1- Liquid-Liquid Extraction Of Drilling Oil from "Fraction SS-300" (Complete Start-up Shutdown Activities)
"Honeywell DCS Control"
• Control Liquid-Liquid Extraction of Low Toxicity Kerosene Oil (Drilling Oil) and Hi-Aromatics by using NMP (N-Methyl Pyrolidone) as solvent.
• Control Washing and Dehydration of Drilling Oil (Low Toxicity Kerosene).
• Control Re-extraction of Hi-Aromatics from NMP by using Heptane.
• Control Washing and Dehydration of Hi-Aromatics.
• Control Recovery and Regeneration of NMP.
• Control Heptane Striping from Hi-Aromatics and NMP.
• Control Thermal Oil Heater for Heating Purpose.
2-Transfermer Oil Section: (Complete Start up and Shutdown Activities)
• Sulphonation of Dewaxed Oil with Sulfuric acid.
• Separation of Sulphonated Oil and Sludge.
• Washing of Sulphonated Oil.
• Neutralization of Sulphonated Oil (Transformer Oil).
• Colour Improving section.
• Addition of Chemical.
• Final Sampling and Loading.
WORKING AREAS:
1_Reforming Section (SMR Technology): (Complete Start up and Shutdown Activities)
"Delta V" DCS by Rosemount Emersion (American Technology)
• PD Compressor (Natural Gas Compressor)
• De-Sulphurizer.
• Steam Hydrocarbon Reformer (Balance Draft Reformer)
• High Temperature Shift Conversion (HTS).
• Hydrogen Purification Unit. (HPU)
• Steam Generation (Waste Heat Boiler)
2_Hydrogen Peroxide Section: (Complete Start up and Shutdown Activities)
"Advan Trol" DCS by Supcon (China Technology)
• Hydrogenation Reactor. (Fixed Bed Catalyst)
• Oxidation Reactor.
• Extraction Column.
• Purification Unit.
• Drying Section. (Drying of Working Solution with K2CO3)
• Evaporation Section.
• Air cooper Compressor (High flow 10, 000 CFM Centrifugal Air Compressor)
AUXILIARY SECTION:
• Demin Plant (408 m3/day Capacity). (complete startup and Shutdown)
• RO Plant (816 m3/day Capacity) (complete startup and Shutdown)
• Cooling Towers (Induced Drafts) (complete startup and Shutdown)
• Working Solution (TOP+EAQ+TMB) Preparation section.
• Preparation of K2CO3 Solution.
I worked as Utilities Operator in Rupafil Polyester Plant Lahore Pakistan.
• RO Plant Complete Complete Start-up and Shutdown.
• Centrifugal Compressors. Complete Start-up and Shutdown.
• Centrifugal Pumps. Complete Start-up and Shutdown.
• AHU (Air Handling Unit AC.) Complete Start-up and Shutdown.
• Air Dryers.
• Cooling Towers.
• Nitrogen Plant.