Sahuri Muchtar, Senior MEP Engineer

Sahuri Muchtar

Senior MEP Engineer

SHIMIZU CORPORATION, General Contractor

Location
Indonesia
Education
Higher diploma, Mechanical Engineering, study program of Maintenance and Repairs
Experience
27 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :27 years, 10 Months

Senior MEP Engineer at SHIMIZU CORPORATION, General Contractor
  • Indonesia
  • March 2013 to December 2015

Capable of assuming a greater leadership role to support PM/CM in managing high-rise buildings project laden with multifaceted responsibilities. Identified the design, bylaws, site requirements and technical documents. Set the planning and construction operations as per project quality plan. Checked the drawings, specs, phasing plans, MEP sequences and schedule. Selected the subcontractors to obtain offer, analyzed prices and comparison. Examined method statement, inspection test plan and shop drawings. Reviewed MEP technical submittals in compliance with the contract. Organized the materials sample to obtain approval from consultant/client. Implemented quality assurance to ensure that procedures during project maintained.

● Successfully managed the MEP/HVAC work of MNC Media Tower project (Park Hyatt six-star hotel and office buildings with level grade A) which is mixed-use buildings with 6B + G + L + 57 floors since early project started by coordinating all resources and ensured project stayed within scope and timelines.

● Maximized the use of company resources by planning and organizing each job with site engineer/inspector concerned. Prepared the manpower, materials, tools to ensure work completed on time. Enforced safety rules and monitored the MEP work activities to meet HSE requirements. Conducted daily briefing to follow-up on the site MEP work progress report. Checked inspector job duties and daily reports.

● Provided the total quality assurance to supervise the MEP work installed as per shop drawings approved. Logged, posted all the MEP changes into field drawings and documented. Raised and issued non‐conformance report of MEP services installed. Inspected the MEP installation with consultant refer shop drawings/specs.

● Communicated clearly and concisely in regular meetings to advise MEP contractors. Acted as liaison with consultant, engineer, subcontractors and concerned. Attended the meetings with construction team and client to report progress. Served site visit of local authority to clarify questions of approval process.

● Maintained the effective cost control to review MEP contractor claim and prepared approval or rejection. Checked change order request/variation so that legitimacy and confirmed.

● Demonstrated accuracy, thoroughness and orderliness in performing work to deliver snag list of outstanding work for repaired by subcontractor. Witnessed the testing and commissioning and examined the as built drawings.

MEP/HVAC Engineer at ETA - ASCON M&E DIVISION, MEP Contractor
  • United Arab Emirates - Dubai
  • July 2007 to July 2012

Demonstrated a strong ability to identify, analyze and solve problems in the project execution of high-rise buildings and railway. Checked the general specs, technical specs, contract drawings and BOQ. Analyzed the MEP system and equipment related with contract documents. Checked the individual and combined shop drawings including builder's work. Calculated the actual quantities take-off and submit materials requisition. Selected the qualified suppliers to present their products according to specs. Prepared the method statement, QC procedure and inspection test plan. Provided the submission of MEP documents and comment on submittals. Planned the work schedule, manpower, tools, materials and equipment. Raised the request for information to consultant/client to clarify ambiguities.

● Focus on results demonstrated the ability to manage MEP/HVAC work of Burj Al Salam mixed-use buildings project (hotel, residential, office) with 4B + G + L + 54 floors as well as the MEP/HVAC work of Emirates and Financial station of Dubai Metro Railway project by displaying technical competence in all phases of job.

● Effectively maintain leadership in a group environment to lead a team of MEP inspectors and supervisors for timely project completion. Provided the necessary instructions and technical assistance to subordinates.

● Showed professional attention for quality work to ensure that the work executed as per specs and shop drawings approved. Enforced strictly the QA/QC and safety procedures to MEP work performed. Documented the all MEP changes with log and post into field drawings. Identified the field constraints and prepared non-conformance report (NCR). Inspected the installations with consultant and prepared the progress report.

● Maintained the accurate documentation to review the MEP construction schedule and resolve any program delays. Checked daily report and recorded all activities including site issues. Checked QA/QC report and assessed the effectiveness corrective actions. Verified the payment of subcontractor as per completion of work performed.

● Displayed clarity in expressing views to discuss with construction manager any issues affecting construction work and contribute in coordination meetings with client, consultant and contractors.

● Achieved the results with accuracy and precision to conduct the final inspection work and provided the punch list. Performed the testing commissioning and prepared final documentation. Checked the as-built drawings to ensure correctness based on site condition.

Mechanical Engineer at Mc CONNELL DOWELL, EPC Contractor
  • Indonesia
  • August 2005 to May 2007

Created the satisfying solution as per organizational policies to handle pulp processing industry project by preparing the material, work schedule and final construction drawings. Coordinated the workforce, rigger, scaffold to erect equipment with mobile crane. Ensured safe practice on site as per health and safety plan approved. Provided technical solution and conducted the work inspections in progress.

● Provided strong evidence of specific accomplishments in performing responsibility of mechanical and piping works for Pulp Line-2 Development of RAPP project to increase production by 2 million tons of pulp per year and become one of largest industry in the world.

● Thoroughly analyze conditions and reaches independent decisions to ensure that installations in accordance with drawings, specifications and regulations. Monitored the assembly of steel frame platform, piping and fittings. Provided quality assurance of construction activity and safety standards. Supervised the erection of pumps, tanks, vessels, reactor, kiln and digester. Inspected the final installation with consultant and delivered the punch list.

● Demonstrated strong personal presentation skills to conduct safety talk meetings and set the site job duties every morning. Attended the internal meetings to report on progress and issues that arise. Actively participated in coordination meeting with client and consultant.

● Achieved consistently high results in executing the testing commissioning of mechanical and piping equipment. Handled the trouble-shooting and repair work during plant operation. Prepared the as-built drawings and conducted maintenance period.

MEP/HVAC Engineer at CEGELEC INDOKOMAS BUANA PERKASA, EPC Contractor
  • Indonesia
  • April 2003 to July 2005

Seasoned professional in facing problems with confidence and assurance to implement utility buildings of gas plant project by planning the engineering design, technical specs, shop drawings and materials. Delivered the submittals of HVAC, Plumbing, Fire Alarm and Fire Fighting. Prepared the method statement to ensure proposal meets the stated goals. Coordinated with relevant parties to review shop drawings related to MEP design.

● Built the strong sense of teamwork and purpose of the responsibility, authority and accountability for the MEP/HVAC work of Betara Gas Plant project ranging from design of utility buildings (central control room, switchgear, laboratory, guard house and workshop), construction phase until maintenance period.

● Performed the mechanical installation design of air conditioning system (package air chiller/air-cooled chiller, and split AC), plumbing system (potable water, cold water, hot water, sewer, ventilation and storm water), and fire protection (fire hydrant, fire sprinkler and fire alarm). Calculated the HVAC cooling load by using the Carrier software E20-II HAP to +25 Pascal of pressurized control room.

● Adhered the all policies, procedures and rules with consistent accuracy in performing the supervision of MEP work supervision and safety procedures. Ensured that subcontractors adhere quality records, regulations and safety. Solved the issues related to MEP installations during project activities. Maintained the inspection procedure to obtain quality assurance. Inspected the installation with consultant and raised non-conformance report.

● Performed with consistent accuracy to prepare the reports on a daily, weekly, monthly for all MEP site activities. Checked the minutes of meetings and reported MEP progress. Implemented the final testing and commissioning of MEP installation systems. Prepared the as-built drawings, billing to client and all final documentation.

● Conducted the maintenance period for 6 months from first handover. The project consortium executed between Chiyoda-Japan and Sembawang Corp-Singapore. The basic design criteria by Kvaerner Engineering and owned by PetroChina International Jabung LTD & Santa FE Energy Resources.

MEP Engineer at JOHNSON PACIFIC ENGINEERING, EPC Contractor
  • Indonesia
  • March 2000 to March 2003

Showed dynamic leadership qualities to take responsibility of mechanical works, electrical, piping and instrumentation of water treatment plant project. Checked the IFC drawings, contract conditions, specifications and tendering documents. Prepared the shop drawings, technical submittals and materials requisition. Organized the schedule, manpower, safety and coordinated with civil works. Prepared the ITP, method statements and ensure compliance during project.

● Maximized personal strengths in achieving outstanding project results to build raw water processing from surface water/river into clean water for Palembang urban population i.e. water intake, water treatment plant (gravity) and water distribution on WTP project with capacity 2 x 600 liters/sec.

● Effectively determine workable objectives to inspect the materials and quantity when received at project site. Oversaw work of flocculation, sedimentation, filtration, water distribution. Implemented the health, safety and environment requirement strictly on site. Ensured the installation compliance with specs and shop drawings approved. Implemented the QA/QC standards on worker and subcontractor at site. Coordinated the MEP activities that related to civil works. Solved the problems during construction which affect quality.

● Prevented the unproductive responses in weekly coordination meetings with consultant and client. Communicated with adjacent residents to mitigate the construction impacts.

● Conformed to strict tolerances inspected the installations with consultant and repaired as per punch list. Implemented the initial tests and commissioning for whole system. Coordinated with lab technician to set the dose of alum, lime and chlorine. Performed the final commissioning of all integrated system for one week.

● Managed paperwork efficiently and effectively to submit progress report, interim certificates and all final documentation. Prepared the as-built drawings, O&M manual and maintenance period.

MEP Inspector at MULIA INTAN LESTARI, Commercial Property Developer
  • Indonesia
  • August 1997 to March 2000

Performed the jobs effectively despite sudden deadlines and changing priorities in handling high-rise buildings project while promoting quality awareness. Checked the requirements of technical specification, drawings and schedule. Checked the ITP, method statement, QA/QC submitted by subcontractor. Coordinated with engineering team to approve the drawings submittals. Monitored the materials submission and inspected when received at the site.

● Successfully achieved consistently high results to handle the MEP work for Hotel Mulia project ( five-star hotel) with 2B + G + L + Mezzanine + 40 floors, 1012 rooms and 7 international restaurants first operated to serve 1000 athletes of SEA Games.

● Combined the technical competence with dependability and loyalty to supervise site activities to ensure full compliance with specs/shop drawings. Implemented project safety program, policy and procedure. Ensured that the latest version of applicable document provided at work site. Implemented the quality management systems for site supervision activities. Coordinated with other disciplines and contractors to ensure work qualified. Identified the potential safety issues and informed the contractor as record.

● Excelled in operational skills to inspect the MEP work and ensured the work quality meets requirements. Identified the quality deficiencies and raised non-conformance report (NCR). Prepared the snag list and follow up until repairing work completed. Followed up final inspection and approval required with relevant authority. Examined the site progress and interim payment application of contractor.

● Effective in analyzing relevant information to handle daily report and recorded all activities including site issues. Issued the site instruction concisely to avoid job failures and errors. Monitored and reported the contractor progress and all site activities. Attended the site technical coordination meetings to discuss project issues. Conducted meetings with buildings staff for feedback on outstanding work.

● Demonstrated strong personal effectiveness to participate in pre-commissioning and commissioning activities as required. Verified the accuracy of as-built drawings that reflect as-built site conditions. Checked the operation/maintenance manuals of contractor. Organized final acceptance of work and close the related contract.

MEP Inspector at JAYA CM, Construction Consulting Services
  • Indonesia
  • August 1990 to August 1997

Utilized the full ability to display to technical skills in managing the project of high-rise buildings and railway with reviewing construction documents and contractual discrepancy highlighted. Checked the document submission of schedule, S-Curve, MS, QCP and ITP. Checked the MEP shop drawings and materials proposed by contractor. Inspected the materials and equipment to ensure that it meets specification. Participated in factory acceptance test and site acceptance test as needed. Responded the contractor request for information to clarify ambiguities.

● Successfully demonstrated contributions and achievements to control MEP jobs on several projects i.e. Kemayoran Park Plaza International Hotel (four-star) with 2B + G + L + 14 floors with 280 rooms, Jatinegara Plaza (shopping mall) and Electrification of Serpong double track railways along 23 km (1500 VDC contact wire, messenger wire, feeder wire, earth wire, 6 kV cable, poles, accessories, rectifier substation and utility substation) including railway emplacements of 10 stations.

● Taken the positive action to meet precise standards to implement the Quality/HSE management systems. Ensured that work installed compliance with drawings and specifications. Inspected and reported the MEP activities as per ITP of QA/QC plan. Ensured that all approvals, permits, drawings are available for site activities.

● Improved administrative support systems to prepare daily and weekly report to client on last project condition. Issued the memo of instruction clearly and provided technical advice. Solved the non-conformance issues by working closely with site team. Issued the site observation report (SOR) and non-conformance report (NCR). Monitored the progress report and submitted the BOQ to get amount from client. Attended the weekly meeting with client/consultant to project completion.

● Achieved the results with accuracy and precision in monitoring the MEP snag outstanding minor work for contractor to action. Performed testing and commissioning using pantograph of electric railway. Witnessed the MEP testing commissioning to ensure performance as expected. Checked the MEP as-built drawings and ensured the site addressed properly. Prepared all procedures related to final documentation and project closing.

Mechanical Inspector at INDAH KIAT PULP & PAPER, Pulp Industry
  • Indonesia
  • July 1987 to July 1990

Maintained the high statistical accuracy to execute the power plant project with implemented the safety procedures and solved the mechanical issues. Inspected the mechanical installation as per schedule, specs and drawings. Reported, documented the inspection finding and fixed equipment repaired. Checked the welding of boiler pipe with non-destructive test/NDT (X-ray).

● Accentuated the strengths and demonstrate competent performance to manage the steam-boiler plant project i.e. Waste Heat Recovery Boiler, Electrostatic Precipitator and Wood Chip Boiler including auxiliary equipment (pump, piping, valve, tank, chimney, cooling tower, heat exchanger, steam turbine, conveyor, vacuum evaporator and steel structure) operated to meet production target to 500 tons of pulp per day.

● Displayed the strong analytical ability and technical skills to monitor the testing commissioning and checked the as-built drawings. Attended the site coordination meetings with vendors and contractors. Oversaw the maintenance period activities and all documents for handover.

Education

Higher diploma, Mechanical Engineering, study program of Maintenance and Repairs
  • at Polytechnic of Sriwijaya University
  • September 1986

Received a scholarship from the Sriwijaya University for 2 years, ranging from semesters 3,4,5 and 6.

Specialties & Skills

Site Supervision
Inspection
Plumbing
MS-Office, MS-Project & AutoCAD
HVAC, Plumbing & Fire Fighting
Water Treatment Plant & Steam-Boiler Plant
Progress Report, Meetings & Billing Quantity
Testing Commissioning & As-Built Drawings
Quality Control & Quality Assurance
Comprehension of Technical Standards & Codes
Material Quantity Take-Off & Inventory
Controlling Workforce & Safety Regulations
Shop Drawings & Technical Specifications
Mechanical, Electrical, Piping Work & Drainage
Sewage Treatment Plant & Water Pipelines

Languages

English
Expert
Indonesian
Native Speaker

Training and Certifications

QA / QC on Construction Management (Training)
Training Institute:
Jaya CM
Date Attended:
June 1993
Duration:
25 hours
High Pressure Piping Systems (Training)
Training Institute:
Jaya CM
Date Attended:
July 1993
Duration:
25 hours
HVAC, Plumbing and Fire Fighting (Training)
Training Institute:
Wahan Andalan & Jaya CM
Date Attended:
August 1996
Duration:
50 hours
HSE Orientation for Safety Awareness, Factors of Accident and Prevention, PPE and First Aid Kits (Training)
Training Institute:
CEGELEC INDOKOMAS BUANA PERKASA
Date Attended:
February 2005
Duration:
50 hours

Hobbies

  • Sports (jogging, calisthenics), reading, outings to the mountain/beach and surfing the internet.