سيف نوافله, Project Manager Engineer

سيف نوافله

Project Manager Engineer

alkhorayef

البلد
المملكة العربية السعودية - الرياض
التعليم
بكالوريوس, Civil And Environmental Engineering
الخبرات
16 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 1 أشهر

Project Manager Engineer في alkhorayef
  • المملكة العربية السعودية
  • أشغل هذه الوظيفة منذ فبراير 2020

project manager

Construction Manager في Salini Saudi Arabia Contracting Co. /
  • المملكة العربية السعودية - الرياض
  • فبراير 2018 إلى فبراير 2020

Salini Saudi Arabia Contracting Co. /Construction Manager Assistant/External Works (infrastructure and earth works). Saudi National Guard housing Project (6000 Villas, 7 million Sq. Meter)/ 5 billion SR.
Sewage treatment Plant with capacity of 30, 000 m3/day and lift station.

Civil Project Engineer في Ministry Of Education - Jordan
  • الأردن - اربد
  • سبتمبر 2016 إلى يناير 2018

• Supervising and monitoring all Maintenance and construction projects in the related region.
• Coordination with the donor organizations and following up the completion of projects as scheduled.
• Auditing the contractor’s invoices and preparing the payments accordingly.
• Attending all related meetings in the ministry to improve the quality of maintenance and develop the procedures of maintenance and facilities management.
• Analyzing the outputs of semiannual report of maintenance to evaluate the efficiency of programs of maintenance.
• Performing of training and workshops for the direct responsible teams in facilities to improve the sequence of maintenance requests and expedite the response of contractors as per the ministry procedures.

Zone Manager في Fawz contracting company
  • المملكة العربية السعودية - الرياض
  • مارس 2015 إلى سبتمبر 2016

• Surveying works and setting up the coordinates of stations and rout of buses.
• Prepare the mobilization plan for contractor and consultant offices as a part of mobilization stage in the project.
• Prepare the traffic management plan including the proper diversions for stations to start the stages of work from the excavation until finishing. "Project has been stopped due to government reasons and long unpaid leave had been issued for the staff continued from 02/2016 till 09/2016".

Sr. civil Engineer في Consolidated Contractors Company - Saudi Arabia
  • المملكة العربية السعودية - الرياض
  • مارس 2014 إلى فبراير 2015

• Coordination with the stakeholders to remove and replace the above and underground utilities those conflict the rail alignment.
• Attending meetings, and design review, issuing letters, following up and coordinate with all related departments to relocate the utilities as per the stakeholder’s standards, rules, and specifications.
• Managing and supervising all utilities relocation which was done by sub-contractors.

Sr. civil engineer في Consolidated Contractors Company - Saudi Arabia
  • المملكة العربية السعودية - جدة
  • أكتوبر 2013 إلى مارس 2014

• Execution of underground utilities, pipelines, different types (Sewer pipes, irrigation pipes, Firefighting …… Etc.) work contains all stages from setting out the lines up to testing and commissioning.
• Attending all construction meeting.
• Co-ordination with technical and other departments.
• Distribute the daily tasks to dependent engineers and supervisors.
• Follow up on daily basis with my team to achieve our weekly target.

Sr.civil Engineer في United Code Contracting Company
  • المملكة العربية السعودية - جدة
  • أكتوبر 2013 إلى أكتوبر 2013

• Managing all the execution activities and related requirements for a series of pipelines (different utilities, different Diameters, and deferent types.) To relocate the lines conflicting the rail alignment.
• The scope also includes the technical side like Drawings checking and submittals to get the approval from DAR Al-HANDASAH

Area Manager- construction في Al-Arrab Contracting Company
  • المملكة العربية السعودية - جدة
  • يوليو 2007 إلى أكتوبر 2012

Haramain Rail (HHR) Zone Manager (AL Medina Al-Munawara Sector, 85 KM)
• Direct area manager for a sector of 85 K.M which is called MADINA area (area 6) in the project.
• Responsibility was leading all the staff to execute the scope of company in the project.
• Our scope was around 300 million SR including infrastructure works (Box culverts, vehicle culverts, underground duct banks, relocation of existing utilities …. Etc.)
• In addition to execute the crash retaining wall at the main roads where the train will pass in the median.
• Attending all the meetings related to the project (biweekly progress Meeting with consultant, authorities’ monthly meeting, site meeting.... Etc.
• Monitoring the staff and equipment in my area.
• Preparing the required reports (daily, weekly, and monthly).
• Review design and shop drawing prior submission for consultant approval.
• Follow up with commercial and finance to ensure proper closing of P. O’s and contracts.

الخلفية التعليمية

بكالوريوس, Civil And Environmental Engineering
  • في Jordan University Of Science And Technology
  • فبراير 2007

اللغات

العربية
اللغة الأم

التدريب و الشهادات

PMP (الشهادة)
تاريخ الدورة:
November 2023
صالحة لغاية:
November 2027

الهوايات

  • reading, social