Planner
Absal paul
Total des années d'expérience :12 years, 3 Mois
Sama HQ renovation project
Four seasons renovation project
Project Planning Activities:
• Currently Resource loading & rectifying HCIS MEP Schedule for Optimize Manpower as per requirements of MEP Project Manager
• Actively supporting Project Manager for ADC Riyadh project by producing P6 based Construction Schedule, dealing with sub-contractor schedule though analysis & offering possible solutions using ‘what if’ scenarios in P6
• Successfully produced primavera P6 based schedule CKA Riyadh & CKA Jeddah project, based on design drawings & BOQ.
• I was able to meet NCSC& RMR projects requirement for schedule development in timely manner using Microsoft Project 2013, based on specs., Design Drawings & BOQ.
• Efficiently organized & optimized various tracking sheets not limited to Material tracking, Document submittals and Drawings (Design, As‐built & shop drawings) for number of disciplines of HCIS & SR projects.
• Effectively played my part in NAM Project Initiation activities i.e. Sub‐Contractor Matrix development, Quote & estimation Analysis.
• Assisted Projects Manager in Contracts Management by developing various analytical reports & track sheets related to Sub‐Contractor Scope, proposals, billings & close-out.
• Actively reviewing Schedules for 4 projects for Scheduling best practices, logic & other parameters
Organizational Restructuring
• Proposed Primavera P6 usage optimization through enhanced cost & resource loading with EVM analysis along with tracking of material resources up to project store level.
• Diligently assisting Projects Manager in company restructuring through evaluating Company’s Organogram, proposing optimized one with clear career paths, Job descriptions for number of departments & preparing EDMS proposal.
• Successfully produced a comprehensive comparative study of EAM solution that can fulfill company needs by integrating current SAP & Primavera P6 modules & creating transparency across the organization.
• Researched & approached up to 10 EAM service providers and came up with multi parameter matrix for EAM & ERP service provider selection.
• Actively supporting Projects’ Manager in Project Reporting system & Project Controls solution.
• Developed Primavera P6 schedule for Indus hospital project, 10 floor Hospital building with 4 towers & 10 floor ECOL building, Estimated the task durations using standard norms.
• Involved in Contractor Qualification, Project tendering & bidding process for contractors.
• Developed RYK, WTC Rawalpindi & Emporium Mall outlet site Design schedule.
• Developed detailed Construction Schedule and tracked Progress for RYK & Liberty Lahore Outlet.
• Responsible for Project management Knowledge area of HR activities for our client.
Was responsible for Primavera Based Project Schedule using Approved Construction Drawings & Specifications
As Planning Assistant,
Using Primavera P6 V8.2 release look ahead as per Project Manager’s need.
Involved in Monthly progress Reports
Involved in weekly schedule updates
Devised sheets for work weightages
Documenting productivity rates for project work force
As document control engineer,
Started from scratch with heaps of disorganized documents & with in 3months its now all archived on cloud, indexed
in separate file folders & now available to access for all relevant personnel.
Proposed Intranet based paperless document control using share point with detailed pros & cons of the proposed idea
Control & track Numbering system for new versions of documents
Keep track of pending documents
Weekly status of document in & out flows
AL-Karrar Engineering & General Contracting Company,
Making schedules using Microsoft Project 2013
Make daily progress reports for various project sites
Attending weekly project meetings
Has devised numerous project tracking & progress reporting documents
Streamlining & updating the company’s document numbering system
Involved in various managerial activities from managing NDT request to recordkeeping & follow‐ups
Acting as Project document Control for “West Qurna DS tank Basra project”
Develop spreadsheets for Company’s Overall Project status & EVM
Involved in Project surveys for understanding of scope of work
Involved in Bidding & tendering processes
Completed training of ROO document portal “Sharecat”
• Managing Al-KARRAR engineering Iraq project, joint venture with FLUOR & EXXON MOBIL
• Exposure to Primavera P6
• Familiarization to Projects on-line for data transfer
• Acquired 132 Hour OSH Professional Certificate
• Has done 3D modeling of the motor bike assembly line components for a aspirant Manufacturer
• Has done 3D modeling of a pneumatic press for a Vendor of Deep Freezer Manufacturing Company
presently working on a project at Pakistan State Oil's oil terminals
repair & maintenance of the tank
fabrication...coating...other engineering tasks...as per issued work order
As production engineering personnel
New machines development
3-D Design & modeling through Solid works 2010
Automation of work stations
Optimizing mechanisms for energy efficient systems
Setting standard working parameters
Process analysis
Installation & optimization of dust collection system
As shift engineer in Rim production department, 18thOctober’2011- 1st March 2012
Production & production related activities analysis
Exposure to SAP ERP system: production module (Business 1)
ISO 9001:2008 certified firm
Floor management, maximum machine & labor utilization, minimizing non-conformities
maintaining number of sheets relevant to daily floor activities
designed new production analyzing sheet
Internship ALLIED PRECISION ENGINEERING, June ’09 – July ’09 Exposure to working environment, challenges & their counter measures at various departments Competitive skills & achievements Sound Energy Audit knowledge Competitive statistical & Advanced MS-excel skills Alternate solution to indoor lightning through extensive use of optics(project) Project of gas chambers at garment factory from industrial safety perspective(project initial phase) Engineering & Management software skills AUTO-CAD 2007, Solid-Edge, PRO-ENGINEER, ANSYS C++, Visual BASIC MS-OFFICE 2010, MS-PROJECT 2007, MS-VISIO 2007, POM, TORA, MINITAB 16 Workshops & certificate courses Attended workshop of matlab by HPCC NEDUET Attended seminar on project management organized by SME NED chapter Attended a certificate course of supply chain management offered by NED ACADEMY Attended statistical process control seminar offered by PIQC Final year project Project was” production audit of rim production facility through OEE at “SUPER TECH. AUTO PARTS PVT. LTD.” Tools of Industrial engineering used were work measurement, time & motion study, 7 wastages, Work instruction sheets etc.