Sr. Process Engineer
Total years of experience :19 years, 7 Months
Bechtel Corporation (Gurgaon Haryana)
RIL HNUU and Platformer Revamp Project
Development of Process P&IDs, process datasheets and calculations for vessels, Column, heat exchangers, pumps, control valves, flow elements, PSVs etc and Hydraulics for Basic Engineering Design Package. Checking work of other engineers and coordination with other Lummus office.
BASF Petronas High Purity Isobutylene Plant
UOP - a Honeywell company (Gurgaon India)
FCC Unit Reactor Regeneration section for Naasiriya Project
Process Engineering
Basic engineering process design which included simulation in P9.8 and development of PFD.
Project work which includes hydraulics, vessel datasheet, Exchanger datasheet, pumps and compressor datasheet, PSV datasheet, miscellaneous datasheet development (Specs for Cyclones, Chemicals etc) and P&ID development for UOP Schedule A package.
Proposal for FCC Unit for Naasiriya Project
Process Engineering
FCC Unit Reactor Regeneration section for Rosneft Grozny
Process Engineering
Basic engineering process design which included simulation in P9.8 and development of PFD.
Project work which includes hydraulics, vessel datasheet, Exchanger datasheet, pumps and compressor datasheet, PSV datasheet, miscellaneous datasheet development (Specs for Cyclones, Chemicals etc) and P&ID development for UOP Schedule A package.
Fixed Bed Platforming Unit for Nasiriya Refinery
Process Engineering
Project Work which includes Hydraulics, Vessel Datasheet, Exchanger Datasheet, Pumps and Compressor Datasheet and P&ID development for UOP Schedule A package.
Penex Process Unit for Nghi Son Refinery, Vietnam
Process Engineering
Basic engineering process design which included simulation in P9.8, heat integration, optimization of columns and development of PFD.
Project Work which includes Hydraulics, Vessel Datasheet, Column datasheet, Exchanger Datasheet, Pumps and Compressor Datasheet, Safety Valve Datasheet and P&ID development for UOP Schedule A package.
Naphtha Splitter Column for Irving Oil Refinery, Canada
Process Engineering
Process simulation of column, optimization, PFD and P&ID development
Process Simulation, line sizing, BDV Calculations for Chevron FPSO.
Stripper Column design for BRPL.
Process Simulation, line sizing, BDV Calculations for Generic FPSO for Marginal Fields (Aquila Project).
East West Pipeline (Reliance Project).
Process Simulation, line sizing, BDV Calculations 2 Nos FGS and 1 Nos CGS (OIL India Ltd).
Process Simulation, line sizing, BDV Calculations and Safety Valve calculations for Gimboa FPSO.
Basic calculations like Boil off rate, flash gases rate calculations etc for LPG Storage Tank (IOPPL)
Jubilant Organosys, U.P. India
Material balance, PFD, Process datasheets and P&ID development for 2-Vinyl Pyridine plant.
Material balance, PFD, Process datasheets and P&ID development for 4-DMAP plant.
Process datasheets and P&ID development for Acetaldehyde plant.
Currently Project Engineering Lead for this project. Responsible for the checking work of other Engineers, preparation of P&IDs from UOP BEP, Pump/Compressor hydraulic calculations, non-pumped hydraulics, PSV lateral sizing, preparation of Material Requisition, Vendor Print review and HAZOP Item closeout. The project scope involves development of P&ID from IFA stage to IFC stage with associated equipment.
Feasibility study for Refinery Upgradation Project, Thaioil
Process Engineer
Calculation for utilities requirement, utility system design, preparation of Utility design basis and Technology comparison
from
in
in