sadarudheen valiyapalapilly, Cadd Production Coordinator

sadarudheen valiyapalapilly

Cadd Production Coordinator

Mustang Al-Hejailan Dar PI

Location
Saudi Arabia
Education
Diploma, civil engineering
Experience
15 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 2 Months

Cadd Production Coordinator at Mustang Al-Hejailan Dar PI
  • Saudi Arabia
  • September 2009 to December 2013

Mustang Al-Hejailan Dar PI, KSA (September 2009 - Present)

Cadd Production Coordinator
Presently working in Instrumentation Department as a Designer; mainly involved in Saudi Aramco on-going projects, for the preparation of various instrumentation drawings like ILD, Interconnection Diagram, Wiring Diagram, Block Diagram etc.
Site verification surveys to collect relevant design information to ensure safe and operational feasibility during detail design, Construction and Operation.
Had undergone a training section in Smart plant Instrumentation (IN-Tool) and Functional Safety System.
Project Title:
1. Installation of EIVs and upgradation of ESD system at Rastanura Refinery
2. Installation of closed drain system at Yanbu Refinery
3. Upgrade power transmission system at Abqaiq

4. Infra-structure support facility at Jazan Refinery

Duties and Responsibilities:
➢ Collecting data from project sites
➢ Searching relevant drawings from iPlant system
➢ Marking up and Modifying relevant drawings
➢ Assisting in development of Piping & Instrument diagram
➢ Preparation of Instrument Installation Details
➢ Preparation of Cable & Conduit Schedule
➢ Preparation of Interconnection diagram
➢ Responsible for preparation of Material Take-off Lists based on drawings.
➢ Preparation of IO List

Designer at Pi-Consult
  • December 2007 to August 2009

Pi-Consult (Bujafar Contracting Est., KSA (December 2007 - August 2009)
Designer

1. Surface Safety Enhancement@28 Abqaiq Wells
2. Tie-In@4 Shaybah Wells
3. Additional Pressure Transmitter for Pressure Reducing station@Abqaiq Plant
4. Demolition of Refrigeration System@Abqaiq Plant
5. Replacement of PLC with Triconex ESD System@Saffaniya Gosp
6. ESD System upgrade from Triconex Ver.6 to Ver.10@Saffaniya Gosp
7. Convert HV to MOV@South Stabilizer Abqaiq Plant
8. Replace Band Screen@Qurrayah Power Plant
9. Installation of PDHMS system at Abqaiq
10. Installation of MPFM, SHS panel at Nuayyim
11. Upgradation of propane loading station at Shedgum
12. Install of High Pressure System (HIPS) at Abqaiq, PDHMS@various areas for Saudi Aramco
13. Detailed engineering for Abu Hadriyah / Fadhili new oil drill sites & upgrading existing wells for Saudi Aramco

Duties and Responsibilities:
➢ Assisting in development of Piping & Instrument diagram
➢ Preparation of Block diagram
➢ Preparation of Loop diagram
➢ Preparation of Wiring diagram
➢ Preparation of Cable & Conduit Schedule
➢ Preparation of Interconnection diagram
➢ Preparation of demolition drawing (ILD, Interconnection diagram & Wiring diagram)
➢ Preparation of Hook-Up Drawings
➢ Preparation of Name plate details
➢ Checking the quality standards of drawings as per Aramco Standards

Draftsman at Saudi Tumpane Company
  • October 2002 to October 2007

Saudi Tumpane Company, KSA (October 2002 - October 2007)

Draftsman
Duties & Responsibilities: - Responsible for designing and preparation of Building Drawings.
- Responsible for the preparation of UG Sewer Network Drawings and Profiles from designing phase to as-built preparation phase.
- Designing and preparation of all the drawings related to Electro-Mechanical works. Responsible for preparation of as-built drawings by performing site surveys.
- Specially assigned for the coordinator between the Company and the Ministry for drawings submission, incorporation of comments and seeking approvals.
- Responsible for preparation of Material Take-off Lists based on drawings.
- Responsible for review and preparations of isometrics for major network piping works.
- Responsible for quantity calculations for UG piping and pump stations.

Draftsman at Muvattupuzha Construction Housing
  • India
  • September 1998 to August 2002

Muvattupuzha Construction Housing, India (September 1998 - August 2002)

Draftsman
Duties & Responsibilities
I was assigned with design, site supervision, preparation of detailed working drawings,
material statements and quantity calculations for multi-storied buildings (Apartment building and Shopping Complex), schools, industrial buildings villas, auditorium, hospitals.

Education

Diploma, civil engineering
  • at Board of Technical Education Kerala
  • May 1998

Diploma in civil engineering from Board of Technical Education Kerala 1998 Registrations / Associations /Certifications

Specialties & Skills

ELECTRO-MECHANICAL
MATERIAL TAKE-OFF
PUMP STATIONS
SITE SURVEYS
TAKE-OFF

Languages

English
Beginner