Electrical Shift Superintendent
Kenana Sugar Company
Total years of experience :18 years, 1 Months
Excellent Operation, Inspection &Maintenance Sub-Station of Power Transmission and Distribution system.
Erection and Commissioning in( AIS & GIS) subs station
Switchgear, Circuit breakers, switchboards and panel board installation and termination.
Transmission lines, with measuring equipments, trip circuits and alarm system, primary injection test.
Transformers (HV&LV) Testing parameters, oil level, cooling system, fault signal analysis, tap changer increase and decrease.
Capacity calculation of (Cable, transformers, capacitor bank & switchgear)
Testing system for (Transformers, Circuit Breakers .Bus-bar, CTs, VTs, Relays Surge arrester, cable capacity and etc.
Using power Tools in sub-station yard and mechanism
Cable pulling and termination of different type of cables and sizes.
Lighting system installation circuit, cable size, towers and termination for street and gardens and parks.
Neutral grounding resistor (NGR)& Earth System installation and termination
Grounding and bonding cable pulling and termination Cad-welding for grounding branch circuits.
Power and grounding termination of motors of deferent sizes
Uninterruptable Power Supply (UPS) installation
Good experience in Protection System as Fault analysis, CTs ratio, CBs function and Relays operated.
Preparation of material requisitions, technical evaluation of spare parts.
Inspection & Maintenance in (220/110/33/11) KV Sub-Station of Power Transmission and Distribution system.
Switching and Isolate power system from Substation (AIS & GIS) Work with Erection Team of (220/110/33/11) KV Substaion.
Transformers Operation, Maintenance, Harmonic filters, distribution panels & capacitor banks & routine test
Distance Protection Relays function and analysis AREVA, MICOM relays programming using.
Protection system Fault analysis, CTs ratio, CBs function and Relays operated.
Capacity calculation of (Cable, transformers, capacitor bank & switchgear)
Using power Tools in sub-station yard and mechanism
DC Batteries ( charging and signaling from fault to relays to CB ) checking
Functional Test of the complete auxiliary power distribution system \[AC & DC\].
Shut down program cleaning and check isolated resistance for transformer, CB, CTs, VTs, surge arrester, bus-bar and all routine checking etc and installation Equipments (Transformers, BBs, CBs, Isolators, CTs, VTs, Surge arrester, incoming and outgoing feeders etc
B.s.c in Electrical Engineer-Power from Juba University in Sudan -Khartoum 14/5/2004 Second Class Division Tow My final project is PROTECTION SYSTEM OF SUB-STAION Trannig in Power system Generation Distribution and Protection Device (that was done in Sudanese National Electricity Corporation from 2003 to 2004 (Hydro -Power Plants and Thermal Power Plants MY Experience from 16/4/2006 up To Date SHIFT SUPERTENDENT in Kenana Sugar Company responsible for efficient operation and maintenance of Electrical MV/LV/H/V switchgear/system and distribution of power from Diesel Power Plant (HFO/LDO based) and Steam Turbines having total capacity of 70 MW, which is being utilizing for our irrigation, factory machineries and township during shift hours of crop/off crop operation exposing my technical skills during major over hauling of all 03 Nos diesel generating set’s electrical/control/instrumentation system, between November and July to bring the power plant operational within stipulated time