سعيد أحمد, Consultant

سعيد أحمد

Consultant

Cement Industry

البلد
باكستان
التعليم
بكالوريوس, Chemical Engineering
الخبرات
30 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :30 years, 0 أشهر

Consultant في Cement Industry
  • باكستان - إسلام أباد
  • أشغل هذه الوظيفة منذ أغسطس 2018

Integration of Management, Optimization and Cost reduction.
•Validation of expansion projects, Green field Cement Projects.
•EXCOM meetings,
•Cement Plant problems and solutions.
•Alternative fuels utilization and renewable Energy Projects.
•HSE guidelines.
•Potential Savings, implementation and evaluation.

Manager Production(HOD Production) ,Dy Plant Manager في United Cement
  • المملكة العربية السعودية - جدة
  • أبريل 2015 إلى يونيو 2018

Cement Plant (HOD)Production, Dy Plant Manager erection, commissioning, troubleshooting, optimization and smooth operation, Production and plant management.
Green field cement plant feasibility reoprt validation.
Brown field cement plant complete review and technical analysis.
Plant and Project completion within targetted date and achieved budgeted production.
Achieved all certification regarding international management standars, governmental NOCs and licences.
Water treatment plants and power plant commissioning and taken over from the suppliers and manufacturers

HOD في HSE
  • باكستان - إسلام أباد
  • مايو 2010 إلى أكتوبر 2014

2014, Bestway Cement Ltd. PAKISTAN,
Cement plant of capacity 1.2 million tons of MHI/FLS make.
•Production activities from crusher to packing plant, troubleshooting of process problems and coordinating maintenance activities with Mechanical, Electrical departments for annual and planned stoppages
•Coordination of production monthly review meeting, cost bench marking, comparison of cost saving parameters, and monitoring of KPIs
•Managed work force of 60staff; Production Engineers, CCR Operators, Technicians, Patrollers, Refractory management.
•Conducted feasibility study and implementation of alternative fuels’ usage
•Head of

Process Manager في Lafarge
  • إندونيسيا
  • يناير 2009 إلى مارس 2010

Process Omtimization, measurement, calculation and recommendations.
Technical budget, audit, procedures and establishment of SOPs .
Plant operationing protocols, Plant safety.VFL

Senior Dy Manager Production في Fauji Cemen
  • باكستان
  • يونيو 2006 إلى أغسطس 2008

3700-tpd ILC plus 5 Stage FLS Cement Plant).
•Monitoring of KPI of Kiln CM and RM
•Analyzing of Check lists.
•Reviewing pervious day plant performance, production achieved and problems faced and prepare/reviews and coordination with planned maintenance team.
•Safety inspection of plant site, information collection and diagnosis g, preparing guidelines and caution for safe practice for personals
•Personally monitoring of current operating conditions, production and quality levels provide necessary guidance/targets to kiln/mills operators and field operators.
•Identify, review and issue instruction to Instrument/PLC staff to implement process/equipment & safety interlocking.
•All production reports preparation, correspondence with vendors, government agencies/departments
•Annual Staff performance evaluation; Staff motivation, Performance management and appraisals
•Prepare specifications, raise indents, and evaluate offers and inspection of materials received
•Refractory work performance evaluation and relining plans
•Ball mill grinding media wear rate estimate, charge evaluation.
•To hold/attend special task/project meeting
•Participated in selection of new line of 7200TPD.capacity
•In charge of MIS & ERP system documentations and implementations; acted as Safety, Environmental & Health Engineer within the production department

Senior Dy Manager Production في Lucky Cement Ltd
  • باكستان
  • أكتوبر 2004 إلى يونيو 2006

Erection and Commissioned lines C &D projects having Clinker capacity 3300-TPD each

Assistant Manager في Army welfare Trust Nizampur Cement Plan
  • باكستان - بيشاور
  • سبتمبر 1996 إلى سبتمبر 2004

4000 TPD from TCDRI China, 5 Stage double strings ILC Cement Plant with Grate Cooler).

•Worked as Officiating Manager Production.
•Plant commissioning and operation
•Worked as Assistant Production Manager /QC/Kiln in charge/Cement Mill In charge

Assistant Manager في Kohat Cement
  • باكستان - لاهور
  • يونيو 1993 إلى أغسطس 1996

on XRF and carried out Chemical/Gravimetric chemical analysis of Cement, Clinker and raw materials.
•Kiln and Cement Mill operation and Shift Engineer.
•Kiln In charge, assistant Manager Production.

الخلفية التعليمية

بكالوريوس, Chemical Engineering
  • في Punjab University
  • يناير 1992

. Chemical Engineering

Specialties & Skills

Alternative Fuels
Plant Commissioning
Production
Process Auditing
OPTIMIZATION
COST CONTROL
MEETING FACILITATION
PRODUCTION MANAGEMENT
TROUBLESHOOTING
VALIDATION
Erection, commissioning, troubleshooting of cement plant
kiln operation, Optimization
Raw materials Optimization
Quality management
refraction management
Energy and fuel Optimization
water treatment
Alternative Fuels usage
Manpower Training and hiring
line production
production Manager
quality management systems
cement plant management
Head of department Quality Control
Operation
Negotiation
Materials

اللغات

الانجليزية
متمرّس
العربية
متوسط
الأوردو
اللغة الأم
الاندونيسية
مبتدئ

العضويات

Pakistan Engineering Council
  • Professional Membership
  • April 1993
Saudi Engg Council
  • Member
  • April 2015

التدريب و الشهادات

Project Management (الشهادة)
تاريخ الدورة:
October 2017
Refractory Management (تدريب)
معهد التدريب:
Refratechnik Germany
تاريخ الدورة:
October 2013
المدة:
56 ساعة
Advanced Cement Tech (الشهادة)
تاريخ الدورة:
November 2002

الهوايات

  • Cement Webinars
  • Reading
    Certified
  • Technical Books reading