صلاح محمد, Project Site Manager

صلاح محمد

Project Site Manager

Trevi Group

البلد
العراق - اربيل
التعليم
بكالوريوس, Engineering
الخبرات
5 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :5 years, 2 أشهر

Project Site Manager في Trevi Group
  • العراق
  • يناير 2016 إلى يناير 2017
Project Site Manager
  • يناير 2016 إلى يناير 2017

Dohuk / Mosul / Iraq
Project name: Task Force Camp
➢ Implement company: STER Group.

Project Site Manager في ZOZIK GROUP
  • العراق
  • يناير 2015 إلى يناير 2017

Dohuk / Mosul / Iraq
Project name: Kalakji electricity 132/33 K.V. substation
➢ Implement company: KAR Group Co.
Position at work: Project and site manger
The project is located at Shekhan- Duhok and designed to serve the electricity sector in the
region. The Scope covers construction of;
- Activities:
1- The project was contained three apartments each apartment was three floors.
2- The project was consisting of three electric Transformer.
3- The project had designed on different elevations.
4- And also, consist of Main building with services
5- Include D.G. room
6- I was interested of the safety lots of
7- Responsibility: supervisor and execute all works and structural works for the project
and all finishing woks and estimation and installing all electricity devices.
8- Mechanical work.
9- Power distribution.
10- Fire wall between transformer
11- Electrical steel tower
5-ZOZIK Group/Kurdistan-Iraq

Project Site Manager في ASNGARAN Co
  • يناير 2014 إلى يناير 2016
Project Site Manager
  • يناير 2010 إلى يناير 2012

Dohuk / Mosul / Iraq
Project name: Qasrok electricity 33/11 K.V substation
➢ Implement company: ZOZIK GROUP CO.
Position at work: Site Engineer on Skeleton Structure & Supervisor on
finishing Works.
Activity in the project:
1- The project was consisting of 2 Transformer
2- The project had designed on different elevations.
3- And also, consist of Main building with services
4- Include D.G. room
5- Responsibility: supervisor and execute all works and structural works for the project
and all finishing woks and installing all electricity devices
6- Mechanical work.
7- Power distribution.
8- Electrical steel tower
6-Bkhtiar 1/Kurdistan-Iraq

Dohuk / Mosul / Iraq
  • إلى

Project name: MAINTENANCE GROUTING & REHABILITION OF BOTTOM OUTLET OF THE
MOSUL DAM & BUILDING A BIG MILITARY BASE.
➢ Implement company: TREVI Group (Italian company).

Consultant supervisor في Ministry of Water Resource and USA Army Corps
  • إلى
Project Site Manager
  • إلى

Establishment and Implementation of Planning, Managing, Supervising, Reporting and
Controlling of all progress, preparing Works schedules, QA/QC Reports, Progress Payment
Certificates, attending weekly coordination meetings with TREVI and presentation of
progress status summaries. Organizing and Managing Inspection Checks, tests in accordance
with requirements and standards.
The project is located at Mosul and designed to serve as a grouting facility and renovation of
the Grouting Tunnel Infrastructure and all related facilities inside-outside of the Dam. The
Scope covers construction of;
1. Main Mixing Plant 1
2. Main Mixing Plant 2
3. Main Mixing Plant 3
4. Main Yard.
5. Left Access Gallery.
6. Right Access Gallery.
7. Left Tunnel Power Access.
8. Right Tunnel Power Access.
9. The project was contained a certification of control and daily reports.
10. All Infrastructure of the Grouting including but not limited to;
a. Power Distribution.
b. Grouting Lines.
c. CIS Distribution.
d. Dewatering System.
e. Water and Waste Water systems.
• Level
2-STER Group/Kurdistan-Iraq

Consultant supervisor
  • إلى

Establishment and Implementation of Planning, Managing, Supervising, Reporting and
Controlling of all progress, preparing Works schedules, QA/QC Reports, Progress Payment
Certificates, attending weekly coordination meetings with TREVI and presentation of
progress status summaries. Organizing and Managing Inspection Checks, tests in accordance
with requirements and standards. Consultant and client are ministry of water resource and
USA Army Corps.
The project is located at Mosul and designed to serve as an establishment of Italian and
American staff and to serve Italian and American military. The Scope covers construction of;
1. Huge bankers
2. Huge buildings
3. Power distribution
4. CIS distribution
5. Water, waste water and firefighting distribution
6. Water treatment plant
7. Internal road
8. Huge Warehouse
9- The project was contained a certification of control and daily reports.
3-Asingran company/Kurdistan-Iraq

Consultant supervisor في Duhok Directorate of Construction &Housing
  • إلى
Site & Project Manager Engineer
  • إلى

The project is located at Bardarash- Duhok and designed to serve for those with limited
income. The Scope covers construction of;
activities:
1- Including big concrete water tank
2-Including green area and parking
3-Including Full Arc decorations as modern mosque related both
4-Architectural and Structural work
5-power distribution
6-Water, waste water and firefighting distribution
7- CIS line distribution
8-Long retaining wall
Responsibility: supervisor and execute all works and structural works for
the project and all finishing woks and estimation.
4-KAR Group/Kurdistan-Iraq

Project Site Manager في BAKHTIAR1 Co
  • إلى
Documentation & Supervisor Engineer
  • إلى

Activity
1- The project had three big water tank reservoirs.
2- The project had drainage channel line by long of (2km).
3- Water stop uses

الخلفية التعليمية

بكالوريوس, Engineering
  • في Duhok
  • مارس 2009

Specialties & Skills

AUTOCAD
CONSULTING
CUSTOMER RELATIONS
ENGINEERING
MECHANICAL
MICROSOFT WORKS
SUPERVISORY SKILLS

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الايطالية
متمرّس
التركية
متمرّس