, Seconded Pertamina Hulu Mahakam
  • Indonesia - Balikpapan
  • November 2018 to October 2019

Project : Material Cost Platform & Jacket PECIKO-8B, Jacking Beam Extension for Platform, Development Well Connection 2020 - 2022, Project Management Cost of BEKAPAI-2B, Fabrication & Installation Cost of Replacement Existing Pipe by New Pipe Dia. 2 Inch along 500 Meter with Same Carbon Steel, Re-routing Flow Line MD-102 (East Mandu Field Offshore), Fresh Water Pipe Suction Line Modification in SPU Field, HCA Field Drain Piping CS Replacement, HCA Field Drain Piping SS Replacement, HCA Fire Gas Upgrade to SS, Installation FE on Adj. Well TN-S21.

Cost Control Engineer at Rekadaya Elektrika
  • Indonesia - Jakarta
  • August 2017 to November 2018

Project : PLTU 2 x 10 MW, Bima, NTB, Indonesia

Cost Estimator at Rekayasa Industri (REKIND)
  • Indonesia - Jakarta
  • January 2014 to July 2017

Project : Offshore EPC-Ande-ande Lumut, Offshore EPC-MDK Development, Offshore EPC-SP Field New Development, Offshpre LPG FSO Gas Concord Decommisioning, EPC-SPL Balongan & EPC-Pipe Gas Pusri- Grissik Pipeline, Power & Petrochemical : CCPP Jawa-2 1 Unit x 800 MW, Client: HDEC Ltd, Tanjung Priok, Jakarta; EPC-2 x 25K MT - NH3 Tank, Bintulu, Serawak, Malaysia; RAPID 6A (LLDPE), Client : JGC, Pengerang, Johor, Malaysia; RAPID 6A, Client: Samsung, Pangerang, Johor, Malaysia; RAPID 11, Client: Samsung, Pangerang, Johor, Malaysia, Plant KAN-AMNIT, Client: KAN, Bontang, Kaltim, Indonesia.

Cost Control Engineer at Rekayasa Industri (REKIND)
  • Indonesia - Jakarta
  • August 2016 to June 2017

Project LPG FSO Gas Concord Offshore Decommissioning

Cost Control Engineer at Rekayasa Industri (REKIND)
  • Indonesia - Jakarta
  • February 2014 to February 2015

Project :EPC3 Exxon Mobile (EMCL) - Offshore Mooring Tower & Pipeline

Cost Control Engineer at Timas Suplindo
  • Indonesia - Jakarta
  • September 2012 to December 2013

Project: Eastern Hub Mercury Removal (EHMR) Platform Belanak

Mechanical Estimator at Cirebon Electric Power
  • Indonesia - Cirebon
  • February 2012 to August 2012

Project:
Mechanical - Power Plant 1 x 600MW, Mundu Coast, Cirebon

Quantity Surveyor Production Planning Control (PPC) at Saipem Indonesia Karimun Branch (SIKB)
  • Indonesia - Tanjungbalai
  • May 2011 to February 2012

Berthing Platform Gorgon, Chevron Australia Pty Ltd - Al Wasith Construction Platform Hasbah & Arabiyah - Saudi Aramco.

Piping & Structural Estimator at McDermott Indonesia
  • Indonesia - Batam
  • November 2010 to May 2011

Structural; Murphy Kikeh Phase II, East Malaysia, Client: Murphy Sabah Oil Oil Co Ltd. JKV JV Inpex Ichthyts Onshore Modules, Australia, Client: Inpex Australia Pty Ltd. Offshore Fabrication PAR & Slug Catcher PAU Gorgon, Client: Chevron Australia Pty Ltd. Gorgon Upstream Fab. of Structure Vetcogray, Client : Chevron Austrlia Pty Ltd.

Piping & Structural Quantity Surveyor at McDermott Indonesia
  • Indonesia - Batam
  • May 2009 to November 2010

Piping & Structural - Esso KTT Turrum Phase 2, Client: Esso Australia Pty Ltd.

Sr. Commercial Officer at Drydock World Pertama
  • Indonesia - Batam
  • February 2009 to May 2009

Hull 8158, DSV4 & Hull 8191 DSV5 Super Heavyweight Vessel in each of LOA: 180M, Client: Coast Line Maritim, Pte. Ltd. Singapore - Hull 8184 & Hull 8185, AHTS No Name LOA : 75M, Hull 8186, Hull 8187 & Hull 8188 AHTS No Name LOA: 65M, Client: Bumi Armada Navigation Sdn. Bhd., Malaysia.

Commercial Officer at ASL Marine Shipyard
  • Indonesia - Batam
  • January 2008 to February 2009

Project:
MV Oxtende Max Cargo, LOA : 225M Repair, Client : Enterprises Shipping & Trading SA, Greece & Etc.

Asst. Commercial Officer at Batamec
  • Indonesia - Batam
  • December 2005 to January 2008

Project :
WB 3921 Repair, Client: Ch. Ship Management Pte. Ltd. Singapore; H-7034 Shipbulding - AHSV No. Name 60 M (6000 HP), Client: OSM Management Pte. Ltd. - Bollard Pull Test - Cutting Plate - Bending Plate - Rolling Plate & Etc.

Education

Bachelor's degree, Ocean Engineering/Teknik Kelautan
  • at Institut Teknologi Sepuluh November
  • September 2005

Modelling Current Pattern of Water on around dome and cubes of Artificial Reef

Specialties & Skills

Cost Management
Quantity Surveying
Schedules
Cost Estimation
Costing
Microsoft Office, SAP System
Cost Management, Estimation, communication, team work,

Languages

English
Intermediate

Hobbies

  • Swimming & Jogging